GRTE – WASTEWATER TREATMENT
MOOSE, WY 9/4/2015
01 00 00 - 1
SPECIFICATIONS TABLE OF CONTENTS
SPECIFICATIONS
VOLUME 3
| GRTE | 149677 | |
| MOOSE | WASTEWATER | SYSTEM |
IMPROVEMENTS
(ADDRESS CRITICAL MOOSE WASTEWATER SYSTEM DEFICIENCIES)
01 00 00 - 2
TABLE OF CONTENTS
VOLUME 1
DIVISION 01 ‐ GENERAL REQUIREMENTS
| 01 | 10 | 00 | CONTRACT | MODIFICATION | PROCEDURES | ............................................................................... | |
| 01 | 11 | 00 | SUMMARY | OF | WORK | ................................................................................................................ |
| a. GEOTECHNICAL | INVESTIGATION | ................................................................................ | |
| b. FONSI | MITIGATION | ............................................................................................................ | |
| c. HAZARDOUS | MATERIAL | TESTING | .............................................................................. |
| 01 | 12 | 00 | NATURAL | FEATURES | PROTECTION | ............................................................................................ | ||
| 01 | 27 | 00 | DEFINITION | OF | CONTRACT | LINE | ITEMS | ........................................................................... |
| 01 | 31 | 00 | PROJECT | MANAGEMENT | & | COORDINATION | .................................................................... | |
| 01 | 32 | 16 | CONSTRUCTION | SCHEDULE | ........................................................................................................... | |||
| 01 | 32 | 33 | PHOTOGRAPHIC | AND | VIDEO | DOCUMENTATION | ........................................................... | |
| 01 | 33 | 23 | SUBMITTAL | PROCEDURES | ............................................................................................................. |
| a. LIST | OF | MATERIAL | SUBMITTALS | ................................................................................ | |
| 01 | 35 | 23 | SAFETY | REQUIREMENTS | ................................................................................................................ |
| 01 | 40 | 00 | QUALITY | REQUIREMENTS | .............................................................................................................. |
| STATEMENT | OF | STRUCTURAL | TESTS | & | SPECIAL | INSPECTIONS | .......................... | |
| 01 | 42 | 00 | REFERENCES.......................................................................................................................... | .... | ||||
| 01 | 50 | 00 | TEMPORARY | FACILITIES | AND | CONTROLS................................................................ | ....... | |
| 01 | 55 | 26 | TRAFFIC | CONTROL | ........................................................................................................................... | |||
| 01 | 57 | 19.11 | INDOOR | AIR | QUALITY | MANAGEMENT | ............................................................................... | |
| 01 | 57 | 19.12 | NOISE | & | ACOUSTICS | MANAGEMENT | ................................................................................... | |
| 01 | 57 | 23 | TEMPORARY | STORM | WATER | POLLUTION | PREVENTION | ........................................... |
| a. SWPPP | – | NOTICE | OF | TRANSFER | AND | ACCEPTANCE | .......................................... | |
| 01 | 67 | 00 | PRODUCT | REQUIREMENTS | ............................................................................................................ | |||
| 01 | 73 | 40 | EXECUTION | .................................................................................................................................. | ||||
| 01 | 74 | 19 | CONSTRUCTION | WASTE | MANAGEMENT | AND | DISPOSAL | ............................................ |
| PROJECT | WASTE | MANAGEMENT | PLAN | WORKSHEET | ............................................... |
| STANDARD | SOLID | WASTE | CONVERSIONS | ..................................................................... |
| 01 | 77 | 00 | CLOSEOUT | PROCEDURES | ................................................................................................................ | |||||||||||
| 01 | 78 | 23 | OPERATION | AND | MAINTENANCE | DATA | ............................................................................ | |||||||||
| 01 | 79 | 00 | DEMONSTRATION | AND | TRAINING | .............................................................................................. | ||||||||||
| 01 | 81 | 13 | SUSTAINABLE | DESIGN | REQUIREMENTS | FOR | NON‐LEED | PROJECTS | ........................ | |||||||
| 01 | 91 | 14 | COMMISSIONING | ........................................................................................................................ | ||||||||||||
| 01 | 92 | 00 | CLOSEOUT | AND | OPERATION | & | MAINTENANCE | REQUIREMENTS | ............................... |
DIVISION 02 – EXISTING CONDITIONS
02 41 16 STRUCTURE DEMOLITION
DIVISION 03 – CONCRETE
| 03 | 30 | 00 | CAST‐IN‐PLACE | CONCRETE | ............................................................................................................ | |
| 03 | 37 | 00 | CONCRETE | CURING | .................................................................................................................... | |
| 03 | 41 | 00 | PRECAST | STRUCTURAL | CONCRETE | ..................................................................................... |
| 03 | 60 | 00 | GROUTING | .................................................................................................................................... |
01 00 00 - 3
DIVISION 04 – MASONRY
04 22 00 CONCRETE UNIT MASONRY
DIVISION 05 – METALS
| 05 | 12 | 00 | STRUCTURAL | STEEL | FRAMING | ............................................................................................. | ||
| 05 | 21 | 00 | STEEL | JOIST | FRAMING | ............................................................................................................. | ||
| 05 | 31 | 00 | STEEL | DECKING | .......................................................................................................................... | |||
| 05 | 40 | 00 | COLD | FORMED | METAL | FRAMING | ......................................................................................... | |
| 05 | 50 | 00 | METAL | FABRICATIONS | ............................................................................................................ | |||
| 05 | 50 | 10 | ANCHOR | BOLTS | AND | EXPANSION | ANCHORS | ................................................................... |
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
| 06 | 10 | 00 | ROUGH | CARPENTRY. | ................................................................................................................ | |
| 06 | 16 | 00 | SHEATHING | ................................................................................................................................. | ||
