This document provides details on a federal solicitation opportunity and the related technical drawings file. Solicitation number 36C25622R0084 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 seeks bids for project 667-18-111 to abate the central chase and replace the fire main at Z1DA. The purpose of the project is to solicit bids for abating asbestos in the central chase and replacing the existing fire main. The related file, P01 20200508 IFC Drawings.pdf, contains technical drawings to assist bidders with their responses to the solicitation. Bids are due based on the response date specified in the solicitation document.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CON Project 667-18-111 Abate Central Chase / Replace Fire Main, newest first.
File Type Posted
S04 site visit sign in sheet 667-18-111.pdf PDF
RFIs - Abate Central Chase.pdf PDF
36C25622R0084 0001.docx DOCX document
P09 Final SOW - Abate Central Chase Replace Fire Main.docx DOCX document
36C25622R0084 Solicitation.docx DOCX document
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0084 EXHIBIT F R1.docx DOCX document
36C25622R0084 EXHIBIT C R1.docx DOCX document
P11 ILSM- Abate Central Chase - revised.pdf PDF
36C25622R0084 EXHIBIT E R1.docx DOCX document
Construction Risk Assessment- Abate Central Chase.pdf PDF
P01 Class II Precautions - Abate Cental Chase FINAL.pdf PDF
P01 20200508 IFC Specifications.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0084 EXHIBIT D R1.docx DOCX document
36C25622R0084 EXHIBIT B R1.docx DOCX document
36C25622R0084 EXHIBIT A R1.docx DOCX document
P01 ICRA - Abate Central Chase Replace Water Main ICRA FINAL.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA OF WORK

CENTRAL CHASE

KEY PLAN

N.T.S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

LAVASTID

A

S T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

COVER SHEET AND INDEX

GI100

ASBESTOS ABATEMENT

HA101 ASBESTOS ABATEMENT SUB-BASEMENT AND BASEMENT

HA102 ASBESTOS ABATEMENT FIRST FLOOR AND SECOND FLOOR

HA103 ASBESTOS ABATEMENT THIRD FLOOR AND FOURTH FLOOR

HA104 ASBESTOS ABATEMENT FIFTH FLOOR AND SIXTH FLOOR

HA105 ASBESTOS ABATEMENT SEVENTH FLOOR AND EIGHTH FLOOR

HA106 ASBESTOS ABATEMENT NINTH FLOOR AND TENTH FLOOR

HA107 ASBESTOS ABATEMENT ELEVENTH FLOOR AND TWELFTH FLOOR

ELECTRICAL

EP001 ELECTRICAL COVER SHEET

ED101 ELECTRICAL DEMOLITION PLAN

ED102 ELECTRICAL DEMOLITION PLAN

EP101 ELECTRICAL PLAN

EP102 ELECTRICAL PLAN

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

STRUCTURAL

SE101 CHASE PLANS

SE102 CHASE PLANS

SE103 FRAMING DETAILS

DEDUCT ALTERNATES:

1. ELIMINATE THE PHASING

AND CONDUCT THE

PROJECT AS A SINGLE

PHASE.

2. ELIMINATE THE

STRUCTURAL PLATFORMS.

ABATE CENTRAL CHASE AND REPLACE FIRE MAIN

OVERTON BROOKS VA MEDICAL CENTER

SHREVEPORT LOUISIANA

FIRE PROTECTION

FP001 FIRE PROTECTION COVER SHEET

FD101 FIRE PROTECTION DEMOLITION PLANS SUB-BASEMENT TO FIFTH FLOOR

FD102 FIRE PROTECTION DEMOLITION PLANS SIXTH TO TWELFTH FLOOR

FP101 FIRE PROTECTION PLANS SUB-BASEMENT TO FIFTH FLOOR

FP102 FIRE PROTECTION PLANS SIXTH TO TWELFTH FLOOR

PHASING:

PHASING IS LIMITED TO TWO FLOORS AT A TIME,

WORKING FROM THE TOP FLOOR DOWN.

PHASE 1: TWELFTH AND ELEVENTH FLOORS

PHASE 2: TENTH AND NINTH FLOORS

PHASE 3: EIGHTH AND SEVENTH FLOORS

PHASE 4: SIXTH AND FIFTH FLOORS

PHASE 5: FOURTH AND THIRD FLOORS

PHASE 6: SECOND AND FIRST FLOORS

PHASE 7: BASEMENT AND SUB-BASEMENT FLOORS

SHEET INDEX

NUMBER TITLE

GENERAL

GI100 COVER SHEET AND INDEX

GI101 ARCHITECTURAL ABBREVIATIONS

GI102 SYMBOLS, LIFE SAFETY, AND PROJECT GENERAL NOTES

GI103 PHASING

ARCHITECTURAL

AE100 EXISTING FLOOR PLANS

AE101 EXISTING FLOOR PLANS

AD100 DEMOLITION AND TEMPORARY FLOOR PLANS

AD101 DEMOLITION AND TEMPORARY FLOOR PLANS

AP100 NEW FLOOR PLANS

AP101 NEW FLOOR PLANS

AP102 SCHEDULES AND DETAILS

PLUMBING

PL001 PLUMBING COVER SHEET

PD101 PLUMBING DEMOLITION PLANS SUB-BASEMENT TO FIFTH FLOOR

PD102 PLUMBING DEMOLITION PLANS SIXTH TO TWELFTH FLOOR

PL101 PLUMBING PLANS SUB-BASEMENT TO FIFTH FLOOR

PL102 PLUMBING PLANS SIXTH TO TWELFTH FLOOR

MP101 MECHANICAL PIPING PLANS - SUB-BASEMENT TO FIFTH FLOOR

MP102 MECHANICAL PIPING PLANS - SIXTH TO TWELFTH FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

ARCHITECTURAL ABBREVIATIONS

GI101

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS

ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADB AUTOMATIC DOOR BOTTOM

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADO AUTOMATIC DOOR OPERATOR

AF ACCESS FLOORING

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AT (SP) ACOUSTICAL CEILING (WITH

