Statement of Work

View the file

Other files

File Type Posted
Sol_P15PS01330_Amd_000001.pdf PDF
Wage_Decison_SCA_San_Bernardino.docx DOCX document
Sol_P15PS01330.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Carpet & Resilient Flooring Replacement Mojave National Preserve April 2015 Introduction Headquartered in Barstow, Mojave National Preserve is located in the northeastern Mojave Desert in California, between interstate freeways 15 and 40. This project is located in the town of Baker California, just off of the I-15 freeway east of Barstow California. Address: 56580 Caltrans Avenue, Baker, CA 92309

General Job Description Provide all labor, equipment, associated installation materials and services to perform the following task for Baker housing unit #114.

Baker housing unit #114 is currently not occupied, so furniture will not have to be moved but kitchen appliances exist which the contractor will be responsible for moving as needed to get the work done. A site visit can be scheduled with a park staff and highly recommended to allow bidders to view the work sites and verify field measurements.

Remove the existing carpet, pad and resilient flooring along with cove base , cleaning the floor surfaces and installing new carpet with pad and vinyl sheet flooring as specified below. See specifications below for more information.

The old vinyl flooring, pad and carpet can be recycled at a recycling center. Recycling centers are available in southern California. Call 1-800-434-9887 for a list of centers. Provide documentation that carpet has been recycled. (NOTE): Similar In-kind carpet, pad and adhesives may be considered but must meet the minimum recycled content, green properties, and yarn weight as specified below. At least 3 different samples of similar color scheme for each carpet must be provided for consideration.

1.) New Flooring : (The Contractor is responsible for field verification of measurements)

Housing unit #114 Carpeting.

Living room: 14 ft. x 15 ft.

Hallway: 10 ft. x 6 ft and 6 ft. x 4 ft.

Bedroom: 13 ft. x 14 ft.

Bedroom: 13 ft. x 14 ft.

Housing unit #114 Vinyl flooring.

Bathroom: 6 ft. x 9 ft.

Bathroom: 5 ft. x 7 ft.

Kitchen: 8 ft. x 12 ft.

Dining Room: 12 ft. x 18 ft.

Entry way: 4 ft. x 4 ft.

Laundry room: 6 ft. x 11 ft.

Garage: 4 ft. x 4 ft.

Product Substitutions.

Unless prohibited or provided for otherwise elsewhere in the Contract, where the accepted contract proposal named products, systems, materials or equipment by manufacturer, brand name and/or by model number or other specific identification, and the Contractor desires to substitute manufacturer or model after award, submit a requested substitution for Government concurrence. Include substantiation, identifying information for Government approval by the contracting officer, as meeting the contract requirements and that it is equal in function, performance, quality and salient features to that in the accepted contract proposal. If the Contract otherwise prohibits substitutions of equal named products, systems, materials or equipment by manufacturer, brand name and/or by model number or other specific identification, the request is considered a "variation" to the contract. "VARIATIONS." When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison to the substitution.

CONSIDERING VARIATIONS

Discussion with the Contracting Officer prior to submission will help ensure functional and quality requirements are met and minimize rejections and re-submittals. Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. The Contractor shall replace such materials or equipment to meet contract requirements at no cost to the government.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained. No payment for materials incorporated in the work will be made if all required Government approvals have not been obtained. No payment will be made for any materials incorporated into the work for any conformance review submittals or information only submittals found to contain errors or deviations from the Solicitation or Accepted Proposal.

1.5 QUALITY ASSURANCE

Provide the Carpet and Rug Institute (CRI) Indoor Air Quality (IAQ) label for carpet, carpet cushion, and adhesives or demonstrate compliance with testing criteria and frequencies through independent laboratory test results. Carpet, carpet cushion, and adhesives bearing the label will indicate that the carpet has been tested and meets the Regulatory Requirements and criteria of the CRI IAQ Carpet Testing Program, and minimizes the impact on indoor air quality. Procure carpet in accordance with 40 CFR 247, and where possible, purchased locally to reduce emissions of fossil fuels from transporting. Conform to EPA requirements in accordance with Section 01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS for carpet. Submit certificates, showing conformance with the referenced standards contained in this section, for the following: Carpet Cushion and Molding. Include in the report percentage of post-industrial and post-consumer recycled material and relative dollar value of recycled content products to total dollar value of products included in project.