| 06 | 64 | 00 | PLASTIC | PANELING | ................................................................................................................... | |
| 06 | 82 | 00 | GLASS‐FIBER‐REINFORCED | PLASTIC | FABRICATIONS | .................................................. |
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
| 07 | 11 | 13 | BITUMINOUS | DAMPROOFING | ............................................................................................... | |||
| 07 | 13 | 26 | SELF‐ADHERING | SHEET | WATERPROOFING | ..................................................................... | ||
| 07 | 16 | 16 | CRYSTALLINE | WATERPROOFING | ........................................................................................ | |||
| 07 | 21 | 00 | THERMAL | INSULATION | ........................................................................................................... | |||
| 07 | 25 | 00 | WEATHER | BARRIERS | ............................................................................................................... | |||
| 07 | 26 | 00 | VAPOR | RETARDERS | .................................................................................................................. | |||
| 07 | 41 | 13.16 | STANDING‐SEAM | METAL | ROOF | PANELS | ........................................................................... | |
| 07 | 46 | 19 | STEEL | SIDING | .............................................................................................................................. | |||
| 07 | 62 | 00 | SHEET | METAL | FLASHING | AND | TRIM | .................................................................................. |
| 07 | 72 | 53 | SNOW | GUARDS | ........................................................................................................................... | |||
| 07 | 84 | 43 | JOINT | FIRESTOPPING | ............................................................................................................... | |||
| 07 | 92 | 00 | JOINT | SEALANTS | ........................................................................................................................ |
VOLUME 2
DIVISION 08 – OPENINGS
| 08 | 11 | 13 | HOLLOW | METAL | DOORS | AND | FRAMES | ............................................................................. |
| 08 | 31 | 00 | FLOOR | ACCESS | DOOR | ............................................................................................................... | ||
| 08 | 33 | 23 | OVERHEAD | COILING | DOORS | .................................................................................................. | ||
| 08 | 51 | 13 | ALUMINUM | WINDOWS | ............................................................................................................ | |||
| 08 | 71 | 00 | DOOR | HARDWARE | .................................................................................................................... | |||
| 08 | 80 | 00 | GLAZING | ........................................................................................................................................ | ||||
| 08 | 91 | 19 | FIXED | LOUVERS | ......................................................................................................................... |
01 00 00 - 4
DIVISION 09 – FINISHES
| 09 | 22 | 16 | NON‐STRUCTURAL | METAL | FRAMING | ................................................................................ | |
| 09 | 29 | 00 | GYPSUM | BOARD | ......................................................................................................................... | ||
| 09 | 30 | 00 | TILING | ........................................................................................................................................... | |||
| 09 | 65 | 13 | RESILIENT | BASE | AND | ACCESSORIES | ................................................................................... |
| 09 | 65 | 19 | RESILIENT | TILE | FLOORING | .................................................................................................... | |
| 09 | 72 | 00 | WALL | COVERINGS | ..................................................................................................................... | ||
| 09 | 91 | 13 | EXTERIOR | PAINTING | ................................................................................................................ | ||
| 09 | 91 | 23 | INTERIOR | PAINTING | ................................................................................................................ | ||
| 09 | 96 | 00 | HIGH‐PERFORMANCE | COATINGS | ......................................................................................... |
DIVISION 10 – SPECIALTIES
| 10 | 14 | 23 | PANEL | SIGNAGE | ......................................................................................................................... | |||
| 10 | 26 | 00 | WALL | AND | DOOR | PROTECTION | ........................................................................................... | |
| 10 | 28 | 00 | TOILET, | BATH, | AND | LAUNDRY | ACCESSORIES | ................................................................. |
DIVISION 11 – EQUIPMENT
11 31 00 RESIDENTIAL APPLIANCES
DIVISION 12 – FURNISHINGS
| 12 | 21 | 13 | HORIZONTAL | LOUVER | BLINDS | ............................................................................................. |
| 12 | 35 | 53.16 | PLASTIC‐LAMINATE‐CLAD | LABORATORY | CASEWORK | ................................................ |
DIVISION 13 – SPECIAL CONSTRUCTION
(NOT USED)
DIVISION 14 – CONVEYING EQUIPMENT
(NOT USED)
DIVISION 21 – FIRE SUPPRESSION
(NOT USED)
DIVISION 22 – PLUMBING
| 22 | 05 | 17 | SLEEVES | AND | SLEEVE | SEALS | FOR | PLUMBING | PIPING | .................................................. | |
| 22 | 05 | 18 | ESCUTCHEONS | FOR | PLUMBING | PIPIN | ................................................................................ | ||||
| 22 | 05 | 23 | GENERAL‐DUTY | VALVES | FOR | PLUMBING | PIPING | .......................................................... | |||
| 22 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | PLUMBING | PIPING | AND | EQUIPMENT | ................... |
| 22 | 07 | 19 | PLUMBING | PIPING | INSULATION | .......................................................................................... | |||||
| 22 | 11 | 16 | DOMESTIC | WATER | PIPING | ..................................................................................................... | |||||
| 22 | 11 | 19 | DOMESTIC | WATER | PIPING | SPECIALTIES | .......................................................................... | ||||
| 22 | 13 | 16 | SANITARY | WASTE | AND | VENT | PIPING | ................................................................................ |
01 00 00 - 5
| 22 | 13 | 19 | SANITARY | WASTE | PIPING | SPECIALTIES | ........................................................................... |
| 22 | 33 | 00 | ELECTRIC, | DOMESTIC‐WATER | HEATERS | .......................................................................... | |
