Amendment_0001_Q_and_A_spreadsheet.pdf

PDF 52 KB Posted

Attached to
GRTE 149677 Moose Waste Water/Water Plant Federal contract opportunity
Solicitation number
P16PS01023
Issued by
Department of the Interior National Park Service National Office

About this file

Amendment 0001 Question and Answer Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to GRTE 149677 Moose Waste Water/Water Plant, newest first.
File Type Posted
07_13_26_FL_-_SELF-ADHERING_SHEET_WATERPROOFING_WATER.PDF PDF
07_16_16_-_CRYSTALLINE_WATERPROOFING_WWTP.PDF PDF
07_13_26_-_SELF-ADHERING_SHEET_WATERPROOFING_WWTP.PDF PDF
Amendment_0007_P16PS01023.pdf PDF
Amendment_0006_to_P16PS01023.pdf PDF
Amendment_0005_to_P16PS01023.pdf PDF
07_53_16_-_Chlorosulfonate-Polyethylene_(cspe)_Roofing.pdf PDF
Q_and_A_Amend_004.pdf PDF
Final_Amendment_0004_to_P16PS01023.pdf PDF
Section_31_23_18_-_Rock_Excavation_GRTE_149677_WATER.pdf PDF
Amendment_003_Q_and_A.pdf PDF
Amendment_0003_to_P16PS01023_GRTE_149677.pdf PDF
Amendment_0003_Wage_Rates_Buildings.pdf PDF
Section_01_27_00_-_Contract_Line_Items_GRTE_149677_WATER.pdf PDF
Amendment_0003_Contract_Price_Schedule.pdf PDF
Taggart_Supply_and_Storage_1982.pdf PDF
Ground_Protection_Mats_b.JPG JPG image
Amendment_0002_to_P16PS01023_GRTE_149677.pdf PDF
Moose_WWTP_partial_set.pdf PDF
Ground_Protection_Mats_a.JPG JPG image
Moose_Lift_Station_partial_set.pdf PDF
Transmission_ _Windy_Point_Tank_1956.pdf PDF
Moose-Kelly_Pit_map.pdf PDF
Q_and_A_Amendment_002.pdf PDF
Pre-Bid_Attendance_List_05.17.2016.pdf PDF
GRTE_149677_PreProposal_Presentation5-17-16.pdf PDF
Amendment_0001_to_P16PS01023_GRTE_149677.pdf PDF
Amendment_0001_Spec_01_27_00_Volume_I_WWTP.pdf PDF
Amendment_0001_Vol_I_Submission_Package_P16PS01023.pdf PDF
MooseWater_DrawingSetv2.pdf PDF
Vol_I_Submission_Package_P16PS01023.pdf PDF
Moose_Waste_Water_-_Volume_III_Specs.pdf PDF
Moose_WWTP_Permit_to_Const._No_15-585.pdf PDF
Moose_WWTP_Drawing_setv3.pdf PDF
Permit_to_Construct_Moose_Water.pdf PDF
Moose_Water_System_Specs_Volume_II.pdf PDF
Vol_II_Submission_Package_P16PS01023.pdf PDF
GRTE_149677_Moose_WWTP_Wetlands_Report_09-29-14.pdf PDF
MooseWater_DrawingSetv3.pdf PDF
USACE_022916_NP12_Authorization_Original.PDF PDF
Moose_Water_System_Specs_Volume_I.pdf PDF
Attachment_3_Wage_Rates.pdf PDF
GRTE_149677_Moose_Water_Wetlands_Report.pdf PDF
Moose_WWTP_Drawing_setv2.pdf PDF
Attachment_5_Contractor_Tour_Request_Form.pdf PDF
Moose_Waste_Water_-_Volume_I_Specs.pdf PDF
Moose_WWTP_Drawing_setv1.pdf PDF
Moose_Waste_Water_-_Volume_II_Specs.pdf PDF
MooseWater_DrawingSetv1.pdf PDF
Final_Solicitation_P16PS01023_GRTE_149677.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer

Spreadsheet

P16PS01023

GRTE 149677

Question No. Sheet or Reference Question Response Amendment

Answered

Drawing E4.3; Spec 25‐ 51‐00, Part 1.2.A

On drawing E4.3, General Note 3. States “The National Park service has provided a sole source justification for telemetry system. The telemetry system and components shall be by Motorola and shall be installed by timberline. No substitution of specified equipment will be allowed.”

In the specifications section 25‐51‐00, addresses the integrated automation of the project. In part 1.2.A of the section talks about programming and integration of the telemetry system.

Thus the question I have is: Is the integration and programming of the telemetry system part of the sole source services provided by Timberline, or should it be part of the proposal package?

This question and response pertain to the Moose Water System specifications. The integration of the telemetry and control system between the Taggart Tank and Taggart well house should be part of the proposal package. The integration and programing of data reporting from Taggart Well house to Moose Water Lab is part of the sole source service provided by Timber Line.

There appears to be a discrepancy between E4.3, General note 3, and E5.4. Note 1. Please clarify who is to provide specific panels, or if contractor is providing all.

This question and response pertain to the Moose Water System specifications.

Contractor is providing all. The Contractor is responsible for furnishing and installing all equipment, controls, hardware, and wiring at Taggart Well Tank and Taggart Well House.

Is the pre‐proposal site visit mandatory?

The purpose of the site visit is to give potential offerors the chance to see the project site for proposal pricing. This site visit is not mandatory.

SF1442

The SF 1442 says the proposal is due 6/2/16 and the solicitation (Page 113) states it is due Monday, June 6, 2016. Please clarify when proposals are due for this project.

Proposals are due 06/06/2016 at 10:00am Mountain Daylight Time (MDT).

Section L, Page 113

Factor 1 – Previous Relevant Experience. Offeror shall submit 3‐5 examples of past performance on similar projects in scope and costs that occurred within the last 10 years. Please confirm that a total of 3‐5 examples should be submitted for all three Elements.

Not 3‐5 per Element.

A total of 3‐5 examples.

Projects cited should demonstrate that the Contractor has the technical capability, skills, and experience to successfully manage and perform the three listed elements

Section L, Page 113

Factor 1 – Previous Relevant Experience. Offeror shall submit 3‐5 examples of past performance on similar projects in scope and costs that occurred within the last 10 years. Must an example be at a certain percentage complete in order to submit?

It is the contractor's responsibility to submit projects that best demonstrate their capability to successfully complete this job.