GRTE 149677 Moose Waste Water/Water Plant

Awarded Award Notice Posted

Solicitation number
P16PS01023
Agency
National Office National Park Service, Department of the Interior
Awarded
to Record Steel And Construction, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
P16PC00348 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Grand Teton National Park Moose, Wyoming, United States

Notice details come from SAM.gov. Updated .

Notice text

10 versions

Update #10 · Latest ·

Added: Jun 14, 2016 6:53 pm Amendment 0007 (posted 06/14/2016): Please refer to the SF30 and associated Amendment 0007 documents.

Update #9 ·

Added: Jun 10, 2016 4:37 pm Amendment 0006 (posted 06/10/2016): Please refer to the SF30 and associated Amendment 0006 documents.

Update #8 ·

Added: Apr 15, 2016 2:03 pm Modified: Jun 09, 2016 7:53 pmTrack Changes

Active Solicitation:
The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a Full and Open Competition basis from all interested businesses having the capability to perform the work described below.  Plan holders will be required to visit the website periodically to check for amendments and other changes to the contract documents. No other notifications will be sent. Please Note: Paper copies of the solicitation will not be made available. Prospective offerors desiring to conduct business with the DOI are requested to be registered in the Systems for Awards Management (SAM) at www.sam.gov. It is important to note, award cannot be made to a prospective until that firm is registered in SAM.

Amendment 005: Responses are due no later than Wednesday, June 22, 2016 at 3:00pm Mountain Daylight Time (MDT).  The question deadline has passed.  Any additional questions received will not be addressed.

INTERESTED VENDOR/CONTRACTORS: Please refer to this Solicitation (P16PS01023) on FBO.GOV for a list of interested vendors. The attendance list from the site visit on 05/17/2016 is also uploaded to the documents on FBO.GOV under this solicitation. The NPS does not have any compilation of vendor information other than what is available on FBO.GOV and will not respond to further inquiries requesting the vendors list.

Pre-Proposal Site Visit will be held on Tuesday, May 17, 2016 at 8:30am
at the Craig Thomas Visitor Center located in Moose, Wyoming.  Please refer to Attachment 5, Contractor Pre-Bid Tour Request Form for addtional detail.  RSVP is required.


The NAICS Code for this requirement is 237110.


All work under this contract will be performed within an environmentally sensitive national park. Work will be performed in the high visitation corridor of the park and will be performed while maintaining visitor access.


Description of Work:
The construction of a new 60,000 gpd membrane biological reactor type of activated sludge wastewater treatment plant; new 4 inch diameter HDPE raw sewage force main; 8 inch diameter PVC gravity sewer; 4inch diameter HDPE treated water force main; necessary appurtenances for a complete wastewater treatment facility; and the demolition of the existing Moose wastewater treatment plant when the new facilities are completed and operational. Also included in this component is the requirement to install a temporary lift station, the sewer force main bypass and connect to the existing WWTP force main. Installation of the lift station will need to occur during periods of low groundwater to minimize dewatering. This phase will need to be tested and accepted for operation prior to the start of the next phase


The second component of this requirement consists of the construction of a new water system infrastructure including two 150 gpm wells; a 520 square foot Well House building with electrical and chemical treatment rooms; 300,000 gallon buried concrete water storage tank; installation of approximately 17,100 and 5,525 lineal feet of 12 inch and 8 inch diameter HDPE water transmission main, respectively; electrical and fiber conduits; and telemetry based SCADA control system.


In addition work will include the demolition of existing water system infrastructure including Taggart Well No. 1, the Taggart Well House, a 50,000 gallon insulated above ground steel water storage tank (Taggart Tank), 100,000 gallon buried concrete water storage tank (Windy Point Tank) and existing utility vaults as indicated in the construction drawings.


Completion of each item includes all materials, labor, reclamation, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the construction drawings and these specifications.


Lastly the contractor will be responsible to obtain and pay for all permits and fees from the state and local authorities, including utility and construction permits, fees, and inspections, whether temporary or permanent. Contractor is responsible to include in the bid amount any costs associated with work by Utility Companies.