| 22 | 42 | 13.13 | COMMERCIAL | WATER | CLOSETS | ........................................................................................... | |
| 22 | 42 | 16.13 | COMMERCIAL | LAVATORIES | ................................................................................................... | ||
| 22 | 42 | 16.16 | COMMERCIAL | SINKS | ................................................................................................................. | ||
| 22 | 42 | 23 | SHOWER | FAUCETS | .................................................................................................................... | ||
| 22 | 45 | 00 | EMERGENCY | PLUMBING | FIXTURES | ..................................................................................... |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
| 23 | 05 | 13 | COMMON | MOTOR | REQUIREMENTS | FOR | HVAC | EQUIPMENT...................................... | |
| 23 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | HVAC | ........................................................... |
| 23 | 05 | 53 | IDENTIFICATION | FOR | HVAC | PIPING | AND | EQUIPMENT | ............................................... |
| 23 | 05 | 93 | TESTING, | ADJUSTING, | AND | BALANCING | HVAC | ............................................................... | |
| 23 | 07 | 13 | DUCT | INSULATION | .................................................................................................................... | ||||
| 23 | 09 | 23.12 | CONTROL | DAMPERS | ................................................................................................................. | ||||
| 23 | 31 | 13 | METAL | DUCTS | ............................................................................................................................. | ||||
| 23 | 31 | 19 | HVAC | CASINGS | ............................................................................................................................ | ||||
| 23 | 33 | 00 | AIR | DUCT | ACCESSORIES | .......................................................................................................... | |||
| 23 | 34 | 16 | CENTRIFUGAL | HVAC | FANS | ..................................................................................................... | |||
| 23 | 34 | 23 | HVAC | POWER | VENTILATORS | ................................................................................................ | |||
| 23 | 37 | 13 | DIFUSERS, | REGISTERS, | AND | GRILLES | ................................................................................. | ||
| 23 | 74 | 33 | DEDICATED | OUTDOOR | AIR | UNITS | ...................................................................................... | ||
| 23 | 81 | 26 | SPLIT‐SYSTEM | AIR‐CONDITIONERS | ................................................................................... | ||||
| 23 | 82 | 16 | ELECTRIC‐RESISTANCE | AIR | COILS | ...................................................................................... | |||
| 23 | 82 | 39 | UNIT | HEATERS | ........................................................................................................................... |
DIVISION 25 – INTEGRATED AUTOMATION
| 25 | 30 | 00 | INSTRUMENTATION | AND | CONTROL | FOR | PROCESS | SYSTEMS | ................................... |
| 25 | 51 | 00 | INTEGRATED | AUTOMATION | CONTROL | OF | FACILITY | EQUIPMENT | ......................... |
DIVISION 26 – ELECTRICAL
| 26 | 00 | 00 | BASIC | ELECTRICAL | REQUIREMENTS | .................................................................................. | ||||||
| 26 | 05 | 19 | LOW | VOLTAGE | ELECTRICAL | POWER | CONDUCTORS | AND | CABLES | .......................... | ||
| 26 | 05 | 23 | CONTROL‐VOLTAGE | ELECTRICAL | POWER | CABLES | ....................................................... | |||||
| 26 | 05 | 26 | GROUNDING | AND | BONDING | FOR | ELECTRICAL | SYSTEMS | ............................................ | |||
| 26 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | ELECTRICAL | SYSTEMS | ............................................... | |||
| 26 | 05 | 33.10 | RACEWAYS | ................................................................................................................................... | ||||||||
| 26 | 05 | 33.20 | BOXES, | ENCLOSURES | AND | CABINETS | ................................................................................. | |||||
| 26 | 05 | 36 | CABLE | TRAYS | FOR | ELECTRICAL | SYSTEMS | ........................................................................ | ||||
| 26 | 05 | 43 | UNDERGROUND | DUCTS | AND | RACEWAYS | FOR | ELECTRICAL | SYSTEMS | ................... | ||
| 26 | 05 | 44 | SLEEVES | AND | SLEEVE | SEALS | FOR | ELECTRICAL | RACEWAYS | AND | CABLING | .......... |
| 26 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | ELECTRICAL | SYSTEMS | .......................... | ||
| 26 | 05 | 53 | ELECTRICAL | SYSTEMS | IDENTIFICATIONS | ........................................................................ | ||||||
| 26 | 05 | 73 | OVERCURRENT | PROTECTIVE | DEVICE | COORDINATION | STUDY | AND | ARC | FLASH |
| HAZARD | ANALYSIS | .................................................................................................................. | |||||
| 26 | 05 | 83 | EQUIPMENT | WIRING | SYSTEMS | ............................................................................................. | |
| 26 | 05 | 93 | ELECTRICAL | SYSTEMS | FIRE | STOPPING | ............................................................................. |
01 00 00 - 6
| 26 | 09 | 35 | TELEPHONE | AUTOMATIC | DIALER | SYSTEM | ...................................................................... | |
| 26 | 22 | 00 | LOW‐VOLTAGE | TRANSFORMERS | ......................................................................................... | |||
| 26 | 24 | 16 | PANELBOARDS | ........................................................................................................................... | ||||
| 26 | 24 | 17 | ROLL‐UP | GENERATOR | TERMINATION | CABINET | ............................................................ | |
| 26 | 27 | 13 | ELECTRICITY | METERING | ||||
| 26 | 27 | 26 | WIRING | DEVICES | ....................................................................................................................... | |||
| 26 | 28 | 13 | FUSES | ............................................................................................................................................. | ||||
| 26 | 28 | 16 | ENCLOSED | SWITCHES | AND | CIRCUIT | BREAKERS | ............................................................ |
| 26 | 29 | 13 | ENCLOSED | CONTROLLERS | ...................................................................................................... | |||
| 26 | 29 | 23 | VARIABLE‐FREQUENCY | MOTOR | CONTROLLERS | ............................................................ | ||
