Attachment_D_-_Bid_Schedule.docx

DOCX document 40 KB Posted

Attached to
Fuels Reduction and Roadway Management Project - VCNP Federal contract opportunity
Solicitation number
P15PS02505
Issued by
Department of the Interior National Park Service

About this file

Attachment D - Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Fuels Reduction and Roadway Management Project - VCNP, newest first.
File Type Posted
Amendment_0001_-_Solicitation_Changes_-_Corrections_-_Clarifications_-_KJS.docx DOCX document
Sol_P15PS02505_Amd_000001.pdf PDF
Attachment_F_-_Quality_Assurance_Monitoring_Form.docx DOCX document
Sol_P15PS02505.pdf PDF
Attachment_C_-_Past_Performance_Survey.doc DOC document
Attachment_B_-_Wage_Determination_Decision.docx DOCX document
Attachment_A_-_Performance_Work_Statement.docx DOCX document
Combined_Synopsis_-_Solicitation.doc DOC document
Attachment_E_-_Quality_Assurance_Surveillance_Plan.doc DOC document
Attachment_G_-_Site_Maps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Fuels Reduction and Roadway Management Project – VCNP Bid Schedule

*** A COMPLETE BID SCHEDULE & AND SIGNED COVERSHEET MUST BE SUBMITTED ***

Please refer to the PWS performance requirements, appendices, and other solicitation sections to complete this bid schedule.

Failure to submit pricing for all applicable bid line items of this schedule may render the proposal / bid non-responsive and ineligible for award. The undersigned hereby offers to furnish all labor, materials, tools, equipment, apparatus, facilities, transportation, permits, etc. necessary to accomplish the work of this project in accordance with all requirements of the solicitation, scope of work / statement of work / performance work statement, and all additional documents provided as a part of the solicitation. Line items shall include all state and local permit costs, special fees, licensing, taxes, gross receipts taxes, etc.(if applicable).

Offeror’s Total Bid (Parts A, B, & C)

Company / Business Name

Typed / Printed Name (Individual authorized to submit bid)

______________________________________________________________ _____________________________ Signature Date

Part A: Fuels Reduction

Structure Code
Structure Description
Quantity
Bid Cost/Acre: cut-skid-deck, biomass disposal
Bid Cost/Acre: cut lop & scatter
1051
Dry-mesic mixed conifer forest and woodland – ponderosa pine and Douglas-fir with inclusions of other species
1051_4a_c
Mature forest, >16” d.b.h., <40% canopy cover
$
$
1051_4b_b
Mid-age forest, 9-16” d.b.h., 40-70% canopy cover
$
$
Sub-Totals
$
$
1052
Wet-mesic mixed conifer forest and woodland – Douglas-fir, white fir, blue spruce, aspen, with inclusions of other conifer species
1052_4a_c
Mid-age forest, 9-16” d.b.h., <40% canopy cover
$
$
1052_4b_b
Mid-age forest, 9-16” d.b.h., 40-70% canopy cover
$
$
Sub-Totals
$
$

Intermountain aspen-mixed conifer forest and woodland – aspen and mixed conifer species

1061_3b_b
Young forest, 5-9” d.b.h., 40-70% canopy cover
$
$
1061_4b_b
Mid-age forest, 9-16” d.b.h., 40-70% canopy cover
$
$
Sub-Totals
$
$
Total
$

Part B: Road Maintenance

Activity
Description
Quantity
Bid Cost/Acre:

cut-skid-deck, biomass disposal

Maintenance
See 2.6 Road Maintenance and Appendix C
Closure
See 2.6 Road Maintenance and Appendix C
Repurposing
See 2.6 Road Maintenance and Appendix C
Single Items
Per PWS
Ripping
Mechanically loosening compacted soil
Amendment
Placement of slash and mulch
Installation of rolling dip
Alternation of road template to promote drainage
Outsloping
Alternation of road template to promote drainage
Low water stream crossing
Removing culverts, constructing natural fords, vented ford pipes, armoring, and/or low water bridge
Total
$

Part C: Mobilization / De-Mobilization

Description
Bid Cost:
Mobilization / De-Mobilization
$

Fuels Reduction & Roadway Management Project - VCNP Page 3 of 3

File details come from the government source that posted it. Updated .