SPRAYED PLASTIC FINISH)

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BIM BUILDING INFORMATION MODEL

BITUM BITUMINOUS

BK BRICK

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS OR CHANNEL

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM² SQUARE CENTIMETER

CM³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE

OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE OR CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CP CARPET (WITHOUT CUSHION

BROADLOOM)

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET TILE

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SINK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER OR CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCHES

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL OR DIAGRAM

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DN DOWN

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM,

OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EPY EPOXY FLOORING

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDIM FINISH DIMENSION

FDTN FOUNDATION

FDVB FIRE DEPARTMENT VALVE BOX

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FIG FIGURE

FIL FILLET

FIN FINISH OR FINISHED

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISH OPENING

FOC FACE OF CONCRETE OR FACE OF

CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAUGE OR GYPSUM

ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS (GLAZING)

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GWB GYPSUM WALLBOARD SYSTEMS

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER OR HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH OR

HORIZONTAL IN SPLASH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ICU INTENSIVE CARE UNIT ID

IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE

ASSEMBLY

ITC INSTALLED THIS CONTRACT

IWH INSTANTANEOUS WATER HEATER

J JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

KS KNEE SPACE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LH LEFT HAND

LHR LEFT HAND REVERSE OR LATENT

HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL OR MEDIUM

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM OR MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MM MILLIMETER

MO MASONRY OPENING OR

MOTOR OPERATED

MOD MODEL, MODIFY, OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NON-REMOVABLE

NS NARROW STILE

NTS NOT TO SCALE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE

DIMENSION

OF/CI OWNER

FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDINANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PD PLAN DIMENSION

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE OR PURCHASE

ORDER

POLY POLYETHYLENE (PLASTIC)

PORCT PORCELAIN TILE

PR PAIR

PRB PROFILE BASE

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RAF RESILIENT ATHLETIC FLOORING

RB RESILIENT BASE (RUBBER OR

VINYL WITH FACTORY FORMED

INSIDE AND OUTSIDE CORNERS)

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY OR REFRIGERATION

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS/EPOXY WALL/CEILING

RESIL RESILIENT

RET RETURN

REV REVISE OR REVISION

RF RADIO FREQUENCY OR RUBBER

FLOORING

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RSF RESILIENT SHEET FLOORING

(CHEMICALLY WELDED SEAMS)

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

S SOLID SURFACE

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE OR HIGH BUILD GLAZED

COATING (SPECIAL COATING)

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR OR SOAP DISPENSER

OR STATIC DISSIPATIVE

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL FLASHING

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SP SPECIAL FACED

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE

SINK

SST STAINLESS STEEL

ST STAIRS OR STREET OR STONE

(CAST)

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SVT SOLID VINYL FLOOR TILE (LUXURY

VINYL TILE)

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL

TEMPERATURE OR TRAFFIC

CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO, POURED

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ____

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE

STEEL

TSTAT THERMOSTAT

TT TERRAZZO TILE (PLASTIC MATRIX)

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD NDERCUT DOOR

UCR UNDER COUNTER REFRIGERATOR

UCT UNDER COUNTER

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITE TILE OR

VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER

CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WSF WELDED SEAM SHEET FLOORING

(HEAT WELDED WITH ROD)

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE

BOARD (INSULATION)

YD YARD

YR YEAR

ARCHITECTURAL ABBREVIATIONS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

SYMBOLS, LIFE SAFETY, AND

PROJECT GENERAL NOTES

GI102

FIRE PROTECTION SYSTEMS

SUMMARY

AUTOMATIC SPRINKLER SYSTEM (IBC 903): YES (EXSTING, MODIFY AS REQUIRED)

STANDPIPE SYSTEM (IBC 905): YES (EXISTING, MODIFY AS REQUIRED)

PORTABLE FIRE EXTINGUISHERS (IBC 906): YES

GROUP 'I-1' - INSTITUTIONAL (IBC 308.3)

OCCUPANCY CLASSIFICATION

REFERENCED BUILDING CODES

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL PLUMBING CODE

2015 INTERNATIONAL MECHANICAL CODE

2014 NATIONAL ELECTRICAL CODE

2003 INTERNATIONAL EXISTING BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

TYPE II-B CONSTRUCTION (IBC 602.2)

CONSTRUCTION TYPE

FIRE ALARM SYSTEM (IBC 907): YES (EXISTING, MODIFY AS REQ'D.)

SMOKE CONTROL SYSTEM (IBC 909): N/A

SHAFT ENCLOSURES

SECTION 713 SHAFT ENCLOSURES

713.4 FIRE-RESITANCE RATING: SHAFT ENCLOSURES SHALL HAVE A

FIRE-RESITANCE RATING OF NOT LESS THAN 2 HOURS WHERE CONNECTING

FOUR STORIES OR MORE.

SECTION 707 FIRE BARRIERS

707.5 CONTINUITY: FIRE BARRIERS SHALL EXTEND FROM THE TOP OF THE

FOUNDATION OR FLOOR/CEILING ASSEMBLY BELOW TO THE UNDERSIDE OF THE

FLOOR OR ROOF SHEATHING, SLAB OR DECK ABOVE SHALL BE SECURELY

ATTACHED THERETO. SUCH FIRE BARRIERS SHALL BE CONTINUOUS THROUGH

CONCEALED SPACE, SUCH AS THE SPACE ABOVE A SUSPENDED CEILING.

