WWTP_Vol II Specifications
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRTE – WASTEWATER TREATMENT
MOOSE, WY 9/4/2015
01 00 00 - 1
SPECIFICATIONS TABLE OF CONTENTS
SPECIFICATIONS
VOLUME 2
| GRTE | 149677 | |
| MOOSE | WASTEWATER | SYSTEM |
IMPROVEMENTS
(ADDRESS CRITICAL MOOSE WASTEWATER SYSTEM DEFICIENCIES)
01 00 00 - 2
TABLE OF CONTENTS
VOLUME 1
DIVISION 01 ‐ GENERAL REQUIREMENTS
| 01 | 10 | 00 | CONTRACT | MODIFICATION | PROCEDURES | ............................................................................... | |
| 01 | 11 | 00 | SUMMARY | OF | WORK | ................................................................................................................ |
| a. GEOTECHNICAL | INVESTIGATION | ................................................................................ | |
| b. FONSI | MITIGATION | ............................................................................................................ | |
| c. HAZARDOUS | MATERIAL | TESTING | .............................................................................. |
| 01 | 12 | 00 | NATURAL | FEATURES | PROTECTION | ............................................................................................ | ||
| 01 | 27 | 00 | DEFINITION | OF | CONTRACT | LINE | ITEMS | ........................................................................... |
| 01 | 31 | 00 | PROJECT | MANAGEMENT | & | COORDINATION | .................................................................... | |
| 01 | 32 | 16 | CONSTRUCTION | SCHEDULE | ........................................................................................................... | |||
| 01 | 32 | 33 | PHOTOGRAPHIC | AND | VIDEO | DOCUMENTATION | ........................................................... | |
| 01 | 33 | 23 | SUBMITTAL | PROCEDURES | ............................................................................................................. |
| a. LIST | OF | MATERIAL | SUBMITTALS | ................................................................................ | |
| 01 | 35 | 23 | SAFETY | REQUIREMENTS | ................................................................................................................ |
| 01 | 40 | 00 | QUALITY | REQUIREMENTS | .............................................................................................................. |
| STATEMENT | OF | STRUCTURAL | TESTS | & | SPECIAL | INSPECTIONS | .......................... | |
| 01 | 42 | 00 | REFERENCES.......................................................................................................................... | .... | ||||
| 01 | 50 | 00 | TEMPORARY | FACILITIES | AND | CONTROLS................................................................ | ....... | |
| 01 | 55 | 26 | TRAFFIC | CONTROL | ........................................................................................................................... | |||
| 01 | 57 | 19.11 | INDOOR | AIR | QUALITY | MANAGEMENT | ............................................................................... | |
| 01 | 57 | 19.12 | NOISE | & | ACOUSTICS | MANAGEMENT | ................................................................................... | |
| 01 | 57 | 23 | TEMPORARY | STORM | WATER | POLLUTION | PREVENTION | ........................................... |
| a. SWPPP | – | NOTICE | OF | TRANSFER | AND | ACCEPTANCE | .......................................... | |
| 01 | 67 | 00 | PRODUCT | REQUIREMENTS | ............................................................................................................ | |||
| 01 | 73 | 40 | EXECUTION | .................................................................................................................................. | ||||
| 01 | 74 | 19 | CONSTRUCTION | WASTE | MANAGEMENT | AND | DISPOSAL | ............................................ |
| PROJECT | WASTE | MANAGEMENT | PLAN | WORKSHEET | ............................................... |
| STANDARD | SOLID | WASTE | CONVERSIONS | ..................................................................... |
| 01 | 77 | 00 | CLOSEOUT | PROCEDURES | ................................................................................................................ | |||||||||||
| 01 | 78 | 23 | OPERATION | AND | MAINTENANCE | DATA | ............................................................................ | |||||||||
| 01 | 79 | 00 | DEMONSTRATION | AND | TRAINING | .............................................................................................. | ||||||||||
| 01 | 81 | 13 | SUSTAINABLE | DESIGN | REQUIREMENTS | FOR | NON‐LEED | PROJECTS | ........................ | |||||||
| 01 | 91 | 14 | COMMISSIONING | ........................................................................................................................ | ||||||||||||
| 01 | 92 | 00 | CLOSEOUT | AND | OPERATION | & | MAINTENANCE | REQUIREMENTS | ............................... |
DIVISION 02 – EXISTING CONDITIONS
02 41 16 STRUCTURE DEMOLITION
DIVISION 03 – CONCRETE
| 03 | 30 | 00 | CAST‐IN‐PLACE | CONCRETE | ............................................................................................................ | |
| 03 | 37 | 00 | CONCRETE | CURING | .................................................................................................................... | |
| 03 | 41 | 00 | PRECAST | STRUCTURAL | CONCRETE | ..................................................................................... |
| 03 | 60 | 00 | GROUTING | .................................................................................................................................... |
01 00 00 - 3
DIVISION 04 – MASONRY
04 22 00 CONCRETE UNIT MASONRY
DIVISION 05 – METALS
| 05 | 12 | 00 | STRUCTURAL | STEEL | FRAMING | ............................................................................................. | ||
| 05 | 21 | 00 | STEEL | JOIST | FRAMING | ............................................................................................................. | ||
| 05 | 31 | 00 | STEEL | DECKING | .......................................................................................................................... | |||
| 05 | 40 | 00 | COLD | FORMED | METAL | FRAMING | ......................................................................................... | |
