P01 Class II Precautions - Abate Cental Chase FINAL.pdf
PDF 176 KB Posted
- Attached to
- Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main Federal contract opportunity
- Solicitation number
- 36C25622R0084
About this file
This document outlines infection control precautions for a construction project at the Overton Brooks VAMC. The project involves abatement of asbestos in the central chase crawl space. Required precautions during construction include active means to reduce airborne dust, misting work surfaces to control dust, sealing unused doors, blocking and sealing air vents if HVAC is removed or isolated, placing dust mats at entrances and exits, removing or isolating HVAC in work areas, tightly covering and cleaning containers used to transport construction waste, utilizing a designated construction route when removing debris, and restoring HVAC where work was performed upon completion. Additional requirements upon project completion are terminal cleaning once work is fully finished and maintaining control measures until all work is complete. Exceptions must be approved by the Infection Prevention program manager.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Control Precautions for Class II Projects
Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.
PROJECT: BW Crawl Space Asbestos Abatement Precautions
During Construction Project Upon Completion of Project
C la ss
II
1. Provide active means to reduce airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents if the HVAC system is removed or isolated.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate HVAC system in areas where work is being performed if required to prevent contamination of adjacent areas.
7. Construction Waste
a. Transport in tightly covered container,
b. Containers without tight fitting solid lids must have covering taped in place BEFORE transport outside the project area,
c. Outside of containers must be cleaned when visibly soiled
8. When removing construction debris, utilize only the designated construction route.
1. Wipe work surfaces with cleaner/disinfectant.
2. Contain and transport construction waste as outline for “During Construction”.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Upon completion, restore HVAC system where work was performed.
5. Schedule Terminal Clean once work is complete
Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.
Preliminary Final
X Vickie L. Moore Infection Prevention Program Manager
4/13/2022
X Vickie L Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380