P09 Final SOW - Abate Central Chase Replace Fire Main.docx

DOCX document 119 KB Posted

Attached to
Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main Federal contract opportunity
Solicitation number
36C25622R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This statement of work outlines requirements for a construction project at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves removing asbestos from the central pipe chase of the main hospital building and replacing the fire main riser system across 12 floors. Key requirements include fully abating and re-insulating piping in the central chase, replacing the existing 6-inch fire sprinkler standpipe from the first to twelfth floors, installing new control valves and access panels at each floor, sealing all chase penetrations to NFPA standards, and installing new fire-rated chase access doors. The work must be completed within 200 days of notice to proceed and will require extensive phasing to renovate floors two at a time while maintaining hospital operations. Infection control protocols and measures to control noise, odors and contain debris must also be followed.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
S04 site visit sign in sheet 667-18-111.pdf PDF
36C25622R0084 0001.docx DOCX document
RFIs - Abate Central Chase.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT B R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf PDF
P01 20200508 IFC Drawings.pdf PDF
36C25622R0084 Solicitation.docx DOCX document
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
P11 ILSM- Abate Central Chase - revised.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Abate Central Chase/Replace Fire Main Project No. 667-18-111

SCOPE OF WORK (SOW):

Overton Brooks VAMC has a requirement to remove all the asbestos in the central pipe chase and to replace the fire main riser in the main hospital, Building 1. The central pipe chase and fire main traverse through all floors of the hospital. This project will remove friable asbestos containing material within the main central chase of the hospital. Asbestos containing material is being removed to allow for the facilities primary fire main risers to be replaced. New fire main risers will be installed. Piping in the central chase will be re insulated. Project will require extensive phasing to prevent asbestos related exposure. New fire main risers need to be installed prior to removal of existing ones.

The C&A requirements do not apply, and that a Security Accreditation Package is not required.

PERIOD OF PERFORMANCE:

The Contractor shall complete the work 200 Days from the issuance of Notice to Proceed.

CONTRACTOR SITE VISIT AND FIELD VERIFICATION PRIOR TO BIDDING:

Contractor shall be responsible for attending the Pre-Bid Site visit prior to bidding to verify all existing conditions and take any necessary measurements required to adequately bid the project. If the contractor chooses not to attend the Pre-Bid Site visit, the contractor may submit their bid at their own risk.

INFECTION CONTROL DURING CONSTRUCTION:

Contractor shall follow and comply with the established Infection Control Risk Assessment (ICRA) specific for numerous project sites. Contractor is responsible for dust control during demolition, during construction, and during hauling operations.

DEMOLITION:

Contractor shall protect all adjacent areas of the hospital, especially windows and doors during all operations. Repairing any damage shall be the sole responsibility of the contractor. If any damage is noticed prior to starting work which may be misconstrued as damage caused by the contractor, the COR shall be notified immediately, and the damage shall be documented as existing conditions.

NEW WORK:

New work includes:

1. All asbestos containing material in this scope of work shall be abated and pipes re-insulated.

2. Existing 6” Fire Sprinkler Standpipe system shall be replaced from the 1st floor to the 12th floor and to the control valves for each floor.

3. New system shall include, but not limited to, new control valves at each floor, approved fire cabinet enclosure or with an access panel at each floor (fire rated).

4. All chase penetrations or existing breeches are to be sealed per NFPA requirements.

5. New Fire rated chase access doors are to be installed at each floor.

6. Any items or systems determined to be abandoned or no longer required shall be identified to be removed and capped or terminated.

PHASING, NOISE, SMELLS, AND AFTER-HOURS WORK:

PHASING IS LIMITED TO TWO FLOORS AT A TIME, WORKING FROM THE TOP FLOOR DOWN

PHASE 1: TWELFTH AND ELEVENTH FLOORS PHASE 2: TENTH AND NINTH FLOORS PHASE 3: EIGHTH AND SEVENTH FLOORS PHASE 4: SIXTH AND FIFTH FLOORS

PHASE 5: FOURTH AND THIRD FLOORS PHASE 6: SECOND AND FIRST FLOORS

PHASE 7: BASEMENT AND SUB-BASEMENT FLOORS

The areas to be renovated will likely be occupied during construction, therefore, adequate scheduling shall be coordinated with the COR. Work resulting in extensive noise or odor, shall be performed after hours or on weekends. Any required utility outages shall be scheduled at the convenience of the hospital, and potentially require after hours work or on weekends.

DELIVERIES:

Contractor shall coordinate all material and equipment deliveries, storage, and handling requirements with the COR.

FINAL CLEAN, PRE-FINAL AND FINAL INSPECTIONS:

Once all work has been completed, the Contractor shall adequately clean the project sites prior to a Pre-Final Inspection. Upon completion of the Pre-Final punch list items, the contractor shall request a Final Inspection. Each of these inspections will be scheduled at the convenience of the hospital.

SUBMITTALS:

Provide: Email an electronic copy to the COR and each copy shall have a completed VA transmittal sheet attached.

Contractor shall provide submittal as detailed in the specifications and samples of all finishes showing the full range of available colors and options to be selected by the VA-ID and COR.

ADDITIONAL GUIDANCE:

AREA

OF

WORK

CENTRAL

CHASE

)Contractor shall remove and dispose of waste daily in accordance with all legal and VA requirements. Dumpsters shall be emptied immediately once full. No debris shall be placed around the dumpster or piled/stacked above the top edge of the dumpster walls.