| 05 | 50 | 00 | METAL | FABRICATIONS | ............................................................................................................ | |||
| 05 | 50 | 10 | ANCHOR | BOLTS | AND | EXPANSION | ANCHORS | ................................................................... |
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
| 06 | 10 | 00 | ROUGH | CARPENTRY. | ................................................................................................................ | |
| 06 | 16 | 00 | SHEATHING | ................................................................................................................................. | ||
| 06 | 64 | 00 | PLASTIC | PANELING | ................................................................................................................... | |
| 06 | 82 | 00 | GLASS‐FIBER‐REINFORCED | PLASTIC | FABRICATIONS | .................................................. |
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
| 07 | 11 | 13 | BITUMINOUS | DAMPROOFING | ............................................................................................... | |||
| 07 | 13 | 26 | SELF‐ADHERING | SHEET | WATERPROOFING | ..................................................................... | ||
| 07 | 16 | 16 | CRYSTALLINE | WATERPROOFING | ........................................................................................ | |||
| 07 | 21 | 00 | THERMAL | INSULATION | ........................................................................................................... | |||
| 07 | 25 | 00 | WEATHER | BARRIERS | ............................................................................................................... | |||
| 07 | 26 | 00 | VAPOR | RETARDERS | .................................................................................................................. | |||
| 07 | 41 | 13.16 | STANDING‐SEAM | METAL | ROOF | PANELS | ........................................................................... | |
| 07 | 46 | 19 | STEEL | SIDING | .............................................................................................................................. | |||
| 07 | 62 | 00 | SHEET | METAL | FLASHING | AND | TRIM | .................................................................................. |
| 07 | 72 | 53 | SNOW | GUARDS | ........................................................................................................................... | |||
| 07 | 84 | 43 | JOINT | FIRESTOPPING | ............................................................................................................... | |||
| 07 | 92 | 00 | JOINT | SEALANTS | ........................................................................................................................ |
VOLUME 2
DIVISION 08 – OPENINGS
| 08 | 11 | 13 | HOLLOW | METAL | DOORS | AND | FRAMES | ............................................................................. |
| 08 | 31 | 00 | FLOOR | ACCESS | DOOR | ............................................................................................................... | ||
| 08 | 33 | 23 | OVERHEAD | COILING | DOORS | .................................................................................................. | ||
| 08 | 51 | 13 | ALUMINUM | WINDOWS | ............................................................................................................ | |||
| 08 | 71 | 00 | DOOR | HARDWARE | .................................................................................................................... | |||
| 08 | 80 | 00 | GLAZING | ........................................................................................................................................ | ||||
| 08 | 91 | 19 | FIXED | LOUVERS | ......................................................................................................................... |
01 00 00 - 4
DIVISION 09 – FINISHES
| 09 | 22 | 16 | NON‐STRUCTURAL | METAL | FRAMING | ................................................................................ | |
| 09 | 29 | 00 | GYPSUM | BOARD | ......................................................................................................................... | ||
| 09 | 30 | 00 | TILING | ........................................................................................................................................... | |||
| 09 | 65 | 13 | RESILIENT | BASE | AND | ACCESSORIES | ................................................................................... |
| 09 | 65 | 19 | RESILIENT | TILE | FLOORING | .................................................................................................... | |
| 09 | 72 | 00 | WALL | COVERINGS | ..................................................................................................................... | ||
| 09 | 91 | 13 | EXTERIOR | PAINTING | ................................................................................................................ | ||
| 09 | 91 | 23 | INTERIOR | PAINTING | ................................................................................................................ | ||
| 09 | 96 | 00 | HIGH‐PERFORMANCE | COATINGS | ......................................................................................... |
DIVISION 10 – SPECIALTIES
| 10 | 14 | 23 | PANEL | SIGNAGE | ......................................................................................................................... | |||
| 10 | 26 | 00 | WALL | AND | DOOR | PROTECTION | ........................................................................................... | |
| 10 | 28 | 00 | TOILET, | BATH, | AND | LAUNDRY | ACCESSORIES | ................................................................. |
DIVISION 11 – EQUIPMENT
11 31 00 RESIDENTIAL APPLIANCES
DIVISION 12 – FURNISHINGS
| 12 | 21 | 13 | HORIZONTAL | LOUVER | BLINDS | ............................................................................................. |
| 12 | 35 | 53.16 | PLASTIC‐LAMINATE‐CLAD | LABORATORY | CASEWORK | ................................................ |
DIVISION 13 – SPECIAL CONSTRUCTION
(NOT USED)
DIVISION 14 – CONVEYING EQUIPMENT
(NOT USED)
DIVISION 21 – FIRE SUPPRESSION
(NOT USED)
DIVISION 22 – PLUMBING
| 22 | 05 | 17 | SLEEVES | AND | SLEEVE | SEALS | FOR | PLUMBING | PIPING | .................................................. | |
