About this file

This document contains a past and present performance questionnaire for a federal construction contract opportunity. The Department of Veterans Affairs is soliciting proposals for project 667-18-111 to abate central chases and replace a fire main at an unspecified VA facility. Offerors are required to provide the past performance questionnaire to references from previous relevant contracts, and instruct the references to return the completed forms directly to the contracting officer, Beth Cook, by the time set for receipt of proposals. The questionnaire collects information on the contractor's performance on areas such as management, quality control, scheduling, and responsiveness. It also asks the reference for an overall rating of the contractor and whether they would award the contractor another contract.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
36C25622R0084 0001.docx DOCX document
S04 site visit sign in sheet 667-18-111.pdf PDF
RFIs - Abate Central Chase.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf PDF
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
P01 20200508 IFC Drawings.pdf PDF
P09 Final SOW - Abate Central Chase Replace Fire Main.docx DOCX document
36C25622R0084 Solicitation.docx DOCX document
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
P11 ILSM- Abate Central Chase - revised.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 667-18-111 Abate Central Chase and Replace Fire Main 36C25622R0084

EXHIBIT B

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS TO CONTRACTOR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contract Specialist via postal mail or email, directly to:

Department of Veterans Affairs NCO 16 Contracting Office ATTN: Beth Cook REF: 36C25622R0084 400 Veterans Avenue (NCO 16) Bldg. 2, Room 3B113 Biloxi, MS 39531 Email Address (preferred): Beth.Cook@va.gov

Please return the completed form no later than the time set for receipt of proposals. If you have any questions, please contact Beth Cook via email. Thank you for your assistance in this matter.

GENERAL INFORMATION [completed by Contractor]

Contractor Company Name

Street Address

Contractor Point of Contact Name

City

Point of Contact Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box) ☐ Prime Contractor ☐ Sub-contractor ☐ Key Personnel

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Fax Number

Zip Code

Email

PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the Remarks section, below (text box will expand to whatever extent is necessary).

1
2
3
4
5
6
UNSATISFACTORY
MARGINAL
SATISFACTORY
VERY GOOD
EXCEPTIONAL
NEUTRAL
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.
No record of past performance or the record is inconclusive.[endnoteRef:1] [1: ]
The Contractor …
1
2
3
4
5
6
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
☐☐☐☐☐☐
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
☐☐☐☐☐☐
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
☐☐☐☐☐☐
4.
Home office participated in solving significant local problems.
☐☐☐☐☐☐
5.
Followed approved quality control plan.
☐☐☐☐☐☐
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
☐☐☐☐☐☐
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
☐☐☐☐☐☐
8.
Provided timely resolution of contract discrepancies
☐☐☐☐☐☐
9.
Identified problems as they occurred.
☐☐☐☐☐☐
10.
Suggested alternative approaches to problems.
☐☐☐☐☐☐
11.
Displayed initiative to solve problems.
☐☐☐☐☐☐
12.
Developed realistic progress schedules.
☐☐☐☐☐☐
13.
Met established project schedules.
☐☐☐☐☐☐
14.
Provided timely resolution of warranty defects.
☐☐☐☐☐☐
15.
Was responsive to contract changes.
☐☐☐☐☐☐
16.
Provided adequate project supervision.
☐☐☐☐☐☐
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
☐☐☐☐☐☐
18.
Paid subcontractors/suppliers in a timely manner.
☐☐☐☐☐☐
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
☐☐☐☐☐☐
20.
Cooperated with Government personnel after award.
☐☐☐☐☐☐
21.
How would you rate the contractor's overall performance?
☐☐☐☐☐☐
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
☐YES
☐NO
23
Would you award another contract to this contractor? If not, please explain in “remarks.”
☐YES
☐NO
24
To the best of your knowledge, is the contractor rated in CPARS?
☐YES
☐NO

REMARKS (Please use as much space as is needed – the box will expand as you type).