This document contains an Infection Control Risk Assessment (ICRA) for the Abate Central Chase Replace Fire Main project at the Overton Brooks VAMC. The ICRA identifies the construction project as Type B, involving small scale activities that create minimal dust such as cutting through plaster walls. It rates the affected patient risk groups as Medium Risk and determines the class of precautions according to the ICRA Matrix is Class II.
The related federal contract opportunity is solicitation number 36C25622R0084 for project 667-18-111 to abate the central chase and replace the fire main at the Overton Brooks VAMC. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 16 to obtain contractor support for the construction project.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Prevention & Control Construction Risk Assessment (ICRA)
*A preliminary ICRA is required for contracting purposes only; do not post during construction. The FINAL ICRA must be posted at the construction site.
Project: Abate Central Chase Replace Fire Main 667-18-111 Preliminary Assessment* by: Date:____ FINAL ICRA Determined and Processed by: Vickie L Moore Final Date: April 1, 2022___
STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D)
TYPE
A
Inspection and Non-Invasive Activities. Includes, but is not limited to:
removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE
B
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
Project Specific: cutting through plaster walls in hallway required
TYPE
C
Work generates a moderate/high level of dust or requires demolition/removal of any fixed building components or assemblies Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework; new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single work shift.
TYPE
D
Major demolition and construction projects Includes, but is not limited to:
activities which require consecutive work shifts requires heavy demolition, removal of a complete cabling system, or excavation new construction.
STEP TWO: CIRCLE the affected Patient Risk Groups. If more than one risk group will be affected, select the higher risk group.
Low Risk Medium Risk High Risk Highest Risk
Office areas Kitchen storage area Public access, hallways, elevator Lobby
Non-clinical vacated engineering space
Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory
Therapy Kitchen – food preparation area
Step Down Unit Emergency Room Laboratories (specimen) Medical Units Outpatient Surgery Pharmacy Post Anesthesia Care Unit Surgical Units Minor Procedure Rooms Sterile Supply storage/distribution
Immunocompromised patient care areas
Cardiac Cath Lab Sterile Processing Service Preparation Area Decontamination Area
Intensive Care Unit Negative pressure isolation rooms Oncology Operating rooms
STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk Construction Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
IC
M at ri x LOW Risk Group I II II III/IV
MEDIUM Risk Group I II III IV
HIGH Risk Group I II III/IV IV
HIGHEST Risk Group II III/IV III/IV IV
Preliminary ICRA Approved Final ICRA Approved
X Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager
4/13/2022
X Vickie L Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380
| STEP ONE: CIRCLE the Type of Construction Project based on scope and expected activity (Type A-D) |
| STEP THREE: Using the IC Matrix CIRCLE the Class of Precautions as determined by Construction Type and Patient Risk |
| TYPE D |
| TYPE C |
| TYPE B |
| TYPE A |