| 22 | 05 | 18 | ESCUTCHEONS | FOR | PLUMBING | PIPIN | ................................................................................ | ||||
| 22 | 05 | 23 | GENERAL‐DUTY | VALVES | FOR | PLUMBING | PIPING | .......................................................... | |||
| 22 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | PLUMBING | PIPING | AND | EQUIPMENT | ................... |
| 22 | 07 | 19 | PLUMBING | PIPING | INSULATION | .......................................................................................... | |||||
| 22 | 11 | 16 | DOMESTIC | WATER | PIPING | ..................................................................................................... | |||||
| 22 | 11 | 19 | DOMESTIC | WATER | PIPING | SPECIALTIES | .......................................................................... | ||||
| 22 | 13 | 16 | SANITARY | WASTE | AND | VENT | PIPING | ................................................................................ |
01 00 00 - 5
| 22 | 13 | 19 | SANITARY | WASTE | PIPING | SPECIALTIES | ........................................................................... |
| 22 | 33 | 00 | ELECTRIC, | DOMESTIC‐WATER | HEATERS | .......................................................................... | |
| 22 | 42 | 13.13 | COMMERCIAL | WATER | CLOSETS | ........................................................................................... | |
| 22 | 42 | 16.13 | COMMERCIAL | LAVATORIES | ................................................................................................... | ||
| 22 | 42 | 16.16 | COMMERCIAL | SINKS | ................................................................................................................. | ||
| 22 | 42 | 23 | SHOWER | FAUCETS | .................................................................................................................... | ||
| 22 | 45 | 00 | EMERGENCY | PLUMBING | FIXTURES | ..................................................................................... |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
| 23 | 05 | 13 | COMMON | MOTOR | REQUIREMENTS | FOR | HVAC | EQUIPMENT...................................... | |
| 23 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | HVAC | ........................................................... |
| 23 | 05 | 53 | IDENTIFICATION | FOR | HVAC | PIPING | AND | EQUIPMENT | ............................................... |
| 23 | 05 | 93 | TESTING, | ADJUSTING, | AND | BALANCING | HVAC | ............................................................... | |
| 23 | 07 | 13 | DUCT | INSULATION | .................................................................................................................... | ||||
| 23 | 09 | 23.12 | CONTROL | DAMPERS | ................................................................................................................. | ||||
| 23 | 31 | 13 | METAL | DUCTS | ............................................................................................................................. | ||||
| 23 | 31 | 19 | HVAC | CASINGS | ............................................................................................................................ | ||||
| 23 | 33 | 00 | AIR | DUCT | ACCESSORIES | .......................................................................................................... | |||
| 23 | 34 | 16 | CENTRIFUGAL | HVAC | FANS | ..................................................................................................... | |||
| 23 | 34 | 23 | HVAC | POWER | VENTILATORS | ................................................................................................ | |||
| 23 | 37 | 13 | DIFUSERS, | REGISTERS, | AND | GRILLES | ................................................................................. | ||
| 23 | 74 | 33 | DEDICATED | OUTDOOR | AIR | UNITS | ...................................................................................... | ||
| 23 | 81 | 26 | SPLIT‐SYSTEM | AIR‐CONDITIONERS | ................................................................................... | ||||
| 23 | 82 | 16 | ELECTRIC‐RESISTANCE | AIR | COILS | ...................................................................................... | |||
| 23 | 82 | 39 | UNIT | HEATERS | ........................................................................................................................... |
DIVISION 25 – INTEGRATED AUTOMATION
| 25 | 30 | 00 | INSTRUMENTATION | AND | CONTROL | FOR | PROCESS | SYSTEMS | ................................... |
| 25 | 51 | 00 | INTEGRATED | AUTOMATION | CONTROL | OF | FACILITY | EQUIPMENT | ......................... |
DIVISION 26 – ELECTRICAL
| 26 | 00 | 00 | BASIC | ELECTRICAL | REQUIREMENTS | .................................................................................. | ||||||
| 26 | 05 | 19 | LOW | VOLTAGE | ELECTRICAL | POWER | CONDUCTORS | AND | CABLES | .......................... | ||
| 26 | 05 | 23 | CONTROL‐VOLTAGE | ELECTRICAL | POWER | CABLES | ....................................................... | |||||
| 26 | 05 | 26 | GROUNDING | AND | BONDING | FOR | ELECTRICAL | SYSTEMS | ............................................ | |||
| 26 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | ELECTRICAL | SYSTEMS | ............................................... | |||
| 26 | 05 | 33.10 | RACEWAYS | ................................................................................................................................... | ||||||||
| 26 | 05 | 33.20 | BOXES, | ENCLOSURES | AND | CABINETS | ................................................................................. | |||||
| 26 | 05 | 36 | CABLE | TRAYS | FOR | ELECTRICAL | SYSTEMS | ........................................................................ | ||||
| 26 | 05 | 43 | UNDERGROUND | DUCTS | AND | RACEWAYS | FOR | ELECTRICAL | SYSTEMS | ................... | ||
| 26 | 05 | 44 | SLEEVES | AND | SLEEVE | SEALS | FOR | ELECTRICAL | RACEWAYS | AND | CABLING | .......... |
| 26 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | ELECTRICAL | SYSTEMS | .......................... | ||
| 26 | 05 | 53 | ELECTRICAL | SYSTEMS | IDENTIFICATIONS | ........................................................................ | ||||||
| 26 | 05 | 73 | OVERCURRENT | PROTECTIVE | DEVICE | COORDINATION | STUDY | AND | ARC | FLASH |
| HAZARD | ANALYSIS | .................................................................................................................. | |||||