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the site in the manufacturer's original wrappings and packages clearly labeled with the manufacturer's name, brand name, size, dye lot number, and related information. Remove materials from packaging and store them in a clean, dry, well ventilated area (100 percent outside air supply, minimum of 1.5 air changes per hour, and no recirculation),protected from damage, soiling, and moisture, and strong contaminant sources and residues, and maintain at a temperature above 60 degrees F for 2 days prior to installation. Carpet or carpet tiles shall not be stored with materials which have high emissions of volatile organic compounds (VOCs) or other contaminants. Do not store carpet near materials that may off gas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.

PART 2 PRODUCTS

Materials Specifications.

Carpet and Pad:Page 4
Vinyl Sheet Flooring:Page 8

2.1 CARPET AND PAD.

Housing Carpet Floor covering: Home Depot Soft Collection Barron – Color: Eco Chic. Or approved Equal.

100% solution dyed softsense polyester fiber, texture style. Density: 2329. Face weight: 55 Oz./Sq. Yd. Pile height: 0.9375 inches. 15 year abrasive wear and texture retention warrantee. Submit manufacturer’s product specifications for approval.

Submittals:

Furnish first quality carpet; free of visual blemishes, streaks, poorly dyed areas, fuzzing of pile yarn, spots or stains, and other physical and manufacturing defects. Provide carpet materials and treatments as reasonably nonallergenic and free of other recognized health hazards. Provide a static control construction on all grade carpets which gives adequate durability and performance. Submit Manufacturer's catalog data and printed documentation stating physical characteristics, durability, resistance to fading, and flame resistance characteristics for each type of carpet material and installation accessory. Submit manufacturer's catalog data for the following items: 1) Carpet Cushion and 2) Carpet Moldings. Submit samples of the following:

a. Carpet: Two "Production Quality" samples 18 by 18 inches of each carpet proposed for use, showing quality, pattern, and color specified.

b. Vinyl or Aluminum Moldings: Two pieces of each type at least 12 inches long.

c. Special Treatment Materials: Two samples showing system and installation method.

2.3 CARPET CUSHION

Housing carpet pad: Home Depot Future Foam Carpet Pad. Or approved Equal.

7/16 inch thick. 8 pound memory foam with moisture barrier. Made from 90% recycled material consisting of 100% premium fine grind rebonded viscoelastic memory foam. CRI green label approved. Submit manufacturer’s product specifications for approval.

2.4 ADHESIVES AND CONCRETE PRIMER

Any use of adhesives and concrete primers shall comply with applicable regulations regarding toxic and hazardous materials.[ Use [peel and stick dry adhesive] [wet adhesive].] Provide water resistant, mildew resistant, nonflammable, and non-staining adhesives and concrete primers for carpet installation as required by the carpet manufacturer. Provide release adhesive for modular tile carpet as recommended by the carpet manufacturer. Provide adhesives flashpoint of minimum 140 degrees F in accordance with ASTM D3278.

2.5 MOLDINGS

Install carpet moldings, either vinyl or aluminum, where floor covering material changes or carpet edge does not abut a vertical surface. Provide a [hammered surface aluminum molding, pinless clamp-down type, designed for the type of carpet being installed. Provide natural color anodized finish. Provide a floor flange of a minimum 1-1/2 inch wide and face a minimum 5/8 inch wide. Heavy-duty vinyl molding designed for the type of carpet being installed. Provide floor flange of a minimum [1 1/2 inches] wide. Provide three color samples to match flooring.

2.6 TAPE

Provide tape for seams as recommended by the carpet manufacturer for the type of seam used in installation. Any seam sealant shall have a maximum VOC content of 50 grams/liter. Do not use sealants that contain 1,1,1-trichloroethane or toluene.

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Do not install carpet on surfaces that are unsuitable and will prevent a proper installation. Prepare subfloor in accordance with flooring manufacturer's recommended instructions. Repair holes, cracks, depressions, or rough areas using material recommended by the carpet or adhesive manufacturer. Free floor of any foreign materials and sweep clean. Before beginning work, test subfloor with glue and carpet to determine "open time" and bond. Submit two copies of the manufacturer's printed installation instructions for the carpet, including preparation of substrate, seaming techniques, and recommended adhesives and tapes.

