Section_01_27_00_-_Contract_Line_Items_GRTE_149677_WATER.pdf
PDF 39 KB Posted
- Attached to
- GRTE 149677 Moose Waste Water/Water Plant Federal contract opportunity
- Solicitation number
- P16PS01023
About this file
Amendment 003_Section 01 27 00 - Contract Line Items_WATER
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRTE – 149677-WATER 01 27 00 - 1
050611 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 11: Taggart Wells
1. This item consists of furnishing all materials, equipment and labor for abandonment of Taggart Well No. 1 installation of new pump, motor, pitless unit and adapter in Taggart Well No. 2 and construction of Taggart Well No. 3.
2. Measurement for payment will be casing pipe, fittings, pumps, motors, pitless unit and adaptors, column pipes, check valves, surface seal and all components and equipment in place complete, operational, and accepted, including but not limited to, all excavation, drilling, well development, well abandonment, forming, concrete, backfill, equipment, piping, electrical, O&M manuals, warrantees and incidentals. Work shall be measured as all items, associated with the well, to within five feet of the new Taggart Well House foundation.
3. Payment will be made at the contract lump sum price bid for “Taggart Wells”. This lump sum price and payment shall be full compensation for all materials, labor, transportation, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the work described and shown on the Drawings.
B. Contract Line Item No. 12: Taggart Well House
1. This item consists of furnishing all materials, equipment and labor for construction of the Taggart Well House. The Work includes, but is not limited to construction of a poured-in-place concrete foundation and masonry building to house water supply equipment consisting of electrical, plumbing, control, process, treatment, disinfection, SCADA and telemetry equipment. Work under this line item also includes relocation of an existing generator, and exterior piping, electrical, vaults and site improvements.
GRTE – 149677-WATER 01 27 00 - 2
2. Measurement for payment will be the concrete, piping, building components and equipment in place, complete, operational, and accepted, including but not limited to, all excavation, stripping, stockpiling and hauling of materials, forming, masonry, reinforcing steel, structural steel, concrete, backfill, grating, roofing, piping, bedding, electrical, controls, surface restoration, O&M manuals, warrantees and incidentals. Work shall be measured as all items from the connection point of the 12 inch diameter polyethylene Moose Water Transmission Line and the ductile iron Taggart Tank site piping as indicated on the drawing.
3. Payment will be made at the contract lump sum price bid for “Taggart Well House”. This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the work described and shown on the Drawings.
C. Contract Line Item No. 13: Electrical Service (by Utility) – Taggart Well House
1. This item consists of all materials, equipment and labor provided by the Power Utility for installation of new electrical service for the Taggart Well House. The work includes coordination between the Contractor and Power Utility(Lower Valley Energy), payment of the power utilities order/connection fees, and installation of the transformer, meter, conduit and conductor. Work required by Contractor for completion of this item including, but not limited to excavation, conduit bedding, backfill, surface restoration and installation of the transformer pad is not included under this item and shall be considered subsidiary to elements of work covered under Contract Line Item No. 2.
2. Measurement for payment will be the complete Electrical Service installed, tested, and accepted including but not limited to all excavation, bedding, backfill, surface restoration, conduit, concrete transformer pad, transformer, meter, conductors and incidentals.
3. Payment will be made at the contract lump sum price provided and established by the Power Utility for “Electrical Service – Taggart Well House.” This lump sum price and payment shall be full compensation for all of the power utilities fees, materials, labor, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
D. Contract Line Item No. 14: Taggart Tank
1. This item consists of furnishing all materials, equipment and labor for construction of the Taggart Water Storage Tank. The structure is a 300,000 gal buried concrete tank. Work includes, but is not limited to, excavation, a poured-in-place concrete foundation, walls and toping slab, installation of a precast concrete roof with a covering system, site piping, supply line mixing system, access hatches and ladders, level monitoring system including radio telemetry, buried electrical and backfill.
2. Measurement for payment will be the concrete, piping, tank components and equipment in place, complete, operational, and accepted, including but not limited to, all excavation, stripping, stockpiling and hauling of materials, reinforcing steel, forming, cast-in-place and precast concrete, roof, backfill, piping, bedding, electrical, controls, telemetry, surface restoration, O&M manuals, warrantees and incidentals.