| 26 | 32 | 13 | ENGINE | GENERATORS | .............................................................................................................. | |||
| 26 | 36 | 00 | TRANSFER | SWITCHES | .............................................................................................................. | |||
| 26 | 41 | 13 | LIGHTNING | PROTECTION | ....................................................................................................... | |||
| 26 | 43 | 00 | TRANSIENT | VOLTAGE | SUPPRESSION | ................................................................................. | ||
| 26 | 51 | 00 | INTERIOR | LIGHTING | AND | EXTERIOR | LIGHTING | ............................................................ |
| 26 | 90 | 30 | PROGRAMMABLE | LOGIC | CONTROLLERS | .......................................................................... |
VOLUME 3
DIVISION 27 – COMMUNICATIONS
| 27 | 05 | 28 | PATHWAYS | FOR | COMMUNICATIONS | SYSTEMS | .............................................................. | |
| 27 | 10 | 00 | COMMUNICATIONS | AND | SECURITY | GENERAL | REQUIREMENTS | ............................... |
| 27 | 13 | 23 | FIBER | OPTIC | CABLE | DISTRIBUTION | SYSTEM………………………………………………….. |
DIVISION 28 – ELECTRONICS SAFETY AND SECURITY
| 28 | 16 | 11 | INTRUSION | DETECTION | SYSTEM | ......................................................................................... | ||
| 28 | 31 | 11 | DIGITAL, | ADDRESSABLE | FIRE | ALARM | SYSTEM | .............................................................. |
DIVISION 31 – EARTHWORK
| 31 | 05 | 13 | SOILS | FOR | EARTHWORK......................................................................................................... | |
| 31 | 05 | 16 | AGGREGATES | FOR | EARTHWORK | ......................................................................................... |
| 31 | 10 | 00 | SITE | CLEARING | ........................................................................................................................... | |
| 31 | 23 | 16 | EXCAVATION | ............................................................................................................................... | ||
| 31 | 23 | 17 | TRENCHING | ................................................................................................................................. | ||
| 31 | 23 | 18 | ROCK | REMOVAL | ......................................................................................................................... | |
| 31 | 23 | 19 | DEWATERING | ............................................................................................................................. | ||
| 31 | 23 | 23 | FILL | ................................................................................................................................................. | ||
| 31 | 23 | 24 | FLOWABLE | FILL | ......................................................................................................................... |
DIVISION 32 – EXTERIOR IMPROVEMENTS
| 32 | 12 | 16 | ASPHALT | PAVING | ...................................................................................................................... | |||
| 32 | 15 | 43 | STABILIZED | AGGREGATE | PATHWAYS | ............................................................................... | ||
| 32 | 16 | 13 | CONCRETE | CURBS, | GUTTER | AND | SIDEWALKS | ................................................................ |
| 32 | 17 | 23 | PAVEMENT | MARKINGS | ............................................................................................................ |
01 00 00 - 7
32 91 19.13 TOPSOIL PLACEMENT AND GRADING
DIVISION 33 – UTILITIES
| 33 | 05 | 13 | MANHOLES | AND | STRUCTURES | ............................................................................................. | ||
| 33 | 12 | 13 | WATER | SERVICE | CONNECTIONS | .......................................................................................... | ||
| 33 | 13 | 00 | DISINFECTING | OF | WATER | UTILITY | DISTRIBUTION | ..................................................... |
| 33 | 31 | 00 | SANITARY | UTILITY | SEWERAGE | PIPING | ............................................................................ | |
| 33 | 32 | 16 | PACKAGED | UTILITY | WASTEWATER | PUMPING | STATION | ........................................... |
| 33 | 34 | 00 | SANITARY | UTILITY | SEWERAGE | FORCE | MAINS | ............................................................... |
DIVISION 34 – TRANSPORTATION
(NOT USED)
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
(NOT USED)
DIVISION 40 – PROCESS INTEGRATION
| 40 | 05 | 13 | COMMON | WORK | RESULTS | FOR | PROCESS | PIPING | .......................................................... | ||
| 40 | 05 | 13.13 | STEEL | PROCESS | PIPING | ........................................................................................................... | |||||
| 40 | 05 | 13.19 | STAINLESS | STEEL | PROCESS | PIPING | .................................................................................... | ||||
| 40 | 05 | 13.53 | DUCTILE, | MALLEABLE, | AND | CAST | IRON | ALLOYS | PROCESS | PIPING | ......................... |
| 40 | 05 | 13.73 | PLASTIC | PROCESS | PIPING | ...................................................................................................... | |||||
| 40 | 05 | 23 | COMMON | WORK | RESULTS | FOR | PROCESS | VALVES | ......................................................... | ||
| 40 | 05 | 23.12 | BALL | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.15 | GATE | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.18 | BUTTERFLY | VALVES | ................................................................................................................. | ||||||
| 40 | 05 | 23.21 | PLUG | VALVES | .............................................................................................................................. | ||||||
| 40 | 05 | 23.24 | CHECK | VALVES | ........................................................................................................................... | ||||||
| 40 | 05 | 23.72 | MISCELLANEOUS | PROCESS | VALVES | ..................................................................................... | |||||
| 40 | 05 | 29 | HANGERS | AND | SUPPORTS | FOR | PROCESS | PIPING | AND | EQUIPMENT | ....................... |
| 40 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | PROCESS | PIPING | ..................................... | |
| 40 | 05 | 53 | IDENTIFICATION | FOR | PROCESS | PIPING | ............................................................................ | ||||
| 40 | 23 | 19 | PROCESS | PLANT | WATER | PIPING | ......................................................................................... |
DIVISION 41 – MATERIALS PROCESSING AND HANDLING EQUIPMENT
41 22 23 BRIDGE CRANE SYSTEM AND HOISTS
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
(NOT USED)
| DIVISION | 43 | – | PROCESS | GAS | AND | LIQUID | HANDLING, | PURIFICATION, | AND |
