P11 ILSM- Abate Central Chase - revised.pdf

PDF 283 KB Posted

Attached to
Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main Federal contract opportunity
Solicitation number
36C25622R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document describes interim life safety measures for a construction project at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves removing asbestos-containing materials from the central pipe chase and replacing the fire main riser throughout the main hospital building. Work will be completed in phases over two floors at a time, starting from the top floors down, to prevent asbestos exposure. A fire watch will be in place when the sprinkler system is temporarily taken out of service for periods not exceeding eight hours during the riser replacement. The related federal contract opportunity is solicitation number 36C25622R0084 posted by the Department of Veterans Affairs Veterans Health Administration VISN 16 to obtain project 667-18-111 for abating the central chase and replacing the fire main.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
RFIs - Abate Central Chase.pdf PDF
S04 site visit sign in sheet 667-18-111.pdf PDF
36C25622R0084 0001.docx DOCX document
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT B R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf PDF
P01 20200508 IFC Drawings.pdf PDF
P09 Final SOW - Abate Central Chase Replace Fire Main.docx DOCX document
36C25622R0084 Solicitation.docx DOCX document
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Interim Life Safety Measures (ILSM) Used

Project #: _667-18-111__ Title: Abate Central Chase/Replace Fire Main Date: _3/14/2022_

Based on the responses to the evaluation questions, provide a description of the ILSM that will be implemented during the project to compensate for the deficiency or condition. Attach additional sheets if necessary.

Overton Brooks VAMC has a requirement to remove all the asbestos in the central pipe chase and to replace the fire main riser in the main hospital, Building 1. The central pipe chase and fire main traverse through all floors of the hospital. This project will remove friable asbestos containing material within the main central chase of the hospital. Asbestos containing material is being removed to allow for the facilities primary fire main risers to be replaced. New fire main risers will be installed. Piping in the central chase will be re-insulated. Project will require extensive phasing to prevent asbestos related exposure. New fire main risers need to be installed prior to removal of existing ones. Fire riser and associated floor zone valves, flow switches, hose connections, tamper switches and test & drain valve components and piping will be replaced from Sub-Basement up to 12th floor, two floors at a time, starting with 11th and 12th floor and work down to Sub-Basement. Coordinate all phasing requirements with all other trades. Refer to sheet Gl103 Phasing Plan. All existing fire protection piping shall be relocated to create required space for installation of all new services for new construction. The old sprinkler system will be taken out of service and shall have a maximum shutdown period of 8 hours. A fire watch will be in place while the system is out of service. Fire riser will be valved off/bypassed to ensure isolation of the two floors and continued supply to the remaining floors.

Signatures required as indicated below. Completed form will be maintained in the project file.

Project COR: __________________________________ Date: _3/14/2022__

Reviewers:

1. Safety Manager: _______________________________ Date: _____________

2. Chief Engineer: ____________________________ Date: ____________

2022-04-13T11:12:47-0500
PAUL M. CELLI 3377041
2022-04-13T15:16:03-0500
ARCHIE A. LANHAM 244999
2022-04-14T07:53:32-0500
JOSEPH L. HEDDINGS 3389785

File details come from the government source that posted it. Updated .