About this file

Pre-Proposal Presentation_05.17.2016

View the file

Other files for this federal contract opportunity

Other files attached to GRTE 149677 Moose Waste Water/Water Plant, newest first.
File Type Posted
07_13_26_FL_-_SELF-ADHERING_SHEET_WATERPROOFING_WATER.PDF PDF
07_16_16_-_CRYSTALLINE_WATERPROOFING_WWTP.PDF PDF
Amendment_0007_P16PS01023.pdf PDF
07_13_26_-_SELF-ADHERING_SHEET_WATERPROOFING_WWTP.PDF PDF
Amendment_0006_to_P16PS01023.pdf PDF
07_53_16_-_Chlorosulfonate-Polyethylene_(cspe)_Roofing.pdf PDF
Amendment_0005_to_P16PS01023.pdf PDF
Final_Amendment_0004_to_P16PS01023.pdf PDF
Q_and_A_Amend_004.pdf PDF
Amendment_003_Q_and_A.pdf PDF
Amendment_0003_to_P16PS01023_GRTE_149677.pdf PDF
Section_31_23_18_-_Rock_Excavation_GRTE_149677_WATER.pdf PDF
Amendment_0003_Contract_Price_Schedule.pdf PDF
Amendment_0003_Wage_Rates_Buildings.pdf PDF
Section_01_27_00_-_Contract_Line_Items_GRTE_149677_WATER.pdf PDF
Taggart_Supply_and_Storage_1982.pdf PDF
Ground_Protection_Mats_b.JPG JPG image
Amendment_0002_to_P16PS01023_GRTE_149677.pdf PDF
Moose_Lift_Station_partial_set.pdf PDF
Transmission_ _Windy_Point_Tank_1956.pdf PDF
Moose-Kelly_Pit_map.pdf PDF
Q_and_A_Amendment_002.pdf PDF
Moose_WWTP_partial_set.pdf PDF
Ground_Protection_Mats_a.JPG JPG image
Pre-Bid_Attendance_List_05.17.2016.pdf PDF
Amendment_0001_Q_and_A_spreadsheet.pdf PDF
Amendment_0001_to_P16PS01023_GRTE_149677.pdf PDF
Amendment_0001_Vol_I_Submission_Package_P16PS01023.pdf PDF
Amendment_0001_Spec_01_27_00_Volume_I_WWTP.pdf PDF
MooseWater_DrawingSetv3.pdf PDF
USACE_022916_NP12_Authorization_Original.PDF PDF
Moose_Water_System_Specs_Volume_I.pdf PDF
Attachment_3_Wage_Rates.pdf PDF
MooseWater_DrawingSetv2.pdf PDF
Vol_I_Submission_Package_P16PS01023.pdf PDF
Moose_Waste_Water_-_Volume_III_Specs.pdf PDF
Moose_WWTP_Permit_to_Const._No_15-585.pdf PDF
Moose_WWTP_Drawing_setv3.pdf PDF
Permit_to_Construct_Moose_Water.pdf PDF
Moose_Water_System_Specs_Volume_II.pdf PDF
Vol_II_Submission_Package_P16PS01023.pdf PDF
GRTE_149677_Moose_WWTP_Wetlands_Report_09-29-14.pdf PDF
MooseWater_DrawingSetv1.pdf PDF
Final_Solicitation_P16PS01023_GRTE_149677.pdf PDF
GRTE_149677_Moose_Water_Wetlands_Report.pdf PDF
Moose_WWTP_Drawing_setv2.pdf PDF
Attachment_5_Contractor_Tour_Request_Form.pdf PDF
Moose_Waste_Water_-_Volume_I_Specs.pdf PDF
Moose_WWTP_Drawing_setv1.pdf PDF
Moose_Waste_Water_-_Volume_II_Specs.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E X P E R I E N C E Y O U R A M E R I C A

Replace Moose Wastewater System & Address Critical Water

System Deficiencies

GRTE 149677

Sarah Clemmens, Monica Norval, Mark Baker, Phil Fessler

May 17, 2016

National Park Service U.S. Department of the Interior Development Advisory Board Grand Teton National Park

Pre-Proposal Site Visit

Contracting Services

Solicitation P16PS01023 posted on FBO.GOV Estimated Value $9-$13M; POP 540 days from NTP Proposals Due: June 6, 2016 at 10am Mountain

Daylight Time (MDT), unless amended.

Question deadline: May 30, 2016 at 4:00pm MDT.

Active SAM registration required Section L – Instructions to Offerors Section M – Evaluation Criteria Small Business Participation Plan – 20% mandatory requirement

Infrastructure Locations: Water

Moose: Park HQ

Windy Pt. Tank Wells

Taggart Tank

Existing Infrastructure •2 wells

• 1 pumphouse

• water line

• 150,000 gallon storage at 2 tank locations

Existing waterline alignment

Infrastructure Wastewater:

Proposed New Treatment Plant

Existing Treatment Plant

Water System

Contract Scope:

• Demolish Taggart and Windy Creek Tanks, build new 300,000 gallons underground reinforced concrete tank at Taggart

• Increases well capacity, replace existing well house

• Install approximately 17,100 LF of 12” dia HDPE Moose transmission pipeline

• Bid Options to install approximately 5,600 LF of 8” HDPE

4-Lazy F distribution pipeline, meter vault at Beaver Creek and fiber optic conduit

Wastewater System

Contract Scope:

• Construct new Membrane bioreactor system WWTP at new location

• Bid Option to deconstruct old plant, restore site.

Location, Location, Location

• Existing WWTP located close to Snake River and in a high visitor use area

Existing WWTP

Sage Grouse Habitat – Prohibit all habitat removal between March 15 and June 30. Do not remove any habitat within 4 miles of any sage grouse leks between March 15 and June 30. Mitigation is to mow pipeline alignment in the fall prior to installing pipeline to discourage nesting.

Copies of the FONSI Mitigation Measures are included within the specifications between sections 01 11 00 & 01 12 00.

Environmental Issues

National Park Service U.S. Department of the Interior

File details come from the government source that posted it. Updated .