| 26 | 05 | 83 | EQUIPMENT | WIRING | SYSTEMS | ............................................................................................. | |
| 26 | 05 | 93 | ELECTRICAL | SYSTEMS | FIRE | STOPPING | ............................................................................. |
01 00 00 - 6
| 26 | 09 | 35 | TELEPHONE | AUTOMATIC | DIALER | SYSTEM | ...................................................................... | |
| 26 | 22 | 00 | LOW‐VOLTAGE | TRANSFORMERS | ......................................................................................... | |||
| 26 | 24 | 16 | PANELBOARDS | ........................................................................................................................... | ||||
| 26 | 24 | 17 | ROLL‐UP | GENERATOR | TERMINATION | CABINET | ............................................................ | |
| 26 | 27 | 13 | ELECTRICITY | METERING | ||||
| 26 | 27 | 26 | WIRING | DEVICES | ....................................................................................................................... | |||
| 26 | 28 | 13 | FUSES | ............................................................................................................................................. | ||||
| 26 | 28 | 16 | ENCLOSED | SWITCHES | AND | CIRCUIT | BREAKERS | ............................................................ |
| 26 | 29 | 13 | ENCLOSED | CONTROLLERS | ...................................................................................................... | |||
| 26 | 29 | 23 | VARIABLE‐FREQUENCY | MOTOR | CONTROLLERS | ............................................................ | ||
| 26 | 32 | 13 | ENGINE | GENERATORS | .............................................................................................................. | |||
| 26 | 36 | 00 | TRANSFER | SWITCHES | .............................................................................................................. | |||
| 26 | 41 | 13 | LIGHTNING | PROTECTION | ....................................................................................................... | |||
| 26 | 43 | 00 | TRANSIENT | VOLTAGE | SUPPRESSION | ................................................................................. | ||
| 26 | 51 | 00 | INTERIOR | LIGHTING | AND | EXTERIOR | LIGHTING | ............................................................ |
| 26 | 90 | 30 | PROGRAMMABLE | LOGIC | CONTROLLERS | .......................................................................... |
VOLUME 3
DIVISION 27 – COMMUNICATIONS
| 27 | 05 | 28 | PATHWAYS | FOR | COMMUNICATIONS | SYSTEMS | .............................................................. | |
| 27 | 10 | 00 | COMMUNICATIONS | AND | SECURITY | GENERAL | REQUIREMENTS | ............................... |
| 27 | 13 | 23 | FIBER | OPTIC | CABLE | DISTRIBUTION | SYSTEM………………………………………………….. |
DIVISION 28 – ELECTRONICS SAFETY AND SECURITY
| 28 | 16 | 11 | INTRUSION | DETECTION | SYSTEM | ......................................................................................... | ||
| 28 | 31 | 11 | DIGITAL, | ADDRESSABLE | FIRE | ALARM | SYSTEM | .............................................................. |
DIVISION 31 – EARTHWORK
| 31 | 05 | 13 | SOILS | FOR | EARTHWORK......................................................................................................... | |
| 31 | 05 | 16 | AGGREGATES | FOR | EARTHWORK | ......................................................................................... |
| 31 | 10 | 00 | SITE | CLEARING | ........................................................................................................................... | |
| 31 | 23 | 16 | EXCAVATION | ............................................................................................................................... | ||
| 31 | 23 | 17 | TRENCHING | ................................................................................................................................. | ||
| 31 | 23 | 18 | ROCK | REMOVAL | ......................................................................................................................... | |
| 31 | 23 | 19 | DEWATERING | ............................................................................................................................. | ||
| 31 | 23 | 23 | FILL | ................................................................................................................................................. | ||
| 31 | 23 | 24 | FLOWABLE | FILL | ......................................................................................................................... |
DIVISION 32 – EXTERIOR IMPROVEMENTS
| 32 | 12 | 16 | ASPHALT | PAVING | ...................................................................................................................... | |||
| 32 | 15 | 43 | STABILIZED | AGGREGATE | PATHWAYS | ............................................................................... | ||
| 32 | 16 | 13 | CONCRETE | CURBS, | GUTTER | AND | SIDEWALKS | ................................................................ |
| 32 | 17 | 23 | PAVEMENT | MARKINGS | ............................................................................................................ |
01 00 00 - 7
32 91 19.13 TOPSOIL PLACEMENT AND GRADING
DIVISION 33 – UTILITIES
| 33 | 05 | 13 | MANHOLES | AND | STRUCTURES | ............................................................................................. | ||
| 33 | 12 | 13 | WATER | SERVICE | CONNECTIONS | .......................................................................................... | ||
| 33 | 13 | 00 | DISINFECTING | OF | WATER | UTILITY | DISTRIBUTION | ..................................................... |
| 33 | 31 | 00 | SANITARY | UTILITY | SEWERAGE | PIPING | ............................................................................ | |
| 33 | 32 | 16 | PACKAGED | UTILITY | WASTEWATER | PUMPING | STATION | ........................................... |
| 33 | 34 | 00 | SANITARY | UTILITY | SEWERAGE | FORCE | MAINS | ............................................................... |
DIVISION 34 – TRANSPORTATION
(NOT USED)
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
(NOT USED)
DIVISION 40 – PROCESS INTEGRATION
| 40 | 05 | 13 | COMMON | WORK | RESULTS | FOR | PROCESS | PIPING | .......................................................... | ||