| STORAGE | EQUIPMENT |
43 05 10 COMMON WORK RESULTS FOR GAS HANDLING EQUIPMENT
01 00 00 - 8
| 43 | 05 | 20 | COMMON | WORK | RESULTS | FOR | LIQUID | HANDLING | EQUIPMENT | ............................ |
| 43 | 11 | 33 | ROTARY | POSITIVE | DISPLACEMENT | BLOWERS | ............................................................... | |||
| 43 | 21 | 13 | CENTRIFUGAL | LIQUID | PUMPS | .............................................................................................. | ||||
| 43 | 21 | 36 | POSITIVE | DISPLACEMENT | LIQUID | PUMPS | ....................................................................... | |||
| 43 | 21 | 39 | SUBMERSIBLE | LIQUID | PUMPS | .............................................................................................. | ||||
| 43 | 22 | 17 | SUBMERSIBLE | LIQUID | MIXER | ............................................................................................... |
DIVISION 44 – POLLUTION CONTROL EQUIPMENT
44 10 00 BI‐POLAR IONIZATION ODOR CONTROL SYSTEM
DIVISION 45 – INDUSTRY – SPECIFIC MANUFACTURING EQUIPMENT
(NOT USED)
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
| 46 | 05 | 13 | COMMON | MOTOR | REQUIREMENTS | FOR | WATER | AND | WASTEWATER | |
| EQUIPMENT | ................................................................................................................................. | |||||||||
| 46 | 05 | 48 | VIBRATION | AND | SEISMIC | CONTROLS | FOR | WATER | AND | WASTEWATER |
| EQUIPMENT | ................................................................................................................................ | |||||||||||||||||
| 46 | 05 | 53 | IDENTIFICATION | FOR | WATER | AND | WASTEWATER | EQUIPMENT | ............................ | |||||||||
| 46 | 05 | 90 | MISCELLANEOUS | WATER | AND | WASTEWATER | EQUIPMENT | ..................................... | ||||||||||
| 46 | 21 | 75 | PERFORATED | PLATE | MECHANICAL | SCREEN | ................................................................... | |||||||||||
| 46 | 36 | 33 | VOLUMETRIC | FEED | EQUIPMENT | ......................................................................................... | ||||||||||||
| 46 | 51 | 21 | COARSE | BUBBLE | DIFFUSERS | ................................................................................................. | ||||||||||||
| 46 | 51 | 23 | FINE | BUBBLE | DIFFUSERS | ....................................................................................................... | ||||||||||||
| 46 53 | 49 | MEMBRANE | BIOREACTOR | v5 | ................................................................................................ | |||||||||||||
| MBR | PERFORMANCE | QUESTIONNAIRE | AND | LIFE | CYCLE | COST | ANALYSIS | FORMS |
DIVISION 48 – ELECTRICAL POWER GENERATION
(NOT USED)
GRTE – 149677 – WWTP
120115
27 05 28-1
PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 28 - PATHWAYS FOR COMMUNICATIONS SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Division 00 Procurement and Contracting Requirements and Division 01 General Requirements, apply to this Section.
1.2 SUMMARY
A. This Section includes conduit, cabinets, terminal backboards and outlets to form empty raceway systems, for installation of security system, fire alarm system, telephone, data, TV etc.
B. Service entrance wiring and premises wiring by Contracting Officer.
C. Equipment by Contracting Officer.
1.3 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having Jurisdiction.
B. Comply with NFPA 70.
1.4 COORDINATION
A. Coordinate with requirements of communications systems vendors providing services to the project and with communications systems equipment suppliers as applicable.
B. Related Sections include the following:
1. Division 26 Section “Grounding and Bonding for Electrical Systems.”
2. Division 26 Section “Hangers and Supports for Electrical Systems.”
3. Division 26 Section “Raceways.”
PART 2 - PRODUCTS
2.1 COMPONENTS
A. Cabinets: Size as indicated on the drawings, comply with Division 27 Section "Communications and Security General Requirements. Furnish cabinets with backboards.
B. Conduit: Comply with Division 26 Section “Raceways.”
C. Pull Boxes, Junction Boxes and Outlet Boxes: Comply with Division 26 Section “Boxes, Enclosures and Cabinets.”
PART 3 - EXECUTION
27 05 28-2
PATHWAYS FOR COMMUNICATIONS SYSTEMS
3.1 INSTALLATION
A. Install outlet boxes and conduit.
B. Maintain 12 inches separation between power and telephone service conduits.
C. Provide pull boxes in conduit runs as required in Division 26 Section “Boxes, Enclosures, and
Cabinets.”
D. Provide a minimum of one duplex receptacle on a dedicated circuit in each equipment room.
E. Install termination backboards plumb and attach securely at each corner.
3.2 CONNECTIONS
A. Ground equipment.
1. Install ground terminal at local exchange carrier service location and connect according to
Division 26 Section "Grounding and Bonding for Electrical Systems."
3.3 IDENTIFICATION
A. Identify components and circuits according to Division 26 Section "Electrical Systems Identification."
B. Identify communication system backboards and cabinets with the legend "Telephone", “Data”, “TV”, etc. as appropriate for the installation.
C. Identify telecommunications outlet boxes and pull-and-junction boxes with approved designations.
END OF SECTION
27 10 00 -1
COMMUNICATIONS AND SECURITY GENERAL
REQUIREMENTS
SECTION 27 10 00 - COMMUNICATIONS AND SECURITY
GENERAL REQUIREMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply to this Section.
B. Division 26 Electrical
1.2 WORK INCLUDED
A. The Telecommunications Contractor (TC) shall provide all labor, materials and equipment for the complete installation of work called for in the Contract Documents unless otherwise noted.
1.3 WARRANTY
A. The TC shall provide to the Contracting Officer a (1) one year warranty on all cable and components installed under this section including labor unless otherwise noted. The warranty shall commence from the date of acceptance by the Contracting Officer.
1.4 REFERENCES
A. Equipment and materials shall be installed in accordance with the applicable standards of the following organizations:
1. ANSI: American National Standards Institute
2. EIA/TIA: Electronics Industries Association/Telecommunications Industry Association
a) TIA/EIA 526-7: Measurement of Optical Power Loss of Installed Single- Mode Fiber Cable Plant
b) EIA/TIA 568A: Commercial Building Wiring Standard
c) EIA/TIA 568-B.1: Minimum 4-Pair Sc-TP Patch Cable Bend Radius
d) EIA/TIA 607: Commercial Building Grounding and Bonding
Requirements for Telecommunications
3. IBC: International Building Code
4. NEC: National Electrical Code, latest edition
5. NEMA: National Electrical Manufacturers Association
6. UL: Underwriters’ Laboratories
1.5 DEFINITIONS
A. EMI: Electromagnetic interference.
B. BICSI: Building Industry Consulting Service International.
C. IDC: Insulation displacement connector.
27 10 00 -2
D. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits.