The entire project will be constructed under a single prime contract.


The estimated magnitude of this project is approximately $9,000,000 to $13,000,000 including all labor, materials, equipment and expertise necessary to perform all operations required for the successful completion of the above named project.


Type of Procurement: It is anticipated that a firm-fixed price contract will be awarded resulting from a full and open competition, requiring submission of both a technical and a price proposal. The government will consider an Offeror's technical capability in comparison to its price.


All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All Offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Responses from Bidders will be accepted at the address listed in the solicitation in hard copy with the manual signature of the authorized company official. Facsimile offers shall NOT be accepted. The Government reserves the right to cancel this solicitation.  

Update #7 ·

Added: Jun 07, 2016 5:56 pm Amendment 0004 (posted 06/07/2016): Please refer to the SF30 and associated Amendment 0004 documents.

Update #6 ·

Added: Jun 01, 2016 4:56 pm Amendment 0003 (posted 06/01/2016): Please refer to the SF30 and associated Amendment 0003 documents.

Update #5 ·

Added: Apr 15, 2016 2:03 pm Modified: May 25, 2016 6:06 pmTrack Changes

Active Solicitation:
The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a Full and Open Competition basis from all interested businesses having the capability to perform the work described below.  Plan holders will be required to visit the website periodically to check for amendments and other changes to the contract documents. No other notifications will be sent. Please Note: Paper copies of the solicitation will not be made available. Prospective offerors desiring to conduct business with the DOI are requested to be registered in the Systems for Awards Management (SAM) at www.sam.gov. It is important to note, award cannot be made to a prospective until that firm is registered in SAM.

Amendment 002: Responses are due no later than Thursday, June 16, 2016 at 3:00pm Mountain Daylight Time (MDT).  Questions are due no later than Thursday, June 9, 2016 at 12:00pm MDT.

INTERESTED VENDOR/CONTRACTORS: Please refer to this Solicitation (P16PS01023) on FBO.GOV for a list of interested vendors. The attendance list from the site visit on 05/17/2016 is also uploaded to the documents on FBO.GOV under this solicitation. The NPS does not have any compilation of vendor information other than what is available on FBO.GOV and will not respond to further inquiries requesting the vendors list.

Pre-Proposal Site Visit will be held on Tuesday, May 17, 2016 at 8:30am
at the Craig Thomas Visitor Center located in Moose, Wyoming.  Please refer to Attachment 5, Contractor Pre-Bid Tour Request Form for addtional detail.  RSVP is required.


The NAICS Code for this requirement is 237110.


All work under this contract will be performed within an environmentally sensitive national park. Work will be performed in the high visitation corridor of the park and will be performed while maintaining visitor access.


Description of Work:
The construction of a new 60,000 gpd membrane biological reactor type of activated sludge wastewater treatment plant; new 4 inch diameter HDPE raw sewage force main; 8 inch diameter PVC gravity sewer; 4inch diameter HDPE treated water force main; necessary appurtenances for a complete wastewater treatment facility; and the demolition of the existing Moose wastewater treatment plant when the new facilities are completed and operational. Also included in this component is the requirement to install a temporary lift station, the sewer force main bypass and connect to the existing WWTP force main. Installation of the lift station will need to occur during periods of low groundwater to minimize dewatering. This phase will need to be tested and accepted for operation prior to the start of the next phase


The second component of this requirement consists of the construction of a new water system infrastructure including two 150 gpm wells; a 520 square foot Well House building with electrical and chemical treatment rooms; 300,000 gallon buried concrete water storage tank; installation of approximately 17,100 and 5,525 lineal feet of 12 inch and 8 inch diameter HDPE water transmission main, respectively; electrical and fiber conduits; and telemetry based SCADA control system.


In addition work will include the demolition of existing water system infrastructure including Taggart Well No. 1, the Taggart Well House, a 50,000 gallon insulated above ground steel water storage tank (Taggart Tank), 100,000 gallon buried concrete water storage tank (Windy Point Tank) and existing utility vaults as indicated in the construction drawings.


Completion of each item includes all materials, labor, reclamation, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the construction drawings and these specifications.


