P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf

PDF 221 KB Posted

Attached to
Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main Federal contract opportunity
Solicitation number
36C25622R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains an Infection Control Risk Assessment (ICRA) for the Abate Central Chase Replace Fire Main project at the Overton Brooks VAMC. The ICRA identifies the construction project as Type B, involving small scale activities that create minimal dust such as cutting through plaster walls. It rates the affected patient risk groups as Medium Risk and determines the class of precautions according to the ICRA Matrix is Class II.

The related federal contract opportunity is solicitation number 36C25622R0084 for project 667-18-111 to abate the central chase and replace the fire main at the Overton Brooks VAMC. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 16 to obtain contractor support for the construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
RFIs - Abate Central Chase.pdf PDF
36C25622R0084 0001.docx DOCX document
S04 site visit sign in sheet 667-18-111.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT B R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
P11 ILSM- Abate Central Chase - revised.pdf PDF
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
P01 20200508 IFC Drawings.pdf PDF
P09 Final SOW - Abate Central Chase Replace Fire Main.docx DOCX document
36C25622R0084 Solicitation.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)

*A preliminary ICRA is required for contracting purposes only; do not post during construction. The FINAL ICRA must be posted at the construction site.

Project: Abate Central Chase Replace Fire Main 667-18-111 Preliminary Assessment* by: Date:____ FINAL ICRA Determined and Processed by: Vickie L Moore Final Date: April 1, 2022___

STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)

TYPE

A

Inspection and Non-Invasive Activities. Includes, but is not limited to:

removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

TYPE

B

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.

Project Specific: cutting through plaster walls in hallway required

TYPE

C

Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to:

sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework; new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single work shift.

TYPE

D

Major demolition and construction projects Includes, but is not limited to:

activities which require consecutive work shifts requires heavy demolition, removal of a complete cabling system, or excavation new construction.

STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.

Low Risk Medium Risk High Risk Highest Risk

Office areas Kitchen storage area Public access, hallways, elevator Lobby

Non-clinical vacated engineering space

Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory

Therapy Kitchen – food preparation area

Step Down Unit Emergency Room Laboratories (specimen) Medical Units Outpatient Surgery Pharmacy Post Anesthesia Care Unit Surgical Units Minor Procedure Rooms Sterile Supply storage/distribution

Immunocompromised patient care areas

Cardiac Cath Lab Sterile Processing Service Preparation Area Decontamination Area

Intensive Care Unit Negative pressure isolation rooms Oncology Operating rooms

STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type

Patient Risk Group TYPE A TYPE B TYPE C TYPE D

IC

M at ri x LOW Risk Group I II II III/IV

MEDIUM Risk Group I II III IV

HIGH Risk Group I II III/IV IV

HIGHEST Risk Group II III/IV III/IV IV

Preliminary ICRA Approved Final ICRA Approved

X Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager

4/13/2022

X Vickie L Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380

STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk
TYPE D
TYPE C
TYPE B
TYPE A

File details come from the government source that posted it. Updated .