3.2 PREPARATION OF CONCRETE SUBFLOOR

Do not commence installation of the carpeting until concrete substrate is at least 90 days old. Prepare the concrete surfaces in accordance with instructions of the carpet manufacturer. Match carpet, when required, and adhesives to prevent off-gassing to a type of curing compounds, leveling agents, and concrete sealer.

3.4 INSTALLATION

Conduct installation in accordance with the manufacturer's printed instructions and CRI 104. Protect edges of carpet meeting hard surface flooring with molding and install in accordance with the molding manufacturer's printed instructions. Follow ventilation, personal protection, and other safety precautions recommended by the adhesive manufacturer. Continue ventilation during installation and for at least 72 hours following installation.

3.4.1 Broadloom Installation

Install broadloom carpet direct glue down to have a surface that is smooth, uniform, and secure, with a minimum of seams. Apply regular, unnoticeable, and treated seams with a seam adhesive. Run side seams toward the light, where practical, and where such layout does not increase the number of seams. Install breadths parallel, with carpet pile in the same direction. Match patterns accurately. Neatly cut and fit cutouts, at door jambs, columns and ducts securely. Locate seams at doorways parallel to and centered directly under doors. Do not make seams perpendicular to doors or at pivot points. Provide seams at changes in directions of corridors to follow the wall line parallel to the carpet direction. Lay the carpet lengthwise down the corridors with widths less than 6 feet.

3.4.2 Stretch-in Installation

Provide carpet anchors wherever carpeting abuts vertical surfaces. Install tackless carpet stripping by nailing. Place carpet cushion face-up, as recommended by cushion manufacturer, over entire floor area to be carpeted with joints butted. Do not use adhesives to attach carpet, cushion, or substrate. Comply with carpet manufacturer's instructions for installation. Attach rubber or metal edge strip to substrate with adhesive.

3.5 CLEANING AND PROTECTION

Submit two copies of carpet manufacturer's maintenance instructions describing recommended type of cleaning equipment and material, spotting and cleaning methods, and cleaning cycles.

3.5.1 Cleaning

After installation of the carpet, remove debris, scraps, and other foreign matter. Remove soiled spots and adhesive from the face of the carpet with appropriate spot remover. Cut off and remove protruding face yarn. Vacuum carpet clean.

3.5.2 Protection

Protect the installed carpet from soiling and damage with heavy, reinforced, nonstaining kraft paper, plywood, or hardboard sheets. Lap and secure edges of kraft paper protection to provide a continuous cover. Restrict traffic for at least 48 hours. Remove protective covering when directed by the Contracting Officer.

3.6 REMNANTS

Provide remnants remaining from the installation, consisting of scrap pieces more than 2 feet in dimension with more than 6 square feet total to the Government. Remove non-retained scraps from site and recycle appropriately.

3.7 MAINTENANCE

3.7.2 Maintenance Service

Collect information from the manufacturer about [maintenance agreement] [green lease] options, and submit to Contracting Officer. Service shall reclaim materials for recycling and/or reuse. Service shall not landfill or burn reclaimed materials. When such a service is not available, seek local recyclers to reclaim the materials. Submit documentation of manufacturer's [maintenance agreement] [take-back program] [green lease] for carpet. Include contact information, summary of procedures, and the limitations and conditions applicable to the project. Indicate manufacturer's commitment to reclaim materials for recycling and/or reuse.

End of Section --

VINYL SHEET FLOORING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D4078(2002; R 2008) Water Emulsion Floor Polish
ASTM D5603(2001; R 2008) Rubber Compounding Materials - Recycled Vulcanizate Particulate Rubber
ASTM E2129(2010) Standard Practice for Data Collection for Sustainability Assessment of Building Products
ASTM E648(2010; E 2011) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source
ASTM F1066(2004; E 2010; R 2010) Standard Specification for Vinyl Composition Floor Tile
ASTM F1303(2004; R 2009) Sheet Vinyl Floor Covering with Backing
ASTM F1344(2012) Rubber Floor Tile
ASTM F1482(2004; E 2009; R 2009) Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring
ASTM F1700(2004; R 2010) Solid Vinyl Floor Tile
ASTM F1859(2012) Rubber Sheet Floor Covering Without Backing
ASTM F1860(2012) Rubber Sheet Floor Covering With Backing
ASTM F1861(2008; E 2012; R 2012) Resilient Wall Base
ASTM F1869(2011) Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F1913(2004; R 2010) Vinyl Sheet Floor Covering Without Backing
ASTM F2034(2008) Sheet Linoleum Floor Covering
ASTM F2169(2012) Resilient Stair Treads
ASTM F2170(2011) Determining Relative Humidity in Concrete Floor Slabs in situ Probes
ASTM F2195(2007) Linoleum Floor Tile
ASTM F710(2011) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

