| CONTRACTOR'S PROPOSAL WORKSHEET | |||||
| BASE BID | |||||
| Construct Water Line to Provide Fire Protection to Public Stables | |||||
| Date | |||||
| Contractor Proposal | Proposal By: | ||||
| Spec. Section | Item | Est Quantity | Unit of Measure | Unit Price ($) | Cost ($) |
| Civil Cost ( I ) | |||||
| 1010 | DCWASA Permiting for New Water Connection | 1 | LS | $ | $ - 0 |
| 1010 | Test Pits | 8 | EA | $ | $ - 0 |
| 1700 | Site restoration | 1212 | SY | $ | $ - 0 |
| 1731 | Pavement Cut and Repair and Traffic Control Military Road and Glover Road | 1 | LS | $ | $ - 0 |
| 2510 | Supply/Install 12 -inch IPS FM HDPE SDR-9 main carrier pipe via directional drilling | 1250 | LF | $ | $ - 0 |
| 02512-1 | DIP CL 52, 18' length, 12" dia. | 190 | LF | $ | $ - 0 |
| 2510 | 12-inch water meter w/ appurtenances and vault | 1 | EA | $ | $ - 0 |
| 2510 | 12-inch backflow preventer w/ appurtenances and vault | 1 | EA | $ | $ - 0 |
| 2510 | 12"x12" Tee | 4 | EA | $ | $ - 0 |
| 2510 | 12"x6" Tee | 1 | EA | $ | $ - 0 |
| 2510 | 12" Gate Valve with Casing | 8 | EA | $ | $ - 0 |
| 2510 | 6" Gate Valve | 2 | EA | $ | $ - 0 |
| 2510 | 45° Bend | 2 | EA | $ | $ - 0 |
| 2510 | 22 1/2° Bend | 1 | EA | $ | $ - 0 |
| 2510 | Air Release Valve | 1 | EA | $ | $ - 0 |
| 2510 | Plug | 4 | EA | $ | $ - 0 |
| 2510 | Joint Adapter | 1 | EA | $ | $ - 0 |
| 2510 | Fire hydrants | 3 | EA | $ | $ - 0 |
| 2240 | Dewatering | 45 | DAYS | $ | $ - 0 |
| 02374-1 | Sediment and Erosion Control | 1 | LS | $ | $ - 0 |
| 02710-1 | Replace Curb & Gutter | 150 | LF | $ | $ - 0 |
| SUBTOTAL: COST ( BASE BID ) | $ - 0 | ||||
| ADD ALTERNATE 1 | |||||
| - | Connect Water Line Lateral to Nature Center with New Hydrant | 1 | LS | $ | $ - 0 |
| DIRECT COST - NET | $ - 0 | ||||
| General Conditions | % | $ - 0 | |||
| SUBTOTAL DIRECT COST | $ - 0 | ||||
| Labor Burden Rate | % | $ - 0 | |||
| SUBTOTAL DIRECT COST | $ - 0 | ||||
| Overhead | % | $ - 0 | |||
| SUBTOTAL | $ - 0 | ||||
| Profit | % | $ - 0 | |||
| SUBTOTAL | $ - 0 | ||||
| Bond | % | $ - 0 | |||
| TOTAL CONSTRUCTION PROPOSAL - BASE BID & ADD ALT. 1 | $ - 0 |