SF_30_Amendment_003.pdf
PDF 182 KB Posted
- Attached to
- NPS PFMD Traffic Count Database Federal contract opportunity
- Solicitation number
- P15PS02901
About this file
Amendment 003 SF-30 and continuation page
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_002.pdf | ||
| SF_30_Amendment_001.pdf | ||
| P15PS02901_SF-1449.pdf | ||
| Attachment_6_Past_Performance_sheet.docx | DOCX document | |
| Attachments_1_through_4.docx | DOCX document | |
| Attachment_5_Traffic_Database_GPAT.doc | DOC document | |
| RFQ_P15PS02901.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government answers to Contractor questions provided IAW with:
(D) Solicitation provisions –
(1) 52.212-1 Instructions to Offerors – Commercial Items (by reference, see SF 1449 Block 27a);
(2) Addenda to 52.212-1
(3) 52.212-2 Evaluation – Commercial Items
Section 1.2 Submission of Questions
Question: Will there be a planned period for demos during the evaluation/selection process?
Answer: The Government does not anticipate allowing for any given vendor(s) to provide a technical demonstration.
However, please see page 29 of the RFQ, a. Technical Approach, bullet 3. Any offeror may provide additional substantiating evidence of the performance of their quoted solution (in the form of brochures or manuals for example; or screen-shots, or any other type of evidence) and that evidence is not counted against the page limit of the narrative description of how the solution meets the QA/QC, Reports, Storage, etc., requirements of the RFQ.
NOTE - the NPS e-mail system limits the size of attachments that can be provided in a single e-mail to 25 MB.
The appropriate work around is to submit sequential e-mails with attachments that individually do not exceed the limit (even if they collectively add up to more than 25 MB).
The Government will re-combine documents that have to be split-up to accommodate this limitation.
The time required to split and send messages should be accounted for in the context of the deadline time for the receipt of quotes.
File details come from the government source that posted it. Updated .