GREEN SEAL (GS)

GS-36 (2000) Commercial Adhesives

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 3813 (2004) Resilient Floor Coverings - Cork Floor Tiles

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 253 (2011) Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (1989; R 2005) Adhesive and Sealant Applications

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System

1.01 THIS SECTION INCLUDES

A. Description of flooring and accessories as indicated by the requirements of this section.

1.02 RELATED DOCUMENTS

A. General Provisions of the Contract (including General and Supplementary Conditions and Division 1 sections) apply to the work of this section.

1.03 RELATED SECTIONS

A. (NA)

1.04 QUALITY ASSURANCE AND REGULATORY REQUIREMENTS

A. The installer shall be competent in the installation of vinyl sheet flooring with a minimum of 2 years experience in similar type of installation work.

B. Provide samples of flooring and accessories supplied by one manufacturer, including manufacturer’s product information on warrantee, leveling and patching compounds, and adhesives.

C. Flooring material shall meet the following fire test performance criteria as tested by a recognized independent testing laboratory:

a. ASTM E 648 Critical Radiant Flux of 0.45 watts per sq. cm. or greater, Class I.

b. ASTM E 662 (Smoke Generation) Maximum Specific Optical Density of 450 or less.

1.05 SUBMITTALS

A. Submit simple shop drawings that include a seaming plan, coving details, and manufacturer's technical data, installation and maintenance instructions (latest edition of "Armstrong Guaranteed Installation System," F-5061) for flooring and accessories.

B. Submit the manufacturer's standard samples showing the required colors for flooring and applicable accessories such as cove and floor molding materials for approval. Minimum flooring sample size shall be 12 inch x 12 inch. Work will not begin until all submittals are approved by the contracting officer.

1.06 ENVIRONMENTAL CONDITIONS

A. Deliver materials in good condition to the jobsite in the manufacturer's original unopened containers that bear the name and brand of the manufacturer, project identification, and shipping and handling instructions.

B. Store materials in a clean, dry, enclosed space off the ground, and protected from the weather and from extremes of heat and cold. Protect adhesives from freezing. Store flooring, adhesives and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.

C. Maintain a minimum temperature in the spaces to receive the flooring and accessories of 65ºF (18ºC) and a maximum temperature of 100ºF (38ºC) for at least 48 hours before, during, and for not less than 48 hours after installation. Thereafter, maintain a minimum temperature of 55ºF (13ºC) in areas where work is completed. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances.

D. Install flooring and accessories after the other finishing operations, including painting, have been completed. Close spaces to traffic during the installation of the flooring. Do not install flooring over concrete slabs until they are sufficiently dry to achieve a bond with the adhesive, in accordance with the manufacturer's recommended bond and moisture tests.

PART 2PRODUCTS
2.01RESILIENT SHEET FLOORING MATERIALS

A. Provide Hunters Path ™ Vinyl Sheet Flooring with vinyl-saturated glass backing manufactured by Armstrong World Industries, Inc., in Oklahoma Grain [color selected from the range currently available from Armstrong World Industries, Inc.], 12 ft. (3.65 m) wide, having a nominal total thickness of 0.080 in. (2.0 mm). The polyurethane-coated clear wear layer shall be composed of polyvinyl chloride resin, plasticizer, and stabilizers with a nominal thickness of 0.020 in. (0.5 mm) consisting of a patterned visual with a subtle surface texture. Vinyl sheet flooring shall conform to the requirements of ASTM F 1303, Type I, Grade 1, Class B backing. Residential grade flooring warrantee of 30 years, Light commercial grade flooring warrantee of 10 years. Or approved equal flooring. Or approved equal.

