RFIs - Abate Central Chase.pdf

PDF 549 KB Posted

Attached to
Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main Federal contract opportunity
Solicitation number
36C25622R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a request for information (RFI) form and responses related to federal contract opportunity number 36C25622R0084. The opportunity is for project 667-18-111 to abate the central chase and replace a fire main at a Veterans Affairs medical center. The RFI form includes questions about whether the steam lines will be shut down during abatement work, whether the chase areas will be considered confined spaces, confirmation that there are no bus ducts, a request for more information on materials in a brick flue scheduled for demolition, criteria for temporary working platforms, and whether existing debris in the chase area must be cleaned. The VA provided responses confirming steam outages will be phased, the chase areas meet the definition of a confined space, there are no bus ducts, attached a drawing with information on the brick flue, referred to drawings for platform requirements, and confirmed debris must be cleaned per contract specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
S04 site visit sign in sheet 667-18-111.pdf PDF
36C25622R0084 0001.docx DOCX document
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
P11 ILSM- Abate Central Chase - revised.pdf PDF
P01 20200508 IFC Drawings.pdf PDF
P09 Final SOW - Abate Central Chase Replace Fire Main.docx DOCX document
36C25622R0084 Solicitation.docx DOCX document
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT B R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104

Project No. 667-18-111 Abate Central Chase and Replace Fire Main 36C25622R0084

EXHIBIT F

REQUEST FOR INFORMATION (RFI) FORM

NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED ON ONE FORM VIA

EMAIL TO Beth.Cook@va.gov BY AN EDITABLE USE OF THIS FORM. Please identify, in numerical sequence, each set of inquiries that you send.

Date of Proposal Inquiry: 08/19/2022

Proposal Inquiry: (Type inquiry below)

Proposal RFI #1 – Steam Shutdown

Will the Steam Lines be shut down during abatement?

Proposal RFI #2 – Confined Space

Will the chase areas be considered “confined spaces”?

Proposal RFI #3 – Bus Ducts

Please confirm that there are no Bus Ducts.

Proposal RFI #4 – Brick Flue

Can you provide further information regarding the brick flue that is scheduled to be demolished, such as: what materials are in the inner section, are there existing design documents available on the flue?

Proposal RFI #5 – Work Decks Can criteria be provided on the temporary working platforms required to be built at each floor to provide a safe working deck?

Proposal RFI #6 – Existing Debris Will the existing debris that has been accumulated over the years that is present in the chase area be required to be cleaned in this project? If so, can the clean up take place up front of the abatement schedule?

mailto:Beth.Cook@va.gov VHASHRHoffmG Text Box VA Response: 8/26/2022

1. Yes, Steam outage will be in phases per drawings.

2. Yes, It has Limited or restricted means for entry and exit; and is not designed for continuous occupancy. OSHA 29 CFR 1926 Subpart AA.

3. Yes, Assuming the term "Bus Ducts" it refers to Electrical conduit.

4 Please see attached drawing.

5. Refer to drawings SE 101-103 Plan notes.

6. Yes, per general notes on drawing GI 102 Performance of Work (6), and General Requirements specs 01 00 00 -1 1.2 (a), 1.3 (a) and spec 02 41 00 - 4, 3.2 Clean up.