subcontracting_WorkSheet.docx

DOCX document 20 KB Posted

Attached to
Re-roof buildings at Fort Vancouver NHS, WA
Solicitation number
P15PS02155
Issued by

About this file

Subcontracting Percentage Worksheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Subcontracting Percentage Worksheet Limitations on Subcontracting (FAR clause 52.219-14) Service-Disabled Veteran-Owned Small Business Set-Aside (FAR clause 52.219-27) Set-Aside under EDWOSB Program (FAR clause 52.219-29) Set-Aside under WOSB Program (FAR Clause 52.219-30)

PRIME CONTRACTOR: ___________________Solicitation or contract number: _____________
SUBCONTRACTORS: ______________________________________________
________________________________________________

Wage determination number and revision: ___________________

PRIME CONTRACTOR
SUBCONTRACTORS
DIRECT LABOR
$
$
FRINGE BENEFITS*
$
$
SUB TOTAL
(A) $
(B) $
LABOR G&A** @_____%
(C) $
(D) $

TOTAL LABOR COSTS

(E) $

(F) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor(s) (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in (A) and enter in (C).

Calculate the subcontractors’ G&A by multiplying their G&A rate by their SUBTOTAL figure in (B) and enter in (D).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (E) and (F).

Next, using this formula, calculate the subcontracting labor percentage. (F) / (E) + (F)

SUBCONTRACTING LABOR COST PERCENTAGE = __________________%

Prepared by: _________________________________________ Date submitted: _______________

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs.
***You will need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (F) even though you must still breakdown the contractor's costs.

File details come from the government source that posted it. Updated .