GRTE – 149677-WATER 01 27 00 - 3
3. Payment will be made at the contract lump sum price bid for “Taggart Tank”. This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the work described and shown on the Drawings.
E. Contract Line Item No. 15: Electrical Service (by Utility) – Taggart Tank
1. This item consists of all materials, equipment and labor provided by the Power Utility for installation of new electrical service for the Taggart Tank. The work includes coordination between the Contractor and Power Utility(Lower Valley Energy), payment of the power utilities order/connection fees, and installation of the transformer, meter, conduit and conductor. Work required by Contractor for completion of this item including, but not limited to excavation, conduit bedding, surface restoration and backfill is not included under this item and shall be considered subsidiary to elements of work covered under Contract Line Item No. 4.
2. Measurement for payment will be the complete Electrical Service installed, tested, and accepted including but not limited to all excavation, bedding, backfill, surface restoration, conduit, transformer pad, transformer, meter, conductors and incidentals.
3. Payment will be made at the contract lump sum price provided and established by the Power Utility for “Electrical Service – Taggart Tank.” This lump sum price and payment shall be full compensation for all of the power utilities fees, materials, labor, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
F. Contract Line Item No. 16: Moose Water Transmission Pipeline
1. This item consists of furnishing all materials, equipment and labor for construction of the Moose Water Transmission Pipeline from the connection points at the new Taggart Tank to the existing Moose water distribution system. The work includes, but is not limited to, existing utility locates, surface removal, trench excavation and backfill, pipe, fittings, pipe warning and locator wire, bedding, precast vaults and manholes, valves, fire hydrants, connections to existing distribution systems at Beaver Creek and Moose, connection to the new Taggart Tank site piping, and surface restoration.
2. Measurement for payment will be the complete Moose Water Transmission Pipeline installed, tested, and accepted including but not limited to, all excavation, stripping, stockpiling and hauling of materials, bedding, backfill, pipe, fittings, manholes, vaults, valves, fire hydrants, meters, telemetry, electrical, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “Moose Water Transmission Pipeline”. This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
G. Contract Line Item No. 17: Demolition of Existing Water Facilities
1. This item consists of demolition of the existing Taggart Well House, above ground steel Taggart Tank, buried concrete Windy Point Tank, and water vaults and manholes as
GRTE – 149677-WATER 01 27 00 - 4
indicated in the drawings. Demolition of the existing Taggart Well House and Tank includes complete removal and transportation of recyclable materials to authorized recycling centers, complete removal and disposal of non-recyclable deleterious materials to the Teton County Transfer Station, and complete removal and disposal of non-deleterious materials such as concrete and concrete block outside the Park. Demolition of Winding Point Tank, and water vaults and manholes along the existing Moose transmission pipeline shall be the same with exception that some concrete components do not require complete removal as described in the construction drawings. Demolition of existing water facilities also includes, backfill, finish grading, and incidentals complete and accepted.
2. Measurement for payment will be the complete demolition, removal and disposal of existing water facilities described above including all materials, equipment, foundations, walls, roof, transportation, excavation, backfill, site grading, and incidentals necessary to complete the demolition.
3. Payment will be made at the contract lump sum price bid for “Demolition of Existing Water Facilities”. This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, tippage fees and incidentals necessary to complete the work described.
H. Contract Line Item No. 18: Rock Excavation
1. This item consists of furnishing all material, labor, and equipment associated with solid and loose rock excavation, as defined in Section 31 23 18 – Rock Excavation, via specialized equipment such as pneumatic chisels, hydraulic hammer, ripping, rock saw, etc. and deemed necessary for water system construction. Item also includes costs for replacement of excavated rock with suitable native compactible materials. Blasting will not be allowed.
2. Measurement for payment will be made per cubic yard of loose or solid rock approved for measurement and payment by the CO’s Representative and excavated by Contractor.
The Contracting Officer’s Representative (COR) shall be present during all rock measurement. The Contractor shall maintain and provide rock quantity tracking sheets and furnish copies to the Contracting Officer’s Representative for review and verification. The Contractor shall not exceed the maximum estimated quantity of rock excavation without a contract modification or direction from the Contracting Officer.
a. Rock Measurement: Determine rock profile by one of three methods:
1) Excavating, ripping, and exposing the rock prior to rock excavation.