| 40 | 05 | 13.13 | STEEL | PROCESS | PIPING | ........................................................................................................... | |||||
| 40 | 05 | 13.19 | STAINLESS | STEEL | PROCESS | PIPING | .................................................................................... | ||||
| 40 | 05 | 13.53 | DUCTILE, | MALLEABLE, | AND | CAST | IRON | ALLOYS | PROCESS | PIPING | ......................... |
| 40 | 05 | 13.73 | PLASTIC | PROCESS | PIPING | ...................................................................................................... | |||||
| 40 | 05 | 23 | COMMON | WORK | RESULTS | FOR | PROCESS | VALVES | ......................................................... | ||
| 40 | 05 | 23.12 | BALL | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.15 | GATE | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.18 | BUTTERFLY | VALVES | ................................................................................................................. | ||||||
| 40 | 05 | 23.21 | PLUG | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.24 | CHECK | VALVES | ........................................................................................................................... | ||||||
| 40 | 05 | 23.72 | MISCELLANEOUS | PROCESS | VALVES | ..................................................................................... | |||||
| 40 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | PROCESS | PIPING | AND | EQUIPMENT | ....................... |
| 40 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | PROCESS | PIPING | ..................................... | |
| 40 | 05 | 53 | IDENTIFICATION | FOR | PROCESS | PIPING | ............................................................................ | ||||
| 40 | 23 | 19 | PROCESS | PLANT | WATER | PIPING | ......................................................................................... |
DIVISION 41 – MATERIALS PROCESSING AND HANDLING EQUIPMENT
41 22 23 BRIDGE CRANE SYSTEM AND HOISTS
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
(NOT USED)
| DIVISION | 43 | – | PROCESS | GAS | AND | LIQUID | HANDLING, | PURIFICATION, | AND |
| STORAGE | EQUIPMENT |
43 05 10 COMMON WORK RESULTS FOR GAS HANDLING EQUIPMENT
01 00 00 - 8
| 43 | 05 | 20 | COMMON | WORK | RESULTS | FOR | LIQUID | HANDLING | EQUIPMENT | ............................ |
| 43 | 11 | 33 | ROTARY | POSITIVE | DISPLACEMENT | BLOWERS | ............................................................... | |||
| 43 | 21 | 13 | CENTRIFUGAL | LIQUID | PUMPS | .............................................................................................. | ||||
| 43 | 21 | 36 | POSITIVE | DISPLACEMENT | LIQUID | PUMPS | ....................................................................... | |||
| 43 | 21 | 39 | SUBMERSIBLE | LIQUID | PUMPS | .............................................................................................. | ||||
| 43 | 22 | 17 | SUBMERSIBLE | LIQUID | MIXER | ............................................................................................... |
DIVISION 44 – POLLUTION CONTROL EQUIPMENT
44 10 00 BI‐POLAR IONIZATION ODOR CONTROL SYSTEM
DIVISION 45 – INDUSTRY – SPECIFIC MANUFACTURING EQUIPMENT
(NOT USED)
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
| 46 | 05 | 13 | COMMON | MOTOR | REQUIREMENTS | FOR | WATER | AND | WASTEWATER | |
| EQUIPMENT | ................................................................................................................................. | |||||||||
| 46 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | WATER | AND | WASTEWATER |
| EQUIPMENT | ................................................................................................................................ | |||||||||||||||||
| 46 | 05 | 53 | IDENTIFICATION | FOR | WATER | AND | WASTEWATER | EQUIPMENT | ............................ | |||||||||
| 46 | 05 | 90 | MISCELLANEOUS | WATER | AND | WASTEWATER | EQUIPMENT | ..................................... | ||||||||||
| 46 | 21 | 75 | PERFORATED | PLATE | MECHANICAL | SCREEN | ................................................................... | |||||||||||
| 46 | 36 | 33 | VOLUMETRIC | FEED | EQUIPMENT | ......................................................................................... | ||||||||||||
| 46 | 51 | 21 | COARSE | BUBBLE | DIFFUSERS | ................................................................................................. | ||||||||||||
| 46 | 51 | 23 | FINE | BUBBLE | DIFFUSERS | ....................................................................................................... | ||||||||||||
| 46 53 | 49 | MEMBRANE | BIOREACTOR | v5 | ................................................................................................ | |||||||||||||
| MBR | PERFORMANCE | QUESTIONNAIRE | AND | LIFE | CYCLE | COST | ANALYSIS | FORMS |
DIVISION 48 – ELECTRICAL POWER GENERATION
(NOT USED)
GRTE - 149677 – WWTP
120115
08 11 13 - 1
HOLLOW METAL DOORS AND FRAMES
SECTION 08 11 13 - HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes hollow-metal work.
B. Related Requirements:
1. Section 08 71 00 "Door Hardware" for door hardware for hollow-metal doors.
1.3 COORDINATION
A. Coordinate anchorage installation for hollow-metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, core descriptions, fire-resistance ratings, temperature-rise ratings, and finishes.
B. Shop Drawings: Include the following:
1. Elevations of each door type.
2. Details of doors, including vertical- and horizontal-edge details and metal thicknesses.
3. Frame details for each frame type, including dimensioned profiles and metal thicknesses.
4. Locations of reinforcement and preparations for hardware.
5. Details of each different wall opening condition.
6. Details of anchorages, joints, field splices, and connections.
7. Details of accessories.
8. Details of moldings, removable stops, and glazing.
9. Details of conduit and preparations for power, signal, and control systems.
C. Samples for Verification:
08 11 13 - 2
HOLLOW METAL DOORS AND FRAMES
1. For each type of exposed finish required, prepared on Samples of not less than 3 by 5 inches.
D. Schedule: Provide a schedule of hollow-metal work prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.
Coordinate with final Door Hardware Schedule.