E. Plenum: A space forming part of the air distribution system to which one or more air ducts are connected. An air duct is a passageway, other than a plenum, for transporting air to or from heating, ventilating, or air-conditioning equipment.
F. Open Cabling: Passing telecommunications cabling through open space (e.g., between the studs of a wall cavity).
G. RCDD: Registered Communications Distribution Designer.
H. UTP : Unshielded Twisted Pair
1.6 SUBMITTALS
A. Product data for each type of product indicated.
B. Performance Requirements:
1. General Performance: Communication cabling system shall comply with transmission standards in TIA/EIA-568-B.1, when tested according to test procedures of this standard.
2. Field quality-control reports.
3. Installer Qualifications: Cabling Installer must have personnel certified by BICSI on staff.
a) Layout Responsibility: Preparation of Shop Drawings, Cabling Administration Drawings, and field testing program development by an
RCDD.
b) Installation Supervision: Installation shall be under the direct supervision of Registered Technician, who shall be present at all times when Work of this Section is performed at Project site.
4. Testing Agency Qualifications: An NRTL.
a) Testing Agency’s Field Supervisor: Currently certified by BICSI as an RCDD to supervise on-site testing.
5. Surface-Burning Characteristics: As determined by testing identical products according to ASTM E 84 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
a) Flame-Spread Index: 25 or less.
b) Smoke-Developed Index: 450 or less.
6. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
7. Telecommunications Pathways and Spaces: Comply with TIA/EIA-569-A.
8. Grounding: Comply with ANSI-J-STD-607-A.
27 10 00 -3
1.7 QUALITY ASSURANCE
A. All communications and security cable and related components shall be installed in a neat and workmanlike manner by a contractor trained in the installation, termination and testing of Category 6 cabling systems.
B. Equipment and materials shall be of the quality and Manufacturer indicated.
C. Where "approved equal” is stated, the equipment shall be equivalent in every way to that of the equipment specified, subject to approval by the Contracting Officer.
D. Communication grounding and bonding shall be in accordance with applicable codes and regulations. The requirements of IEC 1000-5-2 and ANSI-J-STD-607-A shall be observed throughout the entire cabling system.
E. Materials and work specified herein shall comply with all applicable requirements of the following codes and standards. All codes and standards are to be construed as current, latest, as amended or as adopted:
1. ANSI/TIA/EIA – 568-B Commercial Building Telecommunications Cabling Standard,
2. ANSI/TIA/EIA – 569-B Commercial Building Standard for Telecommunications Pathways and Spaces, 2012
3. ANSI/TIA/EIA – 606-A Administration Standard for the Telecommunications Infrastructure of Commercial Buildings, 2012
4. ANSI-J-STD – 607-A Joint Standard for Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications, 2002
5. NFPA 70 – National Electric Code, 2014
6. BICSI – Telecommunications Distribution Methods Manual, 13th Edition, 2014
F. Testing Agency Qualifications: Member company of NETA or an NRTL.
1. Testing Agency's Field Supervisor: Currently certified by BICSI as an RCDD to supervise on-site testing.
1.8 FIELD CONDITIONS
A. Do not install conductors and cables that are wet, moisture damaged, or mold damaged.
1. Indications that wire and cables are wet or moisture damaged include, but are not limited to, discoloration and sagging of factory packing materials.
B. Environmental Limitations: Do not deliver or install UTP cables and connecting materials until wet work in spaces is complete and dry, and temporary HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period.
PART 2 – PRODUCTS
27 10 00 -4
2.1 UTP CABLE (CAT 5E)
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. ADC.
2. AMP Netconnect; a brand of Tyco Electronics Corporation.
3. Belden Inc.
4. Or Approved Equal.
B. Description: 100-ohm, 24 AWG, twenty five-pair, Category 5E, UTP covered with a gray thermoplastic jacket.
1. Comply with ICEA S-90-661.
2. Comply with TIA-568-C.1.
3. Comply with TIA-568-C.2.
4. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444 and NFPA 70 for the following types:
2.2 UTP CABLE (CAT 6)
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. ADC.
2. AMP Netconnect; a brand of Tyco Electronics Corporation.
3. Belden Inc.
4. Or Approved Equal.
B. Description: 100-ohm, 24 AWG, four-pair, Category 6, UTP covered with a blue thermoplastic jacket.
1. Comply with ICEA S-90-661.
2. Comply with TIA-568-C.1.
3. Comply with TIA-568-C.2.
4. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444 and NFPA 70 for the following types:
a) Communications, Plenum Rated: Type CMP complying with UL 1685 or Type CMP in listed plenum communications raceway.
b) Communications, Plenum Rated: Type CM, Type CMG, Type CMP, Type CMR, or Type CMX in metallic conduit installed per NFPA 70, Article 300.22, "Wiring in Ducts, Plenums, and Other Air- Handling Spaces."
c) Communications, Riser Rated: Type CMR complying with UL 1666 and CEA S-103-701.
d) Communications, Riser Rated: Type CMP, or Type CMR in listed plenum or riser communications raceway.
e) Communications, Riser Rated: Type CMP or Type CMR in metallic conduit installed per NFPA 70, Article 300.22, "Wiring in Ducts, Plenums, and Other Air-Handling Spaces."
27 10 00 -5
f) Communications, General Purpose: Type CM, Type CMG, Type CMP, or Type CMR in listed communications raceways.
g) Communications, General Purpose: Type CM, Type CMG, Type CMP, Type CMR, or Type CMX in metallic conduit installed per NFPA 70, Article 300.22, "Wiring in Ducts, Plenums, and Other Air-Handling Spaces."