CONTRACT LIMIT LINE

FIRE RESISTIVE RATED LINE, 4 HOUR

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

DOOR TAG

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

ARCHITECTURAL SYMBOLS

CENTER LINE

FURNITURE, FIXTURE, TOILET ACCESSORY & EQUIPMENT INDICATOR

GRAPHIC SCALE,

"=1'-0"

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

AP###

AP###

A

BC

D

AP###

A-512

D2

AP###

AP###

1HR 1HR 1HR 1HR

2HR 2HR 2HR 2HR

3HR 3HR 3HR 3HR

4HR 4HR 4HR 4HR

ROOM NAME AND NUMBER

FEC

CG

COLUMN GRID

SHEET KEYNOTE

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

EXISTING CONSTRUCTION TO

REMAIN

EXISTING CONSTRUCTION TO

BE REMOVED

NEW CONSTRUCTION

CONCRETE

EARTH

RIGID

INSULATION

BATT

INSULATION

V V ITEM - VA SUPPLIED & INSTALLED

VC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED & INSTALLED

AP###

BUILDING SECTION INDICATOR

NEW METAL STUD WALLNEW MASONRY

#/AP###

WINDOW TAG

1HR SMOKE 1HR SMOKE

2HR SMOKE 2HR SMOKE

3HR SMOKE 3HR SMOKE

4HR SMOKE 4HR SMOKE

SMOKE SMOKE

1 1/4"

A

DEMOLITION KEYNOTE

WAYFINDING TAG

PLAN

NORTH

DRAWING TITLE

SCALE:

PLAN

NORTH

16' 32' 64'

1/64" = 1'-0"

2' 4' 8'

1/8" = 1'-0"

CLASS II INFECTION CONTROL NOTES:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE TACKY MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. WIPE WORK SURFACES WITH DISINFECTANT

7. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS

8. WET MOP AND/OR VACUUM WITH FILTERED VACUUM BEFORE LEAVING WORK AREA.

PROJECT GENERAL NOTES:

USE OF CONSTRUCTION DOCUMENTS:

1. CONTRACTOR SHALL NOT SCALE DRAWINGS. ONLY WRITTEN DIMENSIONS OR KEYED

NOTES SHALL BE USED. CONTACT ARCHITECT IF CLARIFICATION OR ADDITIONAL

INFORMATION IS REQUIRED.

2. DIMENSIONS OF LARGER SCALE DRAWINGS SHALL GOVERN OVER DIMENSIONS OF

SMALLER SCALE DRAWINGS.

3. DRAWINGS SHALL NOT BE REPRODUCED FOR SUBMITTALS. DRAWINGS OR PORTIONS OF

DRAWINGS USED FOR SUBMITTALS WILL BE REJECTED AND RETURNED TO CONTRACTOR.

4. DIMENSIONS ARE AS FOLLOWS UNLESS NOTED OTHERWISE:

A. FACE OF STUD

B. TO CENTERLINE OF COLUMNS, PARTY WALL, WINDOWS, AND DOORS.

C. TO TOP OF STRUCTURAL DECK.

D. TO BOTTOM OF FINISHED CEILING.

5. ALL FURNITURE, FIXTURES, AND EQUIPMENT SHOWN DASHED IS FOR REFERENCE ONLY

AND IS NOT IN THE CONTRACT.

6. ALL ITEMS DESIGNATED FOR THE USE BY THE HANDICAPPED SHALL FULLY COMPLY WITH

THE CURRENT REQUIREMENTS OF APPLICABLE GOVERNING ACCESSIBILITY CODES AND

REGULATIONS.

8. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE

WORK, DETAILING SHALL BE THE SAME AS FOR OTHER SIMILAR FIRST CLASS WORK FOR

THE TRADE INVOLVED. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY

ALTERNATE NON-STANDARD OR UNTESTED METHOD(S) PROPOSED.

STANDARDS AND REGULATIONS:

1. CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH APPLICABLE BUILDING

CODES. REGULATIONS, ORDINANCES, UTILITY PROVIDER REQUIREMENTS AND SIMILAR

STANDARDS.

2. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND SIMILAR RELEASES REQUIRED

FOR CONSTRUCTION AND OCCUPANCY. CONTRACTOR SHALL FURNISH ALL COPIES OF

SUCH ITEMS TO OWNER AND ARCHITECT WITHIN 10 DAYS OF RECEIPT. IF PERMITS ARE

ISSUED SUBJECT TO CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR PERMITS ARE

DELAYED FOR ANY REASON, CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.

3. CONTRACTOR SHALL OBTAIN ALL REQUIRED INSPECTIONS OF THE WORK. CONTRACTOR

SHALL REGULARLY UPDATE OWNER AND ARCHITECT REGARDING THE STATUS OF THE

INSPECTIONS.

4. CONTRACTOR SHALL COORDINATE WORK WITH APPLICABLE UTILITY COMPANIES.

5. CONTRACTOR SHALL BE FAMILIAR WITH AND WORK SHALL BE IN COMPLIANCE WITH

REFERENCED FIRE-RATED ASSEMBLY TESTS AND STANDARDS.

PERFORMANCE OF THE WORK:

1. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS, AND

SEQUENCES OF CONSTRUCTION.

2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE SAFETY OF ALL CONSTRUCTION

PERSONNEL AND AUTHORIZED VISITORS.

3. CONTRACTOR SHALL BECOME FULLY ACQUAINTED WITH THE CONDITIONS RELATED TO THE

WORK. ANY KNOWN DISCREPANCIES BETWEEN THE DOCUMENTS AND ACTUAL CONDITIONS

SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH

WORK RELATED TO THE DISCREPANCY.