1.5 INFORMATIONAL SUBMITTALS
A. Product Test Reports: For each type of hollow-metal door and frame assembly, for tests performed by a qualified testing agency.
1.6 QUALITY ASSURANCE
A. Comply with Architectural Barriers Act Accessibility Standards (ABAAS) and DSC Accessibility Requirements.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver hollow-metal work palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic.
1. Provide additional protection to prevent damage to factory-finished units.
B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions.
C. Store hollow-metal work vertically under cover at Project site with head up. Place on minimum 4-inch- high wood blocking. Provide minimum 1/4-inch space between each stacked door to permit air circulation.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering product that may be incorporated into the work include, but are not limited to the following:
1. Ceco Door Product; an ASSA ABLOY Group Company.
2. CURRIES Company; an ASSA ABLOY Group Company.
3. Mesker Door Inc.
4. Pioneer Industries, Inc.
5. Philipp Manufacturing Company.
6. Republic Builders Products Company.
7. Steelcraft; an Ingersoll-Rand Company.
8. American Steel Product, Inc.
08 11 13 - 3
HOLLOW METAL DOORS AND FRAMES
B. Source Limitations: Obtain hollow-metal work from single source from single manufacturer.
2.2 REGULATORY REQUIREMENTS
A. Fire-Rated Assemblies: Complying with NFPA 80 and listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings and temperature-rise limits indicated, based on testing at positive pressure according to NFPA 252 or UL 10C.
1. Smoke- and Draft-Control Assemblies: Provide an assembly with gaskets listed and labeled for smoke and draft control by a qualified testing agency acceptable to authorities having jurisdiction, based on testing according to UL 1784 and installed in compliance with NFPA 105.
B. Fire-Rated, Borrowed-Lite Assemblies: Complying with NFPA 80 and listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction for fire-protection ratings indicated, based on testing according to NFPA 257 or UL 9.
2.3 INTERIOR DOORS AND FRAMES
A. Construct interior doors and frames to comply with the standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.
B. Standard-Duty Doors and Frames: SDI A250.8, Level 1.
1. Physical Performance: Level C according to SDI A250.4.
2. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches.
c. Face: Metallic-coated, cold-rolled steel sheet, minimum thickness of 0.032 inch.
d. Edge Construction: Model 2, Seamless.
e. Core: Manufacturer's standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core at manufacturer's discretion.
3. Frames:
a. Materials: Metallic-coated, cold-rolled steel sheet, minimum thickness of 0.042 inch.
b. Construction: Full profile welded.
4. Exposed Finish: Prime.
2.4 EXTERIOR HOLLOW-METAL DOORS AND FRAMES
A. Construct exterior doors and frames to comply with the standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.
08 11 13 - 4
HOLLOW METAL DOORS AND FRAMES
B. Hollow-Metal Doors and Frames: NAAMM-HMMA 860.
1. Physical Performance: Level A according to SDI A250.4.
2. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches
c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch, with minimum G60 coating.
d. Edge Construction: Continuously welded with no visible seam.
e. Core: Steel stiffened.
1) Thermal-Rated Doors: Provide doors fabricated with thermal-resistance value (R-value) of not less than R-19 when tested according to
ASTM C 1363.
3. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch, with minimum G60 coating.
b. Construction: Full profile welded.
1) Thermal-Rated Frames: Provide frames with thermal-resistance value (R-value) of not less than R-19.
4. Exposed Finish: Prime.
2.5 HOLLOW-METAL PANELS
A. Provide hollow-metal panels of same materials, construction, and finish as adjacent door assemblies.
2.6 FRAME ANCHORS
A. Jamb Anchors:
1. Masonry Type: Adjustable strap-and-stirrup or T-shaped anchors to suit frame size, not less than 0.042 inch thick, with corrugated or perforated straps not less than 2 inches wide by 10 inches long; or wire anchors not less than 0.177 inch thick.
2. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than 0.042 inch thick.
3. Compression Type for Drywall Slip-on Frames: Adjustable compression anchors.
4. Postinstalled Expansion Type for In-Place Concrete or Masonry: Minimum 3/8-inch-diameter bolts with expansion shields or inserts. Provide pipe spacer from frame to wall, with throat reinforcement plate, welded to frame at each anchor location.
B. Floor Anchors: Formed from same material as frames, minimum thickness of 0.042 inch, and as follows:
08 11 13 - 5
HOLLOW METAL DOORS AND FRAMES
1. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive fasteners.
2. Separate Topping Concrete Slabs: Adjustable-type anchors with extension clips, allowing not less than 2-inch height adjustment. Terminate bottom of frames at finish floor surface.
2.7 MATERIALS
A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B; suitable for exposed applications.
B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled.
C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B.
D. Frame Anchors: ASTM A 879/A 879M, Commercial Steel (CS), 04Z coating designation; mill phosphatized.
1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M, Class B.
E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.
F. Power-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow-metal frames of type indicated.
G. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers manufactured from slag or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics.
H. Glazing: Comply with requirements in Section 088000 "Glazing."
2.8 FABRICATION
A. Fabricate hollow-metal work to be rigid and free of defects, warp, or buckle. Accurately form metal to required sizes and profiles, with minimum radius for metal thickness. Where practical, fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly identify work that cannot be permanently factory assembled before shipment.