Lastly the contractor will be responsible to obtain and pay for all permits and fees from the state and local authorities, including utility and construction permits, fees, and inspections, whether temporary or permanent. Contractor is responsible to include in the bid amount any costs associated with work by Utility Companies.


The entire project will be constructed under a single prime contract.


The estimated magnitude of this project is approximately $9,000,000 to $13,000,000 including all labor, materials, equipment and expertise necessary to perform all operations required for the successful completion of the above named project.


Type of Procurement: It is anticipated that a firm-fixed price contract will be awarded resulting from a full and open competition, requiring submission of both a technical and a price proposal. The government will consider an Offeror's technical capability in comparison to its price.


All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All Offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Responses from Bidders will be accepted at the address listed in the solicitation in hard copy with the manual signature of the authorized company official. Facsimile offers shall NOT be accepted. The Government reserves the right to cancel this solicitation.  

Update #4 ·

Added: May 18, 2016 5:32 pm 05/18/2016: The PowerPoint presentation as well as the attendance list from the pre-proposal site visit on May 17, 2016 has been posted in the attachments.   
If interested vendors were unable to attend the scheduled pre-proposal site visit, they may visit the Park at their own coordination.  These locations are publicly accessible.  
This posting is for informative purposes only and is not an amendment to the Solicitation.

Update #3 ·

Added: May 10, 2016 1:20 pm Amendment 0001 (posted 05/10/2016): Please refer to the SF30 and associated Amendment 0001 documents. 

Update #2 ·

Added: Apr 15, 2016 2:03 pm Modified: May 03, 2016 4:40 pmTrack Changes

Active Solicitation:
The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a Full and Open Competition basis from all interested businesses having the capability to perform the work described below.  Plan holders will be required to visit the website periodically to check for amendments and other changes to the contract documents. No other notifications will be sent. Please Note: Paper copies of the solicitation will not be made available. Prospective offerors desiring to conduct business with the DOI are requested to be registered in the Systems for Awards Management (SAM) at www.sam.gov. It is important to note, award cannot be made to a prospective until that firm is registered in SAM.

Responses are due no later than Monday, June 6, 2016 at 10:00am Mountain Daylight Time (MDT).  Questions are due no later than Monday, May 30, 2016 at 4:00pm MDT.


Pre-Proposal Site Visit will be held on Tuesday, May 17, 2016 at 8:30am at the Craig Thomas Visitor Center located in Moose, Wyoming.  Please refer to Attachment 5, Contractor Pre-Bid Tour Request Form for addtional detail.  RSVP is required.


The NAICS Code for this requirement is 237110.


All work under this contract will be performed within an environmentally sensitive national park. Work will be performed in the high visitation corridor of the park and will be performed while maintaining visitor access.


Description of Work:
The construction of a new 60,000 gpd membrane biological reactor type of activated sludge wastewater treatment plant; new 4 inch diameter HDPE raw sewage force main; 8 inch diameter PVC gravity sewer; 4inch diameter HDPE treated water force main; necessary appurtenances for a complete wastewater treatment facility; and the demolition of the existing Moose wastewater treatment plant when the new facilities are completed and operational. Also included in this component is the requirement to install a temporary lift station, the sewer force main bypass and connect to the existing WWTP force main. Installation of the lift station will need to occur during periods of low groundwater to minimize dewatering. This phase will need to be tested and accepted for operation prior to the start of the next phase


The second component of this requirement consists of the construction of a new water system infrastructure including two 150 gpm wells; a 520 square foot Well House building with electrical and chemical treatment rooms; 300,000 gallon buried concrete water storage tank; installation of approximately 17,100 and 5,525 lineal feet of 12 inch and 8 inch diameter HDPE water transmission main, respectively; electrical and fiber conduits; and telemetry based SCADA control system.


In addition work will include the demolition of existing water system infrastructure including Taggart Well No. 1, the Taggart Well House, a 50,000 gallon insulated above ground steel water storage tank (Taggart Tank), 100,000 gallon buried concrete water storage tank (Windy Point Tank) and existing utility vaults as indicated in the construction drawings.