2.3 UTP CABLE HARDWARE
A. Manufacturers: Subject to compliance with requirements, provide products by the following :
1. ADC.
2. AMP Netconnect; a brand of Tyco Electronics Corporation.
3. Belden Inc.
4. Hubbell Incorporated; Hubbell Premise Wiring.
5. Leviton Commercial Networks Division.
6. Or Approved Equal
B. General Requirements for Cable Connecting Hardware: Comply with TIA/EIA-568- C.2, IDC type, with modules designed for punch-down caps or tools. Cables shall be terminated with connecting hardware of same category or higher.
C. Connecting Blocks: 110-style IDC for Category 6. Provide blocks for the number of cables terminated on the block, plus 25 percent spare. Integral with connector bodies, including plugs and jacks where indicated.
D. Jacks and Jack Assemblies: 100-ohm, balanced, twisted-pair connector; four-pair, eight-position modular. Comply with TIA/EIA-568-C.1.
E. Patch Cords: Factory-made, four-pair cables in 36-inch lengths; terminated with eight-position modular plug at each end.
1. Patch cords shall have bend-relief-compliant boots and color-coded icons to ensure Category 6 performance. Patch cords shall have latch guards to protect against snagging.
2. Patch cords shall have color-coded boots for circuit identification.
F. Faceplates:
1. Metal Faceplate: Stainless steel, complying with requirements in
Section 262726 "Wiring Devices."
2. For use with snap-in jacks accommodating any combination of UTP, optical-fiber, and coaxial work area cords.
a) Flush-mounted jacks, positioning the cord at a 45-degree angle.
G. Legend:
1. Factory labeled by silk-screening or engraving for stainless steel faceplates.
2. Machine printed, in the field, using adhesive-tape label.
27 10 00 -6
3. Snap-in, clear-label covers and machine-printed paper inserts
2.4 COPPER PATCH PANELS AND TERMINATION BLOCKS
A. Category 6 Patch Panels
1. Patch panel design shall be designed to accept unshielded Category 6 SL Series jacks.
2. Patch panels shall be a multimedia design to allow custom jack configurations including copper, fiber, coax and A/V applications.
3. Write-on designation labels with protective clear plastic covers, or equivalent, shall be provided on both the front and rear of the patch panels for circuit identification.
4. Patch panels shall be supplied with cable management hardware facilitating proper installation and cable management techniques. Accessories supplied shall be designed to provide strain relief on cables, maintain the wire pair twists as close as possible to the termination points and support the proper bend radius of the cables.
5. Patch panels shall be modular in nature and shall be rack mountable and comply with EIA 19" rack mounting standards.
6. Provide one 48-port configuration patch panel as indicated on drawings.
7. Provide with 66 block Cat 6 50-strip punch down block.
B. Manufacturers:
a) AMP Netconnect
b) Cisco
c) Or approved equivalent
2.5 BACKBOARDS
A. Description: Plywood, fire-retardant treated, 3/4 by 48 by 96 inches (19 by 1220 by 2440 mm).
B. Backboards shall be fire rated by manufacturing process. Fire stamp shall be clearly visible.
Backboards shall be provided on a minimum of two adjacent walls in the telecommunication spaces.
C. Painting: Paint applied over fire retardant backboard shall be UL 723 fire retardant paint. Provide label including paint manufacturer, date painted, UL listing and name of Installer. When painted, paint label and fire stamp shall be clearly visible. Paint plywood on all sides and edges with flat, white latex paint.
2.6 ETHERNET SWITCHES
A. The Ethernet data shall support the transmission of four channels of 10 or 100 Mbps over unshielded twisted pair and four channels of 100Base FX via single-mode or multimode fiber.
The module shall support the Ethernet data IEEE 802.3 protocol using Auto-negotiating and Auto-MDI/MDI-X features. The module shall feature four electrical ports and four optical ports.
The module shall require no in-field electrical or optical adjustments or in-line attenuators to ease installation. The module shall provide power, link speed, simplex or duplex transmission, and fiber port status indicating LED’s for monitoring proper system operation. The modules shall
27 10 00 -7 provide automatic re-settable solid-state current limiters and independent voltage regulators on each module to reduce the chance of a single point failure of the system. The module shall be hot swappable in a rack mount system to reduce complete system shut down during maintenance or repair. The module shall have a lifetime warranty to reduce system life cycle cost in an event of a module failure.