B. Hollow-Metal Doors:
1. Steel-Stiffened Door Cores: Provide minimum thickness 0.026 inch, steel vertical stiffeners of same material as face sheets extending full-door height, with vertical webs spaced not more than 6 inches apart. Spot weld to face sheets no more than 5 inches o.c.
Fill spaces between stiffeners with glass- or mineral-fiber insulation.
2. Fire Door Cores: As required to provide fire-protection ratings indicated.
08 11 13 - 6
HOLLOW METAL DOORS AND FRAMES
3. Vertical Edges for Single-Acting Doors: Provide beveled or square edges at manufacturer's discretion.
4. Top Edge Closures: Close top edges of doors with flush closures of same material as face sheets.
5. Bottom Edge Closures: Close bottom edges of doors where required for attachment of weather stripping with end closures or channels of same material as face sheets.
6. Exterior Doors: Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape. Seal joints in top edges of doors against water penetration.
7. Astragals: Provide overlapping astragal on one leaf of pairs of doors where required by NFPA 80 for fire-performance rating or where indicated. Extend minimum 3/4 inch beyond edge of door on which astragal is mounted or as required to comply with published listing of qualified testing agency.
C. Hollow-Metal Frames: Where frames are fabricated in sections due to shipping or handling limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal as frames.
1. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners unless otherwise indicated.
2. Grout Guards: Weld guards to frame at back of hardware mortises in frames to be grouted.
3. Floor Anchors: Weld anchors to bottoms of jambs with at least four spot welds per anchor; however, for slip-on drywall frames, provide anchor clips or countersunk holes at bottoms of jambs.
4. Jamb Anchors: Provide number and spacing of anchors as follows:
a. Masonry Type: Locate anchors not more than 16 inches from top and bottom of frame. Space anchors not more than 32 inches o.c., to match coursing, and as follows:
1) Two anchors per jamb up to 60 inches high.
2) Three anchors per jamb from 60 to 90 inches high.
3) Four anchors per jamb from 90 to 120 inches high.
4) Four anchors per jamb plus one additional anchor per jamb for each 24 inches or fraction thereof above 120 inches high.
b. Stud-Wall Type: Locate anchors not more than 18 inches from top and bottom of frame. Space anchors not more than 32 inches o.c. and as follows:
1) Three anchors per jamb up to 60 inches high.
2) Four anchors per jamb from 60 to 90 inches high.
3) Five anchors per jamb from 90 to 96 inches high.
4) Five anchors per jamb plus one additional anchor per jamb for each 24 inches or fraction thereof above 96 inches high.
c. Compression Type: Not less than two anchors in each frame.
d. Postinstalled Expansion Type: Locate anchors not more than 6 inches from top and bottom of frame. Space anchors not more than 26 inches o.c.
5. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers as follows. Keep holes clear during construction.
08 11 13 - 7
HOLLOW METAL DOORS AND FRAMES
a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers.
b. Double-Door Frames: Drill stop in head jamb to receive two door silencers.
D. Fabricate concealed stiffeners and edge channels from either cold- or hot-rolled steel sheet.
E. Hardware Preparation: Factory prepare hollow-metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to SDI A250.6, the Door Hardware Schedule, and templates.
1. Reinforce doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.
2. Comply with applicable requirements in SDI A250.6 and BHMA A156.115 for preparation of hollow-metal work for hardware.
F. Stops and Moldings: Provide stops and moldings around glazed lites and louvers where indicated. Form corners of stops and moldings with butted or mitered hairline joints.
1. Single Glazed Lites: Provide fixed stops and moldings welded on secure side of hollow-metal work.
2. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that each glazed lite is capable of being removed independently.
3. Provide fixed frame moldings on outside of exterior and on secure side of interior doors and frames.
4. Provide loose stops and moldings on inside of hollow-metal work.
5. Coordinate rabbet width between fixed and removable stops with glazing and installation types indicated.
2.9 STEEL FINISHES
A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.
1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with SDI A250.10; recommended by primer manufacturer for substrate;
compatible with substrate and field-applied coatings despite prolonged exposure.
2.10 ACCESSORIES
A. Mullions and Transom Bars: Join to adjacent members by welding or rigid mechanical anchors.
B. Grout Guards: Formed from same material as frames, not less than 0.016 inch thick.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
08 11 13 - 8
HOLLOW METAL DOORS AND FRAMES
B. Examine roughing-in for embedded and built-in anchors to verify actual locations before frame installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces.
B. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.
3.3 INSTALLATION
A. General: Install hollow-metal work plumb, rigid, properly aligned, and securely fastened in place. Comply with Drawings and manufacturer's written instructions.
B. Hollow-Metal Frames: Install hollow-metal frames for doors, transoms, sidelites, borrowed lites, and other openings, of size and profile indicated. Comply with SDI A250.11 or NAAMM- HMMA 840 as required by standards specified.
1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.
a. At fire-rated openings, install frames according to NFPA 80.
b. Where frames are fabricated in sections because of shipping or handling limitations, field splice at approved locations by welding face joint continuously;
grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces.
c. Install frames with removable stops located on secure side of opening.
d. Remove temporary braces necessary for installation only after frames have been properly set and secured.
e. Check plumb, square, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances.
2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor, and secure with postinstalled expansion anchors.
a. Floor anchors may be set with power-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings.