2.02 WALL BASE MATERIALS

A. For integral flash cove base: Provide integral flash cove wall base by extending sheet flooring [4 in. (10.16 cm) up the wall using adhesive and accessories recommended and approved by the flooring manufacturer.

B. For top set wall base: Provide 1/8 in. (3.2 mm) thick, 4 in. (10.16 cm) high Armstrong Color-Integrated Wall Base with a matte finish, conforming to ASTM F 1861, Type TV - Vinyl, Thermoplastic, Group 1 - Solid, Style A – Straight – Cove.

C. Floor trim molding: For floors which have existing wood floor trim molding, the contractor shall replace the existing molding with a similar style of molding that is finished with paint or stain and varnish as needed to duplicate the molding that was replaced.

2.03 ADHESIVES

A. Provide Armstrong S-288 Flooring Adhesive for field areas and Armstrong [S-580 Flash Cove Adhesive at flash coving], [S-725 Wall Base Adhesive at the wall base] as recommended by the flooring manufacturer.

2.04 ACCESSORIES

A. For patching, smoothing, and leveling monolithic subfloors (concrete, terrazzo, quarry tile, ceramic tile, and certain metals), provide Armstrong [S-183 Fast-Setting Cement-Based Underlayment] [S-184 Fast-Setting Cement-Based Patch and Skim Coat] [S-194 Fast-Setting Cement-Based Patch and Underlayment].

B. For sealing joints between the top of wall base or integral cove cap and irregular wall surfaces such as masonry, provide plastic filler applied according to the manufacturer's recommendations.

C. Provide top edge trim caps of anodized aluminum for integral flash cove as approved by the Contracting Officer.

D. Provide a fillet support strip for integral cove base with a minimum radius of 1 in. (2.54 cm) of wood or plastic.

E. Provide transition/reducing strips tapered to meet abutting materials.

F. Provide resilient edge strips, of equal gauge to the flooring, homogeneous vinyl or rubber composition, tapered or bullnose edge, with color to match or contrast with the flooring, or as selected by the park staff from standard colors available.

G. Provide metal edge strips of width shown on the drawings and of required thickness to protect exposed edges of the flooring. Provide units of maximum available length to minimize the number of joints. Use butt-type metal edge strips for concealed anchorage, or overlap-type metal edge strips for exposed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish.

PART 3EXECUTION
3.01INSPECTION

A. Remove all existing kitchen appliances, furniture etc. from the areas to receive new flooring then remove all existing vinyl flooring material down to the concrete subsurface or wood subflooring for all flooring areas that will receive new vinyl flooring. Remove all doors from their hinges as needed.

B. Examine subfloors prior to installation to determine that surfaces are clean, smooth and free from cracks, holes, ridges, and other defects that might prevent adhesive bond or impair durability or appearance of the flooring material.

C. Inspect subfloors prior to installation to determine that surfaces are free from curing, sealing, parting and hardening compounds; residual adhesives; adhesive removers; and other foreign materials that might prevent adhesive bond. Visually inspect for evidence of moisture, alkaline salts, carbonation, dusting, mold, or mildew.

D. Report conditions contrary to contract requirements that would prevent a proper installation. Do not proceed with the installation until unsatisfactory conditions have been corrected.

E. Failure to call attention to defects or imperfections will be construed as acceptance and approval of the subfloor. Installation indicates acceptance of substrates with regard to conditions existing at the time of installation.

3.02 PREPARATION

A. Smooth concrete surfaces, removing rough areas, projections, ridges, and bumps, and filling low spots, control or construction joints, and other defects with Armstrong [S-183 Fast-Setting Cement-Based Underlayment][S-184 Fast-Setting Cement-Based Patch and Skim Coat][S-194 Fast-Setting Cement-Based Patch and Underlayment] as recommended by the flooring manufacturer.

B. Remove paint, varnish, oils, release agents, sealers, and waxes. Remove residual adhesives as recommended by the flooring manufacturer. Remove curing and hardening compounds not compatible with the adhesives used, as indicated by a bond test or by the compound manufacturer's recommendations for flooring. Avoid organic solvents.