Completion of each item includes all materials, labor, reclamation, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the construction drawings and these specifications.


Lastly the contractor will be responsible to obtain and pay for all permits and fees from the state and local authorities, including utility and construction permits, fees, and inspections, whether temporary or permanent. Contractor is responsible to include in the bid amount any costs associated with work by Utility Companies.


The entire project will be constructed under a single prime contract.


The estimated magnitude of this project is approximately $9,000,000 to $13,000,000 including all labor, materials, equipment and expertise necessary to perform all operations required for the successful completion of the above named project.


Type of Procurement: It is anticipated that a firm-fixed price contract will be awarded resulting from a full and open competition, requiring submission of both a technical and a price proposal. The government will consider an Offeror's technical capability in comparison to its price.


All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All Offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Responses from Bidders will be accepted at the address listed in the solicitation in hard copy with the manual signature of the authorized company official. Facsimile offers shall NOT be accepted. The Government reserves the right to cancel this solicitation.  

Update #1 ·

Added: Apr 15, 2016 2:03 pm

The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a Full and Open Competition basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically on the Federal Business Opportunities website at www.fedbizops.gov. The Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. (A single file format is not possible due to the types of files) Plan holders will be required to visit the website periodically to check for amendments and other changes to the contract documents. No other notifications will be sent. Please Note: Paper copies of the solicitation will not be made available. Prospective offerors desiring to conduct business with the DOI are requested to be registered in the Systems for Awards Management (SAM) at www.sam.gov. It is important to note, award cannot be made to a prospective until that firm is registered in SAM.


Proposed Solicitation Issue Date: on/about May 4, 2016. Responses will be due approximately 30 days following issuance of solicitation unless extended by amendment. Search by referencing the
pre-solicitation number (above), Department of the Interior, National Park Service.


Proposed Pre-Proposal Conference will be held at GRTE within 7-10 days after the Request for Proposal on in posted on FBO. Exact date, time and location to be announced in the solicitation.


The NAICS Code for this requirement is 237110.


All work under this contract will be performed within an environmentally sensitive national park. Work will be performed in the high visitation corridor of the park and will be performed while maintaining visitor access.


the construction of a new 60,000 gpd membrane biological reactor type of activated sludge wastewater treatment plant; new 4 inch diameter HDPE raw sewage force main; 8 inch diameter PVC gravity sewer; 4inch diameter HDPE treated water force main; necessary appurtenances for a complete wastewater treatment facility; and the demolition of the existing Moose wastewater treatment plant when the new facilities are completed and operational. Also included in this component is the requirement to install a temporary lift station, the sewer force main bypass and connect to the existing WWTP force main. Installation of the lift station will need to occur during periods of low groundwater to minimize dewatering. This phase will need to be tested and accepted for operation prior to the start of the next phase


The second component of this requirement consists of the construction of a new water system infrastructure including two 150 gpm wells; a 520 square foot Well House building with electrical and chemical treatment rooms; 300,000 gallon buried concrete water storage tank; installation of approximately 17,100 and 5,525 lineal feet of 12 inch and 8 inch diameter HDPE water transmission main, respectively; electrical and fiber conduits; and telemetry based SCADA control system.


In addition work will include the demolition of existing water system infrastructure including Taggart Well No. 1, the Taggart Well House, a 50,000 gallon insulated above ground steel water storage tank (Taggart Tank), 100,000 gallon buried concrete water storage tank (Windy Point Tank) and existing utility vaults as indicated in the construction drawings.


Completion of each item includes all materials, labor, reclamation, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described in the construction drawings and these specifications.


Lastly the contractor will be responsible to obtain and pay for all permits and fees from the state and local authorities, including utility and construction permits, fees, and inspections, whether temporary or permanent. Contractor is responsible to include in the bid amount any costs associated with work by Utility Companies.


The entire project will be constructed under a single prime contract.


The estimated magnitude of this project is approximately $9,000,000 to $13,000,000 including all labor, materials, equipment and expertise necessary to perform all operations required for the successful completion of the above named project.