3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation inside frames.
4. Masonry Walls: Coordinate installation of frames to allow for solidly filling space between frames and masonry with grout.
5. Concrete Walls: Solidly fill space between frames and concrete with mineral-fiber insulation.
08 11 13 - 9
HOLLOW METAL DOORS AND FRAMES
6. In-Place Concrete or Masonry Construction: Secure frames in place with postinstalled expansion anchors. Countersink anchors, and fill and make smooth, flush, and invisible on exposed faces.
7. In-Place Metal or Wood-Stud Partitions: Secure slip-on drywall frames in place according to manufacturer's written instructions.
8. Installation Tolerances: Adjust hollow-metal door frames for squareness, alignment, twist, and plumb to the following tolerances:
a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.
c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor.
C. Hollow-Metal Doors: Fit hollow-metal doors accurately in frames, within clearances specified below. Shim as necessary.
1. Non-Fire-Rated Steel Doors:
a. Between Door and Frame Jambs and Head: 1/8 inch plus or minus 1/16 inch.
b. Between Edges of Pairs of Doors: 1/8 inch to 1/4 inch plus or minus 1/16 inch
c. At Bottom of Door: 3/4 inch plus or minus 1/32 inch.
d. Between Door Face and Stop: 1/16 inch to 1/8 inch plus or minus 1/32 inch.
2. Fire-Rated Doors: Install doors with clearances according to NFPA 80.
3. Smoke-Control Doors: Install doors and gaskets according to NFPA 105.
D. Glazing: Comply with installation requirements in Section 088000 "Glazing" and with hollow-metal manufacturer's written instructions.
1. Secure stops with countersunk flat- or oval-head machine screws spaced uniformly not more than 9 inches o.c. and not more than 2 inches o.c. from each corner.
3.4 INSPECTION
A. Inspect finished installation to establish compliance with ABAAS and DSC requirements. Use DSC – CQC Accessibility Inspection Report as basis for recordation. Record observations with confirmation of compliant and noncompliant work. Record observations and supplement with sketches, descriptive data and notes, drawings, measurements, digital images, etc. coordinate inspections with construction schedule and commence inspection immediately after work is finished. Submit report to CO for review and approval. Submit report no more than one day (24 hours) after performing inspection.
08 11 13 - 10
HOLLOW METAL DOORS AND FRAMES
3.5 ADJUSTING AND CLEANING
A. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including hollow-metal work that is warped, bowed, or otherwise unacceptable.
B. Remove grout and other bonding material from hollow-metal work immediately after installation.
C. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.
D. Metallic-Coated Surface Touchup: Clean abraded areas and repair with galvanizing repair paint according to manufacturer's written instructions.
END OF SECTION 08 11 13
GRTE – 149677 – WWTP 083100 - 1
022215 FLOOR ACCESS DOORS
462175
SECTION 08 31 00 FLOOR ACCESS DOORS
PART 1 - GENERAL
1.1 SUMMARY
A. Work Included: Provide factory-fabricated floor access doors.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast In Place Concrete
B. Section 03 41 00 – Precast Structural Conrete
1.3 SUBMITTALS
A. Product Data: Submit manufacturer’s product.
B. Shop Drawings: Submit shop drawings including profiles, accessories, location, adjacent construction interface, and dimensions.
C. Warranty: Submit executed copy of manufacturer’s standard warranty.
1.4 QUALITY ASSURANCE
A. Manufacturer: A minimum of 5 years experience manufacturing similar products.
B. Installer: A minimum of 2 years experience installing similar products.
1.5 DELIVERY, STORAGE AND HANDLING
A. Deliver products in manufacturer’s original packaging. Store materials in a dry, protected, well-vented area. Inspect product upon receipt and report damaged material immediately to delivering carrier and note such damage on the carrier’s freight bill of lading.
1.6 WARRANTY
A. Manufacturer’s Warranty: Provide manufacturer’s standard warranty. Materials shall be free of defects in material and workmanship for a period of five years from the date of purchase.
Should a part fail to function in normal use within this period, manufacturer shall furnish a new part at no charge.
PART 2 - PRODUCTS
2.1 MANUFACTURER
A. Bilco Company, B. Halliday Products, Series S1S
C. Substitutions: Section 01 67 00 - Product Requirements.
GRTE – 149677 – WWTP 083100 - 2
2.2 ACCESS DOOR
A. Furnish and install where indicated on plans floor access doors, size and location as shown on the drawings. The floor access door shall be single leaf and pre-assembled from the manufacturer. The floor access door shall be flush with the finished concrete surface.
B. Performance characteristics:
1. Cover(s): Shall be reinforced to support a minimum live load of 300 psf with a maximum deflection of 1/150th of the span.
2. Operation of the cover shall be smooth and easy with controlled operation throughout the entire arc of opening and closing.
3. Operation of the cover shall not be affected by temperature.
C. Cover: Shall be 1/4” aluminum diamond pattern reinforced to withstand specified live load.
Covers shall open to 90 degrees and automatically lock. Cover shall close flush with the frame and res on a build-in neoprene cushion/gasket.
D. Frame: Angle frame shall be 1/4” aluminum with full anchor flange around the perimeter.
Bituminous coating shall be applied to the frame exterior where it will be in contact with concrete.
E. Hinges: Shall be Type 316 stainless steel specifically designed for horizontal installation and shall be through bolted to the cover with tamperproof…