C. Perform subfloor moisture testing in accordance with [ASTM F 2170, “Standard Test Method for Determining Relative Humidity in Concrete Slabs Using in-situ Probes”][ASTM F 1869,“Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride”] and Bond Tests as described in publication F-5061, "Armstrong Guaranteed Installation System," to determine if surfaces are dry; free of curing and hardening compounds, old adhesive, and other coatings; and ready to receive flooring. [Relative humidity shall not exceed 80%.][MVER shall not exceed 5 lbs./1000 sq. ft./24 hrs.] On installations where both the Percent Relative Humidity and the Moisture Vapor Emission Rate tests are conducted, results for both tests shall comply with the allowable limits listed above. Do not proceed with flooring installation until results of moisture tests are acceptable. All test results shall be documented and retained.

D. Perform pH tests on concrete floors regardless of their age or grade level. All test results shall be documented and retained.

E. Vacuum or broom-clean surfaces to be covered immediately before the application of flooring. Make subfloor free from dust, dirt, grease, and all foreign materials.

3.03 INSTALLATION OF SHEET FLOORING

A. Install flooring in strict accordance with the latest edition of "Armstrong Guaranteed Installation System", F-5061. Or in accordance to the manufacturer’s installation guidance if another manufacturer’s product is approved for use.

B. Install flooring wall to wall before the installation of floor-set cabinets, casework, furniture, equipment, movable partitions, etc. Extend flooring into toe spaces, door recesses, closets, and similar openings as shown on the drawings.

C. If required, install flooring on pan-type floor access covers. Maintain continuity of color and pattern within pieces of flooring installed on these covers. Adhere flooring to the subfloor around covers and to covers.

D. Scribe, cut, and fit or flash cove to permanent fixtures, columns, walls, partitions, pipes, outlets, and built-in furniture and cabinets.

E. Adhere flooring to the subfloor without cracks, voids, raising and puckering at the seams. Roll with a 100-pound (45.36 kilogram) roller in the field areas. Hand-roll flooring at the perimeter and the seams to assure adhesion. Refer to specific rolling instructions of the flooring manufacturer.

F. Lay flooring to provide a minimum number of seams. Avoid cross seams, filler pieces, and strips. Match edges for color shading and pattern at the seams in compliance with the manufacturer's recommendations.

G. Install flooring with adhesives, tools, and procedures in strict accordance with the manufacturer's written instructions. Observe the recommended adhesive trowel notching, open times, and working times.

H. Using Armstrong S-564 Low-Gloss Seam Coating Kit, prepare seams with S-585 Seam Cleaner and then apply protective Armstrong S-570 Seam Coating. Use methods and sequence of work in conformance with written instructions of the flooring manufacturer. Finish all seams flush and free from voids, recesses, and raised areas. Protect S-570 Seam Coating from dust, debris, and foot traffic as recommended by manufacturer.

I. Provide integral flash cove wall base as needed, including cove fillet support strip and top edge cap trim. Construct flash cove base in accordance with the flooring manufacturer's instructions.

3.04 INSTALLATION OF ACCESSORIES

A. Apply top set wall base to walls, columns, casework, and other permanent fixtures in areas where top-set base is required. Install base in lengths as long as practical, with inside corners fabricated from base materials that are mitered or coped. Tightly bond base to vertical substrate with continuous contact at horizontal and vertical surfaces.

B. Fill voids with plastic filler along the top edge of the resilient wall base or integral cove cap on masonry surfaces or other similar irregular substrates.

C. Place resilient edge strips tightly butted to flooring, and secure with adhesive recommended by the edge strip manufacturer. Install edge strips at edges of flooring that would otherwise be exposed.

D. Apply [butt-type] [overlap] metal edge strips where shown on the drawings, [before] [after] flooring installation. Secure units to the substrate, complying with the edge strip manufacturer's recommendations.

3.05 CLEANING AND PROTECTION

A. Perform initial maintenance according to the latest edition of "Armstrong Guaranteed Installation System," F-5061. Or Approved Equal.

B. Protect installed flooring as recommended by the flooring manufacturer against damage from rolling loads, other trades, or the placement of fixtures and furnishings. (See Finishing The Job in "Armstrong Guaranteed Installation System," F-5061.)