4. ALL CONSTRUCTION FABRICATION AND INSTALLATIONS SHALL CONFORM TO THE

REQUIREMENTS OF THE LATEST EDITIONS OF THE APPLICABLE BUILDING,

MECHANICAL-PLUMBING CODES, THE NATIONAL ELECTRICAL CODE, ANY FEDERAL, STATE,

AND LOCAL CODE REGULATIONS AND ORDINANCES EACH AS AMENDED BY THE GOVERNING

JURISDICTION HAVING AUTHORITY.

5. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES BETWEEN

THESE DOCUMENTS AND ANY APPLICABLE CODES BY THE AGENT INVOLVED WITH THE

GOVERNING AGENCY HAVING JURISDICTION. IT IS UNDERSTOOD THAT THE "FIELD

INSPECTOR" FOR SUCH AGENCY HAS FINAL AUTHORITY TO APPROVE/DISAPPROVE

PROJECT CONSTRUCTION AND CORRECTNESS OF ALL CODE RELATED ITEMS.

6. CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION AND

DEMOLITION DEBRIS. CONTRACTOR SHALL OBTAIN APPROVAL OF OWNER (AND GOVERNING

AUTHORITIES, IF APPLICABLE) FOR DETAILS RELATED TO REMOVAL OF TRASH, INCLUDING

SUCH ISSUES AS PATH OF TRAVEL.

7. CONTRACTOR SHALL BECOME FAMILIAR WITH AND COMPLY WITH OWNER'S PROCEDURES

FOR MAINTAINING A SECURE SITE AND BUILDING.

8. EACH INSTALLER SHALL EXAMINE SUBSTRATE CONDITION AND/OR SITE CONDITIONS WHICH

AFFECT THE QUALITY OF EACH PRODUCT TO BE INSTALLED. IF ANY CONDITIONS EXIST

WHICH WILL HAVE A DETRIMENTAL EFFECT ON THE QUALITY OF THE INSTALLATION, THE

INSTALLER SHALL IMMEDIATELY NOTIFY THE CONTRACTOR. INSTALLATION SHALL NOT

PROCEED UNTIL THE UNSATISFACTORY CONDITIONS ARE CORRECTED. INSTALLATION

SHALL SIGNIFY ACCEPTANCE OF THE CONDITIONS.

9. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS ON SITE AT ALL TIMES.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING COORDINATION EFFORTS OF ALL

SUBCONTRACTORS.

11. CONTRACTOR SHALL NOT CLOSE UP CEILING UNTIL ARCHITECT HAS AN OPPORTUNITY TO

INSPECT ALL WORK WHICH WILL BE CONCEALED BY CEILING. CONTRACTOR SHALL NOTIFY

ARCHITECT AT LEAST TWO WEEKS PRIOR TO CLOSE-UP.

DEFINITIONS:

1. THE TERM "ALIGN" SHALL MEAN TO ACCURATELY LOCATE AND FINISH FACES IN THE SAME

PLANE AND/OR INSTALL NEW CONSTRUCTION ADJACENT TO EXISTING CONSTRUCTION

WITHOUT ANY VISIBLE JOINTS OR SURFACE IRREGULARITES.

2. THE TERM "CLEAR" SHALL MEAN THAT THE CONDITION IS NOT ADJUSTABLE WITHOUT THE

APPROVAL OF THE ARCHITECT, CLEAR DIMENSIONS ARE TYPICALLY TO FINISH FACE.

3. THE TERMS "MAXIMUM" OR "MAX" SHALL MEAN THAT THE CONDITION IS SLIGHTLY

ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR QUANTITY GREATER THAN THAT

SHOWN WITHOUT APPROVAL OF THE ARCHITECT.

4. THE TERMS "MINIMUM" OR "MIN" SHALL MEAN THAT THE CONDITIONS IS SLIGHTLY

ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR QUANTITY LESS THAN THAT SHOWN

WITHOUT APPROVAL OF THE ARCHITECT.

5. THE TERM "TYPICAL" SHALL MEAN THAT THE CONDITION OR DIMENSION IS THE SAME OR

REPRESENTATIVE FOR SIMILAR CONDITIONS THROUGHOUT.

6. THE TERM "+/-" SHALL MEAN THAT THE DIMENSION OR QUANTITY IS SLIGHTLY ADJUSTABLE

TO ACCOMODATE ACTUAL CONDITIONS.

GENERAL PHASING NOTES:

1. COORDINATE ALL UTILITY OUTAGES WITH THE OWNER AND STAFF A MINIMUM OF

72 HOURS IN ADVANCE.

2. MAINTAIN AIR-TIGHT SEAL BETWEEN OCCUPIED AND CONSTRUCTION SPACES.

3. EXTERIOR OF BUILDING MUST BE LEFT SECURE WHEN CONSTRUCTION WORKERS

ARE NOT PRESENT.

4. MAINTAIN A MINIMUM OF 5' CLEAR WIDTH IN CORRIDORS.

5. LOCATE CONSTRUCTION BARRICADES SO THAT THERE IS NO PATIENT/

CONSTRUCTION WORKER CONTACT.

6. COORDINATE WITH OWNER AND STAFF WHEN OPERATIONS WILL TAKE PLACE

WHICH INVOLVE DISRUPTIVE NOISE LEVELS - SUCH AS JACK HAMMERS, PIER

DRILLING, MASONRY SAWS, CONCRETE DRILLING, SCREW GUNS, ETC.

A

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C101

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

MATERIALS LEGEND

3. CONNECT SHUT OFF VALVE

TO NEW 12TH AND 11TH

FLOOR RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH AND

REMOVE

EXISTING 12TH

AND 11TH

FLOOR RISER.

1. INSTALL NEW

12TH AND

11TH FLOOR

RISER.

TENTH FLOOR

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH

AND REMOVE

EXISTING

10TH AND 9TH

FLOOR RISER.

