Attachment_1 _Project_Specifications.docx
DOCX document 32 KB Posted
- Solicitation number
- P16PS00184
About this file
Attachment 1 Project Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_P16PS00184_Amd_000002.pdf | ||
| Sol_P16PS00184_Amd_000001.pdf | ||
| Attachment_4 _Cleat_Spec_ _Photos.pdf | ||
| Attachment_7 _Experience_and_PP_Form.docx | DOCX document | |
| Attachment_6 _Quote_Sheet.xlsx | XLSX spreadsheet | |
| Sol_P16PS00184.pdf | ||
| Attachment_5 _Winch_Specs_ _Photos.pdf | ||
| Attachment_2 _Slip_Drawings_and_Specifications.pdf | ||
| Attachment_3 _Pedestal_Specs_ _Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMIS: #172621 10/16/2015
PROJECT SPECIFICATIONS
FABRICATE AND DELIVER 18 SLIP BOAT DOCK
WHISKEYTOWN NATIONAL RECREATION AREA
P16PS00184
A. SCOPE
Whiskeytown National Recreation Area (WNRA) is seeking to add 18 moorage boat slips to “A” Dock at Oak Bottom Marina. These docks are operated and used by the parks concessionaire (Forever Resorts) for rental boats and moorage slip customers for watercraft day use on Whiskeytown Lake. The slips are being added to fulfill visitor use trends and provide the concessionaire adequate space at the busiest marina with-in Whiskeytown National Recreation Area. The new dock and slips must match design details and engineering specifications of the 47 slip existing dock. The new dock and slips will be approximately 135 Ft. long and 58 Ft. wide. This includes winches, cleats, utility pedestals, concrete tiles, and 5th wheel dock attachment assembly. (See Tasks, Attachments, Specifications & Drawings)
B. BACKGROUND / INTRODUCTION
Contractor shall fabricate and deliver one dock measuring 8 Ft. x 135 Ft. with 18 slips. Head dock will be approximately 8 Ft. X 120 Ft. and slips will be approximately 3 Ft. 3 inches X 25 Ft. This fabrication and delivery includes equal or like encased polyethylene pontoons. Docks must be designed to withstand wind loads producing a 20#/sf loading on the projected vertical surface of a boat 26 Ft. long and 2 Ft. 6 inches high (Department of Boating and Waterways marina berthing facility guidelines). Source selection must match existing design requirements and be the best value to the government. Contractor is to provide instructional specifications for existing dock modification for new dock attachment.
C. OBJECTIVES
Contractor shall fabricate and deliver dock that meets or exceeds existing dock requirements, engineering standards, and design specifications. Contractor will match design details consistent with Whiskeytown National Recreation Area Oak Bottom Marina Docks.
D. TASKS
All items listed in this section should be designed specific to the project including beams, joist sizes, and welds. Structural elements shall be sized for live and dead loads of the dock and specific to Shasta County and the State of California Boating and Waterways regulations. Hot Dipped Galvanized A325 (steel to steel) fastens to HDPE A307.
1. Head dock frame shall be fabricated of 8” X 21/2” 12 gauge Galvanized steel channel. The dock must withstand wind loads producing 20 lbs. /sf loading on the projected vertical surface of a boat measuring 26 ft. long and 2 ft. 6 inches high. Design must exceed the Department of California Boating and Waterways Guidelines (DBWGL) by 20%. All head dock concrete deck panels must have fiber reinforced concrete (broom finish) and measure 2ft. X 4 ft. X 2. Dock must be stamped by a professional registered engineer with-in the state of California.
2. Finger slips will be fabricated of 8” X 2 1/2” Galvanized steel channel. A unique engineered torque tube runs inside the slip fingers. It is 3 inches x 3 inches square steel and 25 Ft. long and is specifically designed for better stability and increased strength of the finger slips. All concrete finger deck panels must have fiber reinforced concrete (broom finish) and measure 2ft.X3ft.X 2”
3. Contractor will purchase and deliver two Hubbell # HBL105GFI-30 amp 125 V to 15 Amp Straight Blade pedestals or equal including Raven ® Nickel Plated Brass ¼ Turn Ball Valve Outlet ½” or ¾” (See Attachment 3, Pedestal Specifications). Contractor is responsible for delivery.