2) Drilling prior to rock excavation.
3) Excavating the rock then measuring the rock. Note a 20% reduction in rock volume shall be factored in to account for expansion.
b. Measure solid rock to the nearest 0.1 foot from the surface and no less than every 5 feet along the rock profile:
1) Trenches: Take measurements from the top of the rock to a point 6‐inches below the invert of the pipe and 12‐inches from each side of the pipe or appurtenance with a maximum 36‐inch bottom trench width allowed.
2) Structures: Take measurements starting at 24‐inches from the edge of the structure.
GRTE – 149677-WATER 01 27 00 - 5
3. Payment will be made at the contract cubic yard price bid for “Rock Excavation.” Price per cubic yard shall be full compensation for all materials, labor, material processing plants, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings. Definitions of material where rock excavation payment is justified are as follows:
a. Solid Rock: Large masses of rock which, in the judgment of the COR, cannot be excavated with a track mounted excavator equal in size to the latest model of a Caterpillar Model 325B L equipped with rock bucket.
b. Loose Rock: Boulders and other detached stone that cannot be excavated with the latest model of a Caterpillar Model 325B L equipped with rock bucket, or equal.
c. Conglomerate deposits that are so firmly cemented that they possess the characteristics of solid rock and cannot be removed using the latest model of a Caterpillar Model 325B L equipped with rock bucket, or equal.
I. Contract Line Item No. 19: Bid Option A - 4 Lazy F Water Distribution Pipeline
1. This item consists of furnishing all materials, equipment and labor for construction of the 4 Lazy F Water Distribution Pipeline from the connection point at the Moose water distribution system to the 4 Lazy F Lodge. The work includes, but is not limited to, existing utility locates, surface removal, trench excavation and backfill, pipe, fittings, pipe warning and locator wire, bedding, precast manholes, valves, fire hydrants, connection to the existing distribution system at Moose and surface restoration.
2. Measurement for payment will be the complete Moose Water Transmission Pipeline installed, tested, and accepted including but not limited to, all excavation, stripping, stockpiling and hauling of materials, bedding, backfill, pipe, fittings, manholes, vaults, valves, fire hydrants, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “Bid Option A - 4 Lazy F Water Distribution Pipeline”. This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
J. Contract Line Item No. 20: Bid Option B – Fiber Optic Conduit
1. This item consists of furnishing all materials, equipment and labor for installation of a fiber optic conduit and pull boxes extending from Beaver Creek to the bore under the Teton Park Road located near the Chapel of Transfiguration Road intersection. The work includes, but is not limited to, existing utility locates, surface removal, trench excavation and backfill, fiber optic conduit with built-in tracer wire, pull tape, pull boxes, fiber optic warning tape, and surface restoration.
2. Measurement for payment will be the complete Fiber Optic Conduit installed, tested and accepted including but not limited to, all excavation, stripping, stockpiling and hauling of materials, bedding, backfill, conduit, warning tape, pull boxes, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “Bid Option B – Fiber Optic Conduit.” This lump sum price and payment shall be full compensation for all materials, GRTE – 149677-WATER 01 27 00 - 6 labor, material processing plants, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
K. Contract Line Item No. 21: Bid Option C – Moose Meter Vault
1. This item consists of furnishing all materials, equipment and labor for installation of a metering vault located at Beaver Creek for monitoring flows to Moose. The work includes, but is not limited to, existing utility locates, surface removal, trench excavation and backfill, pipe, fittings, bedding, precast vault and accessories, valves, meter, telemetry, electrical, and surface restoration.
2. Measurement for payment will be the complete Moose Meter Vault installed, tested, and accepted including but not limited to, all excavation, stripping, stockpiling and hauling of materials, bedding, backfill, pipe, fittings, vault, valves, meter, telemetry, electrical, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “Bid Option C – Moose Meter Vault.” This lump sum price and payment shall be full compensation for all materials, labor, material processing plants, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
END OF SECTION 01 27 00