1. INSTALL NEW

10TH AND 9TH

FLOOR RISER.

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

TENTH FLOOR

ELEVENTH FLOOR

TWELFTH FLOOR

ROOF

NINTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

SIXTH FLOOR

FOURTH FLOOR

FIFTH FLOOR

THIRD FLOOR

FIRST FLOOR

SECOND FLOOR

BASEMENT

SUB-BASEMENT

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH

AND REMOVE

EXISTING 8TH

AND 7TH

FLOOR RISER.

1. INSTALL NEW

8TH AND 7TH

FLOOR RISER.

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH

AND REMOVE

EXISTING 6TH

AND 5TH

FLOOR RISER.

1. INSTALL NEW

6TH AND 5TH

FLOOR RISER.

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH

AND REMOVE

EXISTING 4TH

AND 3RD

FLOOR RISER.

1. INSTALL NEW

4TH AND 3RD

FLOOR RISER.

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH

AND REMOVE

EXISTING 2ND

AND 1ST

FLOOR RISER.

1. INSTALL NEW

2ND AND 1ST

FLOOR RISER.

3. CONNECT SHUT OFF

VALVE TO NEW RISER, AND

SUPPRESSION SYSTEM,

TEST AND RE-FILL.

4. DEMOLISH AND

REMOVE EXISTING

BASEMENT AND

SUB-BASEMENT

RISER.

1. INSTALL NEW

BASEMENT AND

SUB-BASEMENT

RISER.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

2. DRAIN ENTIRE

EXISTING RISER,

INSTALL SHUT

OFF VALVE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

PHASING

GI103

PHASE 1

12TH AND 11TH FLOOR

SCALE: N.T.S.

PHASE 2

10TH AND 9TH FLOOR

SCALE: N.T.S.

PHASE 3

8TH AND 7TH FLOOR

SCALE: N.T.S.

PHASE 4

6TH AND 5TH FLOOR

SCALE: N.T.S.

PHASE 5

4TH AND 3RD FLOOR

SCALE: N.T.S.

PHASE 6

2ND AND 1ST FLOOR

SCALE: N.T.S.

PHASE 7

BASEMENT AND SUB-BASEMENT

SCALE: N.T.S.

STORAGE

S-B-3

ENGINEERING

SERVICE

2B

CENTRAL

CHASE

ENGINEERING

SERVICE

S-B-2

ENGINEERING

SERVICE

S-B-7

FLUE

1 2

CENTRAL

CHASE

ENGINEERING

B-N-34

SPD

BE-24

SPD

B-E-27

FLUE

1 2

A

B

DF

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

1-W-28

1 2

A

B

CENTRAL

CHASE

CORRIDOR

4-W-61

ELEVATOR

LOBBY

4-W-57

MECHANICAL/

ELECTRICAL

4-W-57A

DF

FLUE

1 2

A

B

CENTRAL

CHASE

CORRIDOR

3-W-77

ELEVATOR

LOBBY

3-W-71

MECHANICAL/

ELECTRICAL

3-W-71A

DF

FLUE

1 2

CENTRAL

CHASE CORRIDOR

2-W-3

ELEVATOR

LOBBY

2-W-37

MECHANICAL/

ELECTRICAL

37A

DF

FLUE

1 2

A

B

CENTRAL

CHASE CORRIDOR

5-W-56

ELEVATOR

LOBBY

5-W-53

MECHANICAL/

ELECTRICAL

53A

DF

FLUE

1 2

A

B

EXISTING FLOOR PLAN

KEYNOTES

1. FIRE CONTROL VALVE

2. FIRE RISER

3. ABATEMENT PIPES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

EXISTING FLOOR PLANS

AE100

PLAN

NORTH

EXISTING FIRST FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING SUB-BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING FOURTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING THIRD FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING SECOND FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING FIFTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0 1' 2'

1/4" = 1'-0"

4'0 1' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0

CORRIDOR

6-W-56

CENTRAL

CHASE

ELEVATOR

LOBBY

6-W-53

MECHANICAL/

ELECTRICAL

53A

DF

FLUE

1 2

A

B

CENTRAL

CHASE

CORRIDOR

7-W-56

ELEVATOR

LOBBY

7-W-53

MECHANICAL/

ELECTRICAL

53A

DF

FLUE

1 2

A

B

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

8-W-58

MECHANICAL/

ELECTRICAL

58A

DF

FLUE

1 2

A

B

CENTRAL

CHASE

ELEVATOR

LOBBY

11C1

FLUE

1 2

A

B

OFFICE

10W-5

ENGINEERING

SERVICES

10W-3A

ELEVATOR

LOBBY

10W-3

CORRIDOR

10W-3B

CENTRAL

CHASE

FLUE

1 2

A

B

CENTRAL

CHASE

CORRIDOR

9W-13B

ELEVATOR

LOBBY

9W-12

MECHANICAL/

ELECTRICAL

9W-11

WAITING

9W-18

DF

FLUE

1 2

A

B

CENTRAL

CHASE

BELOW

12C1

FLUE

NO ARCHITECTURAL

SCOPE OF WORK

1 2

A

B

CENTRAL CHASE

EXISTING WALLS

BELOW SLAB

EXISTING FLOOR PLAN

KEYNOTES

1. FIRE CONTROL VALVE

2. FIRE RISER

3. ABATEMENT PIPES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

EXISTING FLOOR PLANS

AE101

PLAN

NORTH

EXISTING EIGHTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING SEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING SIXTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING ELEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING TENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING NINTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

EXISTING TWELFTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

STORAGE

S-B-3

ENGINEERING

SERVICE

2B

CENTRAL

CHASE

ENGINEERING

SERVICE

S-B-2

ENGINEERING

SERVICE

S-B-7

6 (2

X6

4'-9"

TEMPORARY

ANTE-ROOM

1 2

A

B

CENTRAL

CHASE

ENGINEERING

B-N-34

SPD

BE-24

SPD

B-E-27

1 2

12'-0"

3'-4"

6(2

X 6

TEMPORARY

ANTE-ROOM

1 2

A

B

3'-0"

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

3'-0" 5'-0"

DF

14 TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

3'-0" 5'-0"

DF

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

3'-0" 5'-0"

DF

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

3'-0" 5'-0"

6 (2

X6

DF

TEMPORARY

ANTE-ROOM

1 2

A

B

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

3'-0" 5'-0"

DF

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

DEMOLITION FLOOR

PLAN KEYNOTES

1. DEMOLISH AND REMOVE EXISTING

WALL.

2. DEMOLISH AND REMOVE EXISTING

DOOR AND FRAME.

3. REMOVE EXISTING DRINKING

FOUNTAIN, AND RETURN TO VA.

STORE DRINKING FOUNTAINS FROM

3RD AND 6TH FLOORS FOR

REINSTALLATION.

4. 2 HOUR FIRE BARRIER TEMPORARY

PARTITION, 3-5/8" METAL STUD AT 16"

O.C. WITH 2 LAYERS 5/8" GYPSUM

WALL BOARD EACH SIDE. TAPE, BED,

AND PAINT TO MATCH VA COLOR

SELECTION IN SPECIFICATIONS. SEAL

THE BOTTOM TRACK WITH SILICONE

TO THE EXISTING FLOORING

MATERIAL. REFER 4,5/AP102.

5. 2 HOUR FIRE BARRIER TEMPORARY

PARTITION, 2 1/2" CT SHAFTWALL STUD

24" O.C. WITH 1" SHAFTWALL GYPSUM

WALL BOARD LINER PANEL, AND 2

LAYERS OF 5/8" GYPSUM WALL BOARD.

TAPE, BED, AND PAINT TO MATCH VA

COLOR SELECTION IN

SPECIFICATIONS. SEAL THE BOTTOM

TRACK WITH SILICONE TO THE

EXISTING FLOORING MATERIAL. REFER

4,5/AP102.

6. TEMPORARY DOOR AND FRAME, WITH

90 MINUTE LABEL. DOOR SIZE

INDICATED IN PARENTHESIS (3

X7

COORDINATE WITH COR FOR

SECURITY AND DOOR HARDWARE

REQUIREMENTS. CONTRACTOR TO

PROVIDE DOOR HARDWARE,

INCLUDING CYLINDERS WITH 7 PIN

EMPTY CORE THAT THE VA WILL

PROVIDE KEYS TO.

7. DEMOLISH AND REMOVE EXISTING

FIRE CONTROL VALVE, REFER FIRE

PROTECTION PLANS.

8. DEMOLISH AND REMOVE EXISTING

ACCESS PANEL.

9. REMOVE DOORS AND STORE FOR

REINSTALLATION.

10. REMOVE, AND STORE FOR

REINSTALLATION, ANY EXISTING

MISCELLANEOUS CEILING AND WALL

FIXTURES, INCLUDING BUT NOT

LIMITED TO LIGHT FIXTURES, CORNER

GUARDS, WALL PROTECTION PANELS,

HAND RAILS, AND SIGNAGE.

11. DEMOLISH AND REMOVE EXISTING

FIRE RISER MAIN, REFER FIRE

PROTECTION PLANS.

12. ABATEMENT PIPES, REFER ASBESTOS

ABATEMENT PLANS.

13. DEMOLISH AND REMOVE ABANDONED

DUCT.

14. DEMOLISH AND REMOVE BRICK FLUE

FROM SUB-BASEMENT THROUGH 11TH

FLOOR ACCORDING TO PHASING,

LEAVING INTACT AT 12TH FLOOR AND

ABOVE. REFER STRUCTURAL.

DEMOLITION FLOOR PLAN

SYMBOLS LEGEND

EXISTING ELEMENT

DEMOLITION ELEMENT

NEW ELEMENT

DEMOLITION FLOOR PLAN

GENERAL NOTES

1. THE CENTRAL CHASE CONTAINS

NUMEROUS PIPES, CONDUIT, DUCTS,

AND OTHER EQUIPMENT. ONLY

ELEMENTS BEING MODIFIED ARE

IDENTIFIED ON THIS PROJECT.

2. CONTRACTOR TO LOCATE AND VERIFY

EACH ELEMENT TO BE MODIFIED, ITS

SOURCE AND DESTINATION TO

ENSURE AFFECTED SYSTEMS ARE

ONLY ASSOCIATED WITH THE WORK

AND SCOPE OF THIS PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

DEMOLITION AND TEMPORARY

FLOOR PLANS

AD100

PLAN

NORTH

DEMOLITION AND TEMPORARY

FIRST FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

SUB-BASEMENT FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

FOURTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

THIRD FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

SECOND FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

FIFTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0 1' 2'

1/4" = 1'-0"

4'0 1' 2'

1/4" = 1'-0"

4'0

1' 2'

CENTRAL

CHASE

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

DF

3'-0" 5'-0"

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

DF

3'-0" 5'-0"

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

DF

3'-0" 5'-0"

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

ELEVATOR

LOBBY

11C1

3'-4"

6 (3

X6

10'-0"

TEMPORARY

ANTE-ROOM

1 2

A

B

OFFICE

10W-5

ENGINEERING

SERVICES

10W-3A

ELEVATOR

LOBBY

10W-3

CORRIDOR

10W-3B

CENTRAL

CHASE

6 (3

X6

14 TEMPORARY

ANTE-ROOM

1 2

A

B

CENTRAL

CHASE

CORRIDOR

9W-13B

ELEVATOR

LOBBY

9W-12

MECHANICAL/

ELECTRICAL

9W-11

WAITING

9W-18

DF

3'-0" 5'-0"

TEMPORARY

ANTE-ROOM

1 2

A

B

6 (2

X6

CENTRAL

CHASE

BELOW

12C1

FLUE

NO ARCHITECTURAL

SCOPE OF WORK

1 2

A

B

CENTRAL CHASE

EXISTING WALLS

BELOW SLAB

DEMOLITION FLOOR

PLAN KEYNOTES

1. DEMOLISH AND REMOVE EXISTING

WALL.

2. DEMOLISH AND REMOVE EXISTING

DOOR AND FRAME.

3. REMOVE EXISTING DRINKING

FOUNTAIN, AND RETURN TO VA.

STORE DRINKING FOUNTAINS FROM

3RD AND 6TH FLOORS FOR

REINSTALLATION.

4. 2 HOUR FIRE BARRIER TEMPORARY

PARTITION, 3-5/8" METAL STUD AT 16"

O.C. WITH 2 LAYERS 5/8" GYPSUM

WALL BOARD EACH SIDE. TAPE, BED,

AND PAINT TO MATCH VA COLOR

SELECTION IN SPECIFICATIONS. SEAL

THE BOTTOM TRACK WITH SILICONE

TO THE EXISTING FLOORING

MATERIAL. REFER 4,5/AP102.

5. 2 HOUR FIRE BARRIER TEMPORARY

PARTITION, 2 1/2" CT SHAFTWALL STUD

24" O.C. WITH 1" SHAFTWALL GYPSUM

WALL BOARD LINER PANEL, AND 2

LAYERS OF 5/8" GYPSUM WALL BOARD.

TAPE, BED, AND PAINT TO MATCH VA

COLOR SELECTION IN

SPECIFICATIONS. SEAL THE BOTTOM

TRACK WITH SILICONE TO THE

EXISTING FLOORING MATERIAL. REFER

4,5/AP102.

6. TEMPORARY DOOR AND FRAME, WITH

90 MINUTE LABEL. DOOR SIZE

INDICATED IN PARENTHESIS (3

X7

COORDINATE WITH COR FOR

SECURITY AND DOOR HARDWARE

REQUIREMENTS. CONTRACTOR TO

PROVIDE DOOR HARDWARE,

INCLUDING CYLINDERS WITH 7 PIN

EMPTY CORE THAT THE VA WILL

PROVIDE KEYS TO.

7. DEMOLISH AND REMOVE EXISTING

FIRE CONTROL VALVE, REFER FIRE

PROTECTION PLANS.

8. DEMOLISH AND REMOVE EXISTING

ACCESS PANEL.

9. REMOVE DOORS AND STORE FOR

REINSTALLATION.

10. REMOVE, AND STORE FOR

REINSTALLATION, ANY EXISTING

MISCELLANEOUS CEILING AND WALL

FIXTURES, INCLUDING BUT NOT

LIMITED TO LIGHT FIXTURES, CORNER

GUARDS, WALL PROTECTION PANELS,

HAND RAILS, AND SIGNAGE.

11. DEMOLISH AND REMOVE EXISTING

FIRE RISER MAIN, REFER FIRE

PROTECTION PLANS.

12. ABATEMENT PIPES, REFER ASBESTOS

ABATEMENT PLANS.

13. DEMOLISH AND REMOVE ABANDONED

DUCT.

14. DEMOLISH AND REMOVE BRICK FLUE

DEMOLITION FLOOR PLAN

GENERAL NOTES

1. THE CENTRAL CHASE CONTAINS

NUMEROUS PIPES, CONDUIT, DUCTS,

AND OTHER EQUIPMENT. ONLY

ELEMENTS BEING MODIFIED ARE

IDENTIFIED ON THIS PROJECT.

2. CONTRACTOR TO LOCATE AND VERIFY

EACH ELEMENT TO BE MODIFIED, ITS

SOURCE AND DESTINATION TO

ENSURE AFFECTED SYSTEMS ARE

ONLY ASSOCIATED WITH THE WORK

AND SCOPE OF THIS PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

DEMOLITION AND TEMPORARY

FLOOR PLANS

AD101

PLAN

NORTH

DEMOLITION AND TEMPORARY

EIGHTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

SEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

SIXTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

ELEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

TENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

NINTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DEMOLITION AND TEMPORARY

TWELFTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0 1' 2'

1/4" = 1'-0"

4'0

1' 2'

CENTRAL

CHASE

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

06B

06C

06A

1'-1"

CLR

DF

FIRE CONTROL

VALVE CLOSET

06D

1 2

A

B

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

07B

07C

07A

07D

1'-1"

CLR

FIRE CONTROL

VALVE CLOSET

07E

1 2

A

B

CENTRAL

CHASE

CORRIDOR

ELEVATOR

LOBBY

MECHANICAL/

ELECTRICAL

08B

08C

08A

1'-1"

CLR

FIRE CONTROL

VALVE CLOSET

08D

1 2

A

B

CENTRAL

CHASE

ELEVATOR

LOBBY

11C1

11A

11C

1 2

A

B

3'-8"

OFFICE

10W-5

ENGINEERING

SERVICES

10W-3A

ELEVATOR

LOBBY

10W-3

CORRIDOR

10W-3B

CENTRAL

CHASE

10B

10C

10A

1'-1"

CLR

FIRE CONTROL

VALVE CLOSET

10D

1 2

A

B

CENTRAL

CHASE

CORRIDOR

9W-13B

ELEVATOR

LOBBY

9W-12

MECHANICAL/

ELECTRICAL

9W-11

WAITING

9W-18

09B

09C

09A

1'-1"

CLR

FIRE CONTROL

VALVE CLOSET

09D

1 2

A

B

CENTRAL

CHASE

BELOW

12C1

1 2

A

B

FLUE

CENTRAL CHASE

EXISTING WALLS

BELOW SLAB

FLOOR PLAN

KEYNOTES

1. FIRE CONTROL VALVE

2. FIRE RISER

3. STEEL PLATFORM, REFER

STRUCTURAL

4. REINSTALL EXISTING DRINKING

FOUNTAIN

5. DIMENSION OF FUR OUT ON COLUMN

MAY VARY FROM FLOOR TO FLOOR.

AFTER DEMOLITION, CONTRACTOR TO

VERIFY ACTUAL DIMENSION AT EACH

FLOOR LEVEL AND CONFIRM NEW

SHAFTWALL AND FIRE CONTROL

VALVE CLOSET CAN FIT INTO EXISTING

SPACE.

6. STEP PLATFORM WITH RETRACTABLE

STEPS, REFER STRUCTURAL.

FLOOR PLANS

GENERAL NOTES

1. THE SHAFT ENCLOSURE SHALL HAVE

A FIRE RESISTANCE RATING OF 2

HOURS, AND SHALL BE CONTINUOUS

FROM TOP TO BOTTOM

2. PENETRATIONS OTHER THAN THOSE

NECESSARY FOR THE PURPOSE OF

THE SHAFT SHALL NOT BE PERMITTED

IN THE SHAFT ENCLOSURE.

3. CONDUIT AND PIPING REMOVED FROM

THE SHAFT ENCLOSURE SHALL BE

SEALED OFF WITH APPROVED FIRE

RESISTANCE RATED MATERIAL.

4. OPENINGS SHALL BE PROTECTED

WITH 90 MINUTE FIRE RATED DOOR

ASSEMBLIES, AND BE SELF CLOSING.

FLOOR PLAN

SYMBOLS LEGEND

PARTITION TYPE TAG

DOOR TAG

STAIR

# 3

ELEVATORS

ROOF

11C2

11C3

ELEVATORS

CENTRAL

CHASE

11C1

ROOF

ROOF

11B

AREA OF WORK

STAIR

# 3

12C1B

12C1

12C2

12C3

12C1A

12A

CENTRAL

CHASE

CENTRAL CHASE

EXISTING WALLS

BELOW SLAB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PRIME ARCHITECTS

212 N. CRAWFORD AVE.

NORMAN, OK. 73069

866-226-8071

GENE LAVASTIDA

OVERTON BROOKS,

ABATE CENTRAL CHASE,

REPLACE FIRE MAIN

SHREVEPORT, LA

667-18-111

Building 1 Project Director

05/8/2020 BJM DTCRevisions: Date:

ARCHIE LANHAM

CERTIFICATE OF AUTHORITY

NO. 02483

G

EN

E

T

A T E

OF OKLAHO

M

A

L I C

ENSED ARCH I TE

C

T

5/8/2020

NEW FLOOR PLANS

AP101

PLAN

NORTH

NEW SEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW SIXTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW TENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW NINTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW EIGHTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW ELEVENTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

NEW TWELFTH FLOOR PLAN

SCALE: 1/4" = 1'-0"

PLAN

NORTH

DIAGRAMTIC ELEVENTH FLOOR PLAN

SCALE: N.T.S.

PLAN

NORTH

DIAGRAMTIC TWELFTH FLOOR PLAN

SCALE: N.T.S.

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'01' 2'

1/4" = 1'-0"

4'0

1' 2'

1/4" = 1'-0"

4'0

1' 2'

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

1/4" = 1'-0"

1' 2' 4'0

2ND

FLOOR

B

A

/4

11' - 4"

L4X4X1/4, TYP

METAL GRATING

C4X5.4, TYP

NEW SHAFT

ACCESS

DOOR

EXISTING SHAFT

ACCESS DOOR

FOR BID PURPOSE ONLY

48 SQ FT OF DECK

36 FT OF CHANNEL

8 FT OF ANGLE

PROPPED

CANTILEVER

BRACKET

/S

E

3/SE103

5/SE103

4/SE103

B

A

/4

11' - 4"

L4X4X1/4, TYP

METAL GRATING

C4X5.4, TYP

NEW SHAFT

ACCESS

DOOR

EXISTING SHAFT

ACCESS DOOR

FOR BID PURPOSE ONLY

50 SQ FT OF DECK

52 FT OF CHANNEL

9 FT OF ANGLE

PROPPED

CANTILEVER

C4X5.4

PROPPED

CANTILEVER

BRACKET

3/SE103

/S

E

5/SE103

4/SE103

/S

E

B

A

11' - 4"

/4

L4X4X1/4, TYP

METAL GRATING

C4X5.4, TYP

PROPPED

CANTILEVER

BRACKET NEW SHAFT

ACCESS

DOOR

EXISTING SHAFT

ACCESS DOOR

FOR BID PURPOSE ONLY

26 SQ FT OF DECK

39 FT OF CHANNEL

6 FT OF ANGLE

4/SE103

/S

E

3/SE103

B

A

11' - 4"

/4

C4X5.4, TYP

METAL GRATING

PROPPED CANTILEVER

BRACKET

L4X4X1/4, TYP

NEW SHAFT

ACCESS

DOOR

EXISTING SHAFT

ACCESS DOOR

FOR BID PURPOSE ONLY

33 SQ FT OF DECK

36 FT OF CHANNEL

7 FT OF ANGLE

PROPPED

CANTILEVER

BRACKET

5/SE103

/S

E

3/SE103

4/SE103

B

A

11'…