4. Contractor shall purchase and deliver two Wintech Model # HM8 5 ton 4:1/24:1 gear ratio Winches or equal (See Attachment Specifications) at the open lake south end of the dock. 220 Lf of ½ “stainless steel rope attaching to (2) 4,500 lb. anchors (additional shoreline dead man and stainless rope may be required).
5. Contractor shall engineer, build, and provide install specifications to NPS staff with one 8 Ft. fifth wheel assembly to existing dock for attachment of new 135 Ft. x 58 Ft. dock. A proven fifth wheel assembly that has a full 8 ft. wide range at all angles must be delivered and connected at both the old head dock and the new head dock. This system is designed to disconnect in case separation is required for repairs or emergencies.
6. Contractor will provide shop drawings including dimensions, mounting, materials, and design. Contractor shall provide two copies of shop drawings to National Park Service (NPS) for approval before proceeding.
7. Contractor shall provide and deliver (72 total) Henderson 503 H cleats or equal for tethering boats (See Attachment 4, Cleat Specifications). These will be delivered on the 18 total slip fingers (4 on each finger dock).
8. 2 X 12 HDPE Fender boards or equal matching material attached with 2 ½” HDG MB’s @24” on center
9. Contractor shall provide schedule of fabrication including expected delivery dates.
10. Contractor shall verify and confirm all dimensions on shop drawing attachments
E. SECURITY AND USE OF PREMISES
Work shall be performed during business hours. Contractor will be issued park pass for the duration of the project. After hour and or weekend work will be pre-approved by the NPS and access keys may be issued if needed.
Contractor is not allowed to establish or set up a fabricate camp with in the park. Contractor will stage in designated parking lot spaces at Oak Bottom Marina.
All equipment working in the park will be weed free and inspected by the park NPS and or designated resource management staff. Contractor will pressure wash undercarriage of all equipment prior to entering the park.
Electricity will not be provided and is the responsibility of the contractor. Generators may be used after 9am on a daily basis.
Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. The site will be accessible Monday through Friday unless otherwise approved by the NPS. Temporary fencing, flagging and barricades are acceptable to safely secure the worksite. The site may be closed during delivery pending approval by NPS. The contractor must work safely around visitors. The contractor shall maintain a clean and safe worksite at all times.
Confine materials/supplies within the worksite and parking spaces provided. Additional storage areas will be designated by the NPS if needed.
Contractor must protect all natural resources including trees and plants within the fabricate Area. If natural resource damage occurs, the contractor is responsible to restore, repair or replace any damaged resources at no additional expense to the government.
· The Contractor may provide temporary barriers to protect existing trees, plants and root zones.
· Must not remove, injure or destroy trees or other plants without prior approval. Must consult with the NPS before removing any agreed-upon roots and branches that may interfere with fabricate.
· Must not fasten ropes, cables or guys to existing trees.
Hauling restrictions: Contractor and sub-contractors must comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the State load restrictions with such additional regulations may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic special permit will not relieve the contractor of liability for damage, which may result from moving equipment.
Legal disposal of associated materials is the responsibility of the contractor.
F. PLACE AND PERIOD OF PERFORMANCE
Fabricate of docks shall occur at the contractor’s manufacturing facility. NPS may choose to perform manufacturing facility site inspection prior to loading and delivery.
Contractor shall engineer, fabricate, deliver, and offload docks at Whiskeytown National Recreation Area Oak Bottom Marina Area Launch ramp on or before April 01, 2016. The project site is located 11 miles west of Redding California off Hwy 299 on the left hand side of the Hwy. It should be noted Lake Levels will rise early in March of this year because the Bureau of Reclamation has a special project taking place in the Oak Bottom Area.