B. Manufacturers:
a) AMP Netconnect
b) Cisco
c) Netgear
d) Or approved equivalent
C. DATA SPECIFICATIONS
1. Data Interface: Ethernet IEEE802.3
2. Data Rate: 10/100 Mbps
3. Data Inputs: 4
4. Operation Mode: Simplex or Duplex
D. OPTICAL SPECIFICATIONS
1. Optical Fiber: 50/125 µm, 62.5/125 µm, or single mode
2. Number of Fibers Required: 1 or 2, SFP dependent
3. Optical Wavelength: SFP-dependent
4. Optical Power Budget: SFP dependent
5. Maximum Distance: SFP dependent
E. STATUS INDICATORS
1. Power: On/Green – Off/Off
2. Link/Speed: 100Mbps/Green – 10 Mbps/Red -No Fiber Connection/Off
3. Simplex/Duplex: Simplex/Off, Duplex/Green.
4. Optical: LC or SC, SFP dependent
5. Power: Terminal Block with Screw Clamps.
6. Data: RJ-45
F. ELECTRICAL SPECIFICATIONS
27 10 00 -8
1. Power: 12VDC @ 800 mA
2. Current Protection: Automatic re-settable solid-state current limiters
3. Voltage Regulation: Solid-state, Independent on each board
4. Circuit Board: UL 94 flame rated and meets all IPC standards.
5. Rack mount Card: Shall be hot-swappable with ComNet Model Number C1 (EIA 19” card cage)
6. 2.09 MECHANICAL SPECIFICATIONS
7. Dimensions: 7.0” x 4.9” x 1.0” (17.80 cm x 12.5 cm x 2.5 cm)
8. Number of Rack Slots: 2
9. Weight: <2.0 lbs./0.9kg
G. ENVIRONMENTAL SPECIFICATIONS
1. MTBF: >100,000 Hours
2. Operating Temp: –40˚ C to +75˚ C
3. Storage Temp: -40˚ C to +85˚ C
4. Relative Humidity: 0% to 95% (non-condensing). If product is installed under condensation conditions, unit shall have conformal coating applied to the printed circuit board. (Add –C to model number for conformal coated printed circuit board)
PART 3 – EXECUTION
3.1 TELECOMMUNICATIONS HORIZONTAL CABLE
A. All cables shall be installed in conduit except in cable tray. Minimum conduit size shall be 3/4" inch.
B. All material and equipment shall be installed in a neat and workmanlike manner.
C. All material and equipment shall be installed per manufacturer’s specifications, using methods and tools approved by the manufacturer.
D. Installation and configuration shall conform to the requirements of the current revision levels of ANSI/ EIA/TIA Standards 568 & 569, NFPA 70 (National Electrical Code), applicable local codes, and to the manufacturer’s installation instructions.
E. Install horizontal voice and data cables from the IT Room to the telecommunications outlet.
The maximum distance from the telecommunications outlet to the horizontal cross-connect within the telecommunications rooms shall be 295 feet. All cabling shall be installed in minimum 3/4" inch conduits, except in cable trays.
27 10 00 -9
F. Install horizontal cable as a continuous run for origination to destination without splices or taps.
Provide 12”-18” cable slack at each outlet location. Follow cable manufacturer’s recommendations for managing slack at the outlet.
G. Do not bend cables, in handling or in installing, to smaller radii than minimums recommended by manufacturer.
H. Install cables without damaging conductors, shield, or jacket. Cables that are damaged or kinked must be replaced. Damaged cables will not be accepted.
I. Pull cables without exceeding cable manufacturer’s recommended pulling tensions. Use pulling means that will not damage media.
J. Label both ends of each horizontal cable with the cable number within 6” of terminations.
category 6 patch panels
K. All material and equipment shall be installed in a neat and workmanlike manner.
L. All material and equipment shall be installed per manufacturer’s specifications, using methods and tools approved by the manufacturer.
M. Install SL Series Category 6 jacks in modular patch panels. Install colors to match Contracting Officer requirements. It is recommended that AMP SL series jacks installed in patch panels be terminated using the AMP SL termination tool rather than a 110-type punch tool.
N. Terminate Category 6 horizontal cable at patch panels in strict accordance with the manufacturer’s recommendations and in compliance with TIA/EIA Category 6 standards.
O. Support cables using ladder rack or approved means from point of entry in the telecommunications room to the termination field. Cables shall be neatly dressed in the telecommunications rooms in bundles of no more than 24 cables.
P. Provide cable support bars or similar means where cables terminate on the rear of copper patch panels.
Q. Provide 10 foot slack for Category 6 horizontal cable at the telecommunications room. Use cable slings or similar means to neatly support cable slack. Do not store slack on walls, ladder rack or cable trays.
3.2 EXAMINATION
A. Test each pair of UTP cable for open and short circuits
B. UTP Cable Installation:
1. Comply with TIA-568-C.2.
2. Do not untwist UTP cables more than 1/2 inch (12 mm) at the point of termination to maintain cable geometry.
3.3 GROUNDING
27 10 00 -10
A. Ground all racks, cabinets, frames and ladder racks in accordance with J-STD-607-A using approved methods and materials.
B. Ground all racks, cabinets, frames and ladder racks to the room grounding bus bar using a minimum #6 AWG conductor.
C. Use 2-hole, long-barrel lugs where ground bonds are fastened to equipment racks, cabinets, frames, ladder racks and busbars. Lugs shall have compression type fittings and be designed for the purpose of bonding equipment to ground. Use factory made bonding conductors where possible. Use proper crimping tools and dies when field installing lugs. Mechanical lugs with screw connections are not permitted. Scrape paint or power coat from equipment racks and ladder racks to bare metal before attaching lugs.
3.4 LABELING
A. Label all cables. Label horizontal cables using Contracting Officer approved labeling scheme.
Label horizontal cables at the outlet and patch panel within 12” of termination. Label backbone cables to show origination and destination. Affix labels in a visible location. All labels must be machine made and permanently attached.
B. Label all data and voice patch panels per Contracting Officer approved labeling scheme.
C. Label racks, frames and cabinets per Contracting Officer direction.
D. Label network faceplates to match labeling in patch panels in IT cabinet enclosure.
3.5 TESTING
A. The Contractor shall test 100% of all cables installed. Telecommunications cables shall meet or exceed the current ANSI/TIA/EIA-568 specifications for Category 5E cable and Category 6 cable. All test reports shall be printed and included in the final record documentation package.
B. UPT Copper Cable
1. The TC shall be responsible for recording all test data.
2. Copies of all test results are to be submitted to the Contracting Officer or authorized representative for review as part of the final record documentation package and remain with the Contracting Officer for their records.
3. Category 6 cabling systems shall be performance verified using an automated test set.
Test results shall be automatically evaluated by the equipment, using the most up-to-date criteria from the ANSI/TIA/EIA-568 standard, and the result shown as pass/fail. Test results shall be printed directly from the test unit or from a download file using an application from the test equipment manufacturer. The printed test results shall include all tests performed, the expected test result and the actual test result achieved.
4. The test shall be a permanent link test, unless otherwise specified by the manufacturer.
5. Provide written results of successful testing of CAT 6 cable runs.
3.6 DELIVERY, STORAGE, AND HANDLING
A. Test cables upon receipt at Project site.
27 10 00 -11
1. Test each pair of UTP cable for open and…