Type of Procurement: It is anticipated that a firm-fixed price contract will be awarded resulting from a full and open competition, requiring submission of both a technical and a price proposal. The government will consider an Offeror's technical capability in comparison to its price.


All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All Offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov.
Responses from Bidders will be accepted at the address listed in the solicitation in hard copy with the manual signature of the authorized company official. Facsimile offers shall NOT be accepted. The Government reserves the right to cancel this solicitation. This announcement does NOT constitute the solicitation.


 

Attachments

Files attached to this notice, newest first
File Type Posted
07_13_26_FL_-_SELF-ADHERING_SHEET_WATERPROOFING_WATER.PDF PDF
07_16_16_-_CRYSTALLINE_WATERPROOFING_WWTP.PDF PDF
Amendment_0007_P16PS01023.pdf PDF
07_13_26_-_SELF-ADHERING_SHEET_WATERPROOFING_WWTP.PDF PDF
Amendment_0006_to_P16PS01023.pdf PDF
07_53_16_-_Chlorosulfonate-Polyethylene_(cspe)_Roofing.pdf PDF
Amendment_0005_to_P16PS01023.pdf PDF
Final_Amendment_0004_to_P16PS01023.pdf PDF
Q_and_A_Amend_004.pdf PDF
Amendment_003_Q_and_A.pdf PDF
Amendment_0003_to_P16PS01023_GRTE_149677.pdf PDF
Section_31_23_18_-_Rock_Excavation_GRTE_149677_WATER.pdf PDF
Amendment_0003_Contract_Price_Schedule.pdf PDF
Amendment_0003_Wage_Rates_Buildings.pdf PDF
Section_01_27_00_-_Contract_Line_Items_GRTE_149677_WATER.pdf PDF
Taggart_Supply_and_Storage_1982.pdf PDF
Ground_Protection_Mats_b.JPG JPG image
Amendment_0002_to_P16PS01023_GRTE_149677.pdf PDF
Moose_Lift_Station_partial_set.pdf PDF
Transmission_ _Windy_Point_Tank_1956.pdf PDF
Moose-Kelly_Pit_map.pdf PDF
Q_and_A_Amendment_002.pdf PDF
Moose_WWTP_partial_set.pdf PDF
Ground_Protection_Mats_a.JPG JPG image
Pre-Bid_Attendance_List_05.17.2016.pdf PDF
GRTE_149677_PreProposal_Presentation5-17-16.pdf PDF
Amendment_0001_Q_and_A_spreadsheet.pdf PDF
Amendment_0001_to_P16PS01023_GRTE_149677.pdf PDF
Amendment_0001_Vol_I_Submission_Package_P16PS01023.pdf PDF
MooseWater_DrawingSetv3.pdf PDF
USACE_022916_NP12_Authorization_Original.PDF PDF
Moose_Water_System_Specs_Volume_I.pdf PDF
Attachment_3_Wage_Rates.pdf PDF
MooseWater_DrawingSetv2.pdf PDF
Vol_I_Submission_Package_P16PS01023.pdf PDF
Moose_Waste_Water_-_Volume_III_Specs.pdf PDF
Moose_WWTP_Permit_to_Const._No_15-585.pdf PDF
Moose_WWTP_Drawing_setv3.pdf PDF
Permit_to_Construct_Moose_Water.pdf PDF
Moose_Water_System_Specs_Volume_II.pdf PDF
Vol_II_Submission_Package_P16PS01023.pdf PDF
GRTE_149677_Moose_WWTP_Wetlands_Report_09-29-14.pdf PDF
MooseWater_DrawingSetv1.pdf PDF
Final_Solicitation_P16PS01023_GRTE_149677.pdf PDF
GRTE_149677_Moose_Water_Wetlands_Report.pdf PDF
Moose_WWTP_Drawing_setv2.pdf PDF
Attachment_5_Contractor_Tour_Request_Form.pdf PDF
Moose_Waste_Water_-_Volume_I_Specs.pdf PDF
Moose_WWTP_Drawing_setv1.pdf PDF
Moose_Waste_Water_-_Volume_II_Specs.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity