P09-SOW Durham Fume Hoods rev1.docx

DOCX document 263 KB Posted

Attached to
J059--Semi Annual Chemical Fume Hoods, Bio Cabinets, Laminar Flow Certifications and Repairs
Solicitation number
36C24621Q1333
Issued by

About this file

This pre-solicitation notice is for semi-annual chemical fume hood, biological safety cabinet, and laminar flow certification services for the Durham Veterans Affairs Medical Center located in Durham, North Carolina. The contractor will provide preventative maintenance, repair, and certification for chemical fume hoods, biological safety cabinets, laminar flow devices, and assess primary environmental controls in associated spaces. Services will be for a base year plus four optional years. The applicable NAICS code is 811310 with a size standard of $8 million. Responses are due by email to the contracting officer by September 20, 2021.

View the file

Other files

File Type Posted
36C24621Q1333_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.3 PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

Semi-Annual Chemical Fume Hoods / Biological Cabinets / Laminar Flow, Testing, Certification and Repair Services

Hours of Operation: Services shall be performed during the VA normal business hours, 7:30 a.m. through 4:00 p.m., Monday through Friday, excluding Federal holidays, and any other day specifically declared by the President of the United States. Federal holidays are available at the Federal Holiday OPM Site. For working outside the “normal working hours” as defined in this contract, the vendor shall give 3-day notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. All work to be coordinated around an operational medical center as to minimize impact to patient care.

This Scope of Work is for One (1) base year and four (4) option years

Scope of Work: The contractor shall provide all labor, personnel, supervision, equipment, tools, and all materials necessary to perform preventive maintenance, repair and certification on the chemical fume hoods/biological safety cabinets and Laminar Flow devices and assess the Primary Environmental Controls for the associated spaces where aforementioned equipment is located in the Durham Veterans Affairs Health Care System. The frequency of the preventative maintenance and certification is semi-annual.

Testing Standards: All testing of biosafety cabinets to be performed in accordance with criteria established by the National Sanitation Foundation (NSF) International standard number # 49-2002e, Annex F, or the prevailing NSF standard at time of inspection. All fume hood testing to be performed in accordance with criteria established by ANSI/ASHRAE 110, or the prevailing standard at time of inspection. All testing of laminar flow units to be done in accordance with criteria established by IEST-RP-CC002.2, Federal Standard 209E, ISO 14644 and the OEM specifications. All testing of animal isolator racks/units to be performed in accordance with criteria established by IEST-RP-CC002.2, Federal Standard 209E and the OEM specifications. Hoods are to be certified semiannually. Primary Environmental Controls test to be performed per ANSI/AIHA Z9.5-2003 American National Standards for Laboratory Ventilation.

Preventive Maintenance Procedures: The contractor shall contact the COR for approval at least two weeks prior to their arrival with a list of the fume hoods and/or biological safety cabinets that are to be tested and certified so the COR can coordinate with the affected services. Contractor shall report to the COR upon arrival at the facility and inform COR of the fume hoods and/or biological safety cabinets that are to be tested and certified for the day. In the event of a fume hood failure, the contractor shall inform the COR who will then arrange for the repair of the exhaust system and the rescheduling of the fume hood testing and certification. Contractor shall be responsible for fume hood HEPA filter replacement as needed. Contractor shall decontaminate hoods as required prior to repair or filter replacement. The contractor shall be responsible for the proper operation and repairs of the sash, motor, belts, fan unit, electrical connections of each certifiable device where applicable. The contractor shall also insure proper calibration on existing primary environmental control monitoring devices.

Face Velocity Tests. Set hood to the designed opening sash position as follows:

Height: Height shall be based on the dimension from the bottom most part of the sash to the work surface located in a straight plane directly beneath the sash for vertical sashes, or the opening between horizontal tracks on horizontal sashes.

Width: Width shall be based in the interior dimensions of the design sash opening.

The average face velocity shall be determined by the method described in the ANSI/ASHRAE 110-1995 Method of Testing Performance of Laboratory Fume Hoods. Face velocity measurements shall be made by dividing the hood opening into equal area grids with sides measuring no more than 12 in. (30.5 cm). The tip of the probe shall be positioned in the plane of the sash opening and fixed (not handheld) at the approximate center of each grid. Grid measurements around the perimeter of the hood opening shall be made at approximately 6 in. (15.2 cm) from the top, bottom, and sides of the opening enclosure. The average face velocity shall be the average of the grid velocity measurements. Each grid velocity shall be the average of at least 10 measurements made over at least 10 seconds. The plane of the sash shall be located at the midpoint of the sash frame depth. Manufacturers specifications of each piece of equipment shall also be used for testing.

Face Velocity Measurement. A 1.0 ft2 imaginary grid pattern shall be formed by equally dividing the design hood opening into vertical and horizontal openings. Velocity readings shall be taken with a calibrated anemometer. For VAV hoods, measurements should be made at 25, 50, and 100% sash openings. A hood is considered certified when the average face velocity at the manufacturer recommended working sash height is between 80 – 120 feet per minute.

Routine performance tests shall be conducted in accordance with the SOW. A hood that is found to be operating with an average face velocity more than 10% below the designated average face velocity shall be labeled as OUT OF SERVICE and corrective actions shall be taken by VA Engineering staff to adjust and/or replace belts. Each hood shall be posted with a notice giving the date of the routine performance test, the measured average face velocity and initialed by the technician. If it is taken OUT OF SERVICE it shall be posted with an out-of-service notice.

Repair Procedures: Any necessary repairs performed during the inspections are to be included in the scope of work at additional charge. The scope of these repairs will be limited to repair or replacement of blower motors, motor speed controls and switches. All labor, travel and any decontamination necessary to perform a repair are to be included at additional charge. All germicidal and illumination lamps and filters are consumables and are specifically included in the scope of this contract. Blowers/fans external to the equipment, i.e. roof top exhaust fans, primary environmental controls are excluded from the coverage of the contract. The contractor will assist the COR with descriptions and part numbers for any filters found to require replacement. Any filters removed by the contractor must be properly decontaminated and disposed of in accordance to all applicable EPA regulations. The decontaminated filters shall be the responsibility of the contractor to dispose of and documentation of proper disposal shall be provided to the COR.

Personnel Qualifications: Before allowing employees to start work under the terms of this contract, the Contractor shall ensure that employees have the required qualifications and, if applicable, have the required current and valid professional certifications and licenses in compliance with federal, state, and local environmental requirements or laws. The NEBB/TABB/AABC Certified Professional has a responsibility to assure that technicians performing the work are properly trained and possess sufficient skills. The Contractor shall provide the CO and COR with information on the qualifications or certifications for employees and sub-Contractors. All service technicians performing under this service contract must be able to document/provide certificates of training for Original Equipment Manufacturer (OEM) service training received from The Baker Company, Nuaire, Labconco, Kewaunee Scientific and Germ Free. Licensed journeyman tradespersons shall be licensed for their respective trades in accordance with city, county, state or federal requirements. Contactor shall ensure all certificates; licenses and bonds are kept current and valid. All licenses and certifications shall be submitted to the CO and COR annually and any time as requested. Associated training, licensing and certifications’ expenses shall be borne by the Contractor.

Equipment Calibration: All fume hood performance testing instrumentation shall be inspected annually and maintained with a current annual certificate, traceable to the National Institute of Standards and Technology (NIST). The testing instrumentation report provided to the VA shall include the instrument type, manufacturer, model number, serial number, date of calibration, and Tracer Gas purity certification. Contractor shall also provide equipment certifications with this report.

Emergency Service/Repairs – Contractor must return calls for service within two-hours if requested by the COR and provided the service call is initiated within normal business hours of 7:30AM -4:00PM, M-F, excluding federal holidays. Emergency service/repairs performed outside of the SOW that are not covered in this contract and will be contracted for on a time & materials basis as needed/required. The contractor shall respond to emergency repair requests within 8-hours to restore equipment back to first-class operating condition. Contractor shall make allowances for revisits for clean room and hood certification due to failure to certify. Contractor shall schedule certification of the equipment once repairs have been completed.

DELIVERABLES: At the completion of each day’s testing, the contractor shall provide the COR written reports for the hoods that were inspected indicating whether the unit has been passed and certified or failed with description of the deficiencies noted.

Certifications: The contractor shall provide hard copy and electronic inspection reports to the COR as soon as practical or within 30-days of completion of the testing. Inspection placards/stickers will be affixed to the equipment as soon as an inspection/certification is completed. Certification of Compliance Test Reports will be provided for each Pharmacy IV Clean Room inspected. Contractor will maintain an electronic database of all test reports for not less than five years after the date of completion of the inspection. Service reports shall be signed by both service provider and COR at completion of work. An electronic version of same shall be sent to the COR. In addition, stickers shall be affixed to equipment indicating date certified and due date of next inspection.

The vendor’s employees shall not enter the work site without appropriate identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.

Execute work to interfere as little as possible with normal functioning of the hospital including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space.

No utility service such as water, gas, steam sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The vendor shall submit a request to interrupt any such services to COR, in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

VA reserves the right to stop work or shut down the project site and order the vendor’s employees off the premises in the event of a national or Durham VA emergency. The vendor may return to the site only with the written approval of the Contracting Officer.

Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR.

All Buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period.

The contractor shall maintain neat and orderly work areas and shall clean area of debris and rubbish daily and dispose of waste materials offsite per hospital policies. The contractor shall provide a dumpster if it is determined to be necessary, and shall work with the COR in advance for a spot-on site to establish the dumpster.

All work shall be performed in full accordance with applicable local and Federal regulations. All materials and installation shall conform to the recommendations of National Fire Protection Association (NFPA), plumbing and mechanical codes. No departures from specification requirements will be permitted without written approval. The Supplier shall use good safety practices while working. All hardware should be installed in such a manner to minimize damage and maximize patient and employee safety.

New work shall be installed and connected to existing work nearly, safely and professionally. Disturbed or damaged work shall be replaced or repaired to its prior conditions.

All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.

Where the Government determines that the vendor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled or remedial action performed as directed at no additional cost to the Government.

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

The contractor will not be allotted any parking permits for onsite parking. All vehicles must have a parking permit assigned by the COR for off-site parking located up to 4 blocks from the facility. If work is needed to be performed outside of normal working hours, the contractor will be responsible to checking in with the VA Police to request permission to park on site as designated by the VA Police.

ATTACHMENT

“A”

EQUIPMENT LIST

With EXAMPLE of

SUGGESTED SCHEDULE

Quantities and locations of equipment subject to change

FEBRUARY

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
14
215
* PLAS LABS/SCIENTIFIC
FIC-24-2/SP
26900
BSC
28013
14
111
Chemical Fume Hood
TBD
FH
8339
14
121
Chemical Fume Hood
TBD
FH
22278
14
B02
Chemical Fume Hood
TBD
FH
34866
14
117
* PLAS LABS/SCIENTIFIC
FIC-24-2/SP
27000
BSC
28104
1
E3008
ALC COLLEGEDALE
G3R11-6036
10-100388-7
FH
66110
1
E3006
LABCONCO
G3R11-6036
10-100388-6
FH
66112
1
E4004
ALC COLLEGEDALE
G3R11-6036
10-100388-15
FH
66114
1
E3016
ALC COLLEGEDALE
G3R11-6036
10-100388-10
FH
66113
1
E3016
Chemical Fume Hood
FH
66104
1
E4016
ALC COLLEGEDALE
G3R11-6036
10-100388-9
FH
66115

MARCH

BLDG
R00M
MFG
MODEL#
SERIAL#
TYPE
EE#
1
E1018
NUAIRE
NU408FM600
10185OT
BSC
19963
1
EG017
BAKER CO
VBM600
SG18929V
BSC
2105
1
E3014
NUAIRE
NU408FM400
72550W
BSC
17507
14
228
NUAIRE
NU-607-400
86911102203
BSC
34866
14
228
NUAIRE
NU-124-600
13712 SN
FH
23120
14
108
LAB PRODUCTS
59030
M129770701
BSC
47983
1
C10018
Chemical Fume Hood
FH
13436
1
F3157
Chemical Fume Hood
FH
16453
1
F3232
Chemical Fume Hood
FH
16455
1
F3236
Chemical Fume Hood
FH
16456
GVHCC**
1A134
Laminar Flow
LF
75191
GVHCC**
2C420
Laminar Flow
LF
75407
GVHCC**
2D100
Laminar Flow
LF
87735
GVHCC**
2D100
Laminar Flow
LF
87736

APRIL

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
F3179
HAMILTON IND
SAFEAIRE
FH
16453
1
F3205
HAMILTON IND
SAFEAIR II
FH
16454
1
F3177
BAKER CO
SG-250
SL44799V
BSC
19272
1
N3018
NUAIRE
NU425400
17725TY
BSC
19279
1
N3021
LABCONCO
Protector
FH
19280
1
N3018
NUAIRE
NU425400
17724TY
BSC
19282
1
N3018
NUAIRE
NU425400
17723TY
BSC
19283
1
F3183
AIR CLEAN SYSTEMS
AC648LFUVC
41435
BSC
47854
1
EG017
LABCONCO
LOGIC
091117518B
BSC
60835
1
E1010
ALC COLLEGEDALE
G3R11-6036
10-100388-1
FH
66106
1
E2006
ALC COLLEGEDALE
G3R11-6036
10-100388-18
FH
66107
1
E3016
ALC COLLEGEDALE
G3R11-6036
10-100388-10
FH
66113
1
E2008
ALC COLLEGEDALE
G3R11-6036
10-100388-47
FH
66116
1
F3168
BAKER CO
SG404
119235
BSC
88070
1
F3203
BAKER CO
SG400
SL43654V
BSC
16457
1
F3157
BAKER CO
SG400
SL43653V
BSC
16461
1
F3157
BAKER CO
SG400
SL43650V
BSC
16462
1
F3183
BAKER CO
SG600
SL43678V
BSC
16463

MAY

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
N3022
LABCONCO
PROTECTOR
FH
19276
1
N3020
LABCONCO
PROTECTOR
FH
19277
1
N3017
LABCONCO
PROTECTOR
FH
19278
1
N3019
LABCONCO
PROTECTOR
FH
19281
1
F3206
JEWETT
JGP4-1B
04K000445
FH
37527
1
F3206
JEWETT
JGP4-1B
04K000447
FH
37528
1
F3206
JEWETT
JGP4-1B
04K000446
FH
37529
1
E2016
Chemical Fume Hood
FH
66111
1
A5017
Laminar Flow
LF
11793
15
203
Laminar Flow
LF
20487

JUNE

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
E2016
BAKER CO
SG400
SL42862V
BSC
10568
1
F3185
BAKER CO
SG400
SL43651V
BSC
16458
1
F3176
BAKER CO
BSL-3
SL43679V
BSC
16459
1
A2007
BAKER CO
SG600
SL48214V
BSC
17508
1
E2016
BAKER CO
SG400
5L-41353
BSC
18494
1
E1006
BAKER CO
VBM600
SG11762V
BSC
21386
1
E1006
BAKER CO
VBM600
SG13658V
BSC
21387
1
F3183
LABCONCO
Logic+
121168356-C
BSC
76033
1
E1006
LABCONCO
4FT
10-100388-12
FH
66104
1
E1018
LABCONCO
4FT
10-100388-3
FH
66105
1
E2011
LABCONCO
4FT
10-100388-8
FH
66108
1
E2014
LABCONCO
4FT
10-100388-5
FH
66109
1
E2016
LABCONCO
4FT
10-100388-11
FH
66111
14
215
BAKER CO
SG-600
SL38333V
BSC
19300
14
215
NUAIRE
NU602400
62901
BSC
20089
14
117
BAKER CO
NCB6
SR10008V
BSC
22152
15
102
BAKER CO
SG-600
SL34479V
BSC
19288
15
215
BAKER CO
VBM600
SG23255V
BSC
25796
15
103
BAKER CO
SG-400
SL30357V
BSC
49290
15
415
BAKER CO
SG-403A
86883
BSC
82072
15
104
INDUSTRIAL SCIENTIFIC
SUPREME AIRE
104-15
FH
85115
15
313
HAMILTON IND
SAFEAIRE
313-15
FH
85127
15
523
HAMILTON IND
SAFEAIRE II
523-15
FH
85152
15
123
KEWAUNEE
SUPREME AIRE
145251
FH
80218

AUGUST

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
14
215
* PLAS LABS/SCIENTIFIC
FIC-24-2/SP
26900
BSC
28013
14
117
* PLAS LABS/SCIENTIFIC
FIC-24-2/SP
27000
BSC
28014
14
111
Chemical Fume Hood
TBD
FH
8339
14
121
Chemical Fume Hood
TBD
FH
22278
14
B02
Chemical Fume Hood
TBD
FH
34866
1
E3008
ALC COLLEGEDALE
G3R11-6036
10-100388-7
FH
66110
1
E4004
ALC COLLEGEDALE
G3R11-6036
10-100388-15
FH
66114
1
E3016
ALC COLLEGEDALE
G3R11-6036
10-100388-10
FH
66113
1
E3016
Chemical Fume Hood
FH
66104
1
E3006
LABCONCO
G3R11-6036
10-100388-6
FH
66112
1
E4015
ALC COLLEGEDALE
G3R11-6036
10-100388-9
FH
66115

SEPTEMBER

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
E1018
NUAIRE
NU408FM600
10185OT
BSC
19963
1
EG017
BAKER CO
VBM600
SG18929V
BSC
2105
1
E3014
NUAIRE
NU408FM400
72550W
BSC
17507
14
228
NUAIRE
NU-607-400
86911102203
BSC
34866
14
228
NUAIRE
NU-124-600
13712 SN
FH
23120
14
108
LAB PRODUCTS
59030
M129770701
BSC
47983
1
C10018
Chemical Fume Hood
FH
13436
1
F3157
Chemical Fume Hood
FH
16453
1
F3232
Chemical Fume Hood
FH
16455
1
F3236
Chemical Fume Hood
FH
16456
GVHCC**
1A134
Laminar Flow
LF
75191
GVHCC**
2C420
Laminar Flow
LF
75407
GVHCC**
2D100
Laminar Flow
LF
87735
GVHCC**
2D100
Laminar Flow
LF
87736

OCTOBER

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
F3179
HAMILTON IND
SAFEAIRE
FH
16453
1
F3205
HAMILTON IND
SAFEAIR II
FH
16454
1
F3177
BAKER CO
SG-250
SL44799V
BSC
19272
1
N3018
NUAIRE
NU425400
17725TY
BSC
19279
1
N3021
LABCONCO
Protector
FH
19280
1
N3018
NUAIRE
NU425400
17724TY
BSC
19282
1
N3018
NUAIRE
NU425400
17723TY
BSC
19283
1
F3183
AIR CLEAN SYSTEMS
AC648LFUVC
41435
BSC
47854
1
EG017
LABCONCO
LOGIC
091117518B
BSC
60835
1
E1010
ALC COLLEGEDALE
G3R11-6036
10-100388-1
FH
66106
1
E2006
ALC COLLEGEDALE
G3R11-6036
10-100388-18
FH
66107
1
E3016
ALC COLLEGEDALE
G3R11-6036
10-100388-10
FH
66113
1
E2008
ALC COLLEGEDALE
G3R11-6036
10-100388-47
FH
66116
1
F3168
BAKER CO
SG404
119235
BSC
88070
1
F3203
BAKER CO
SG400
SL43654V
BSC
16457
1
F3157
BAKER CO
SG400
SL43653V
BSC
16461
1
F3157
BAKER CO
SG400
SL43650V
BSC
16462
1
F3183
BAKER CO
SG600
SL43678V
BSC
16463

NOVEMBER

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
N3022
LABCONCO
PROTECTOR
FH
19276
1
N3020
LABCONCO
PROTECTOR
FH
19277
1
N3017
LABCONCO
PROTECTOR
FH
19278
1
N3019
LABCONCO
PROTECTOR
FH
19281
1
F3206
JEWETT
JGP4-1B
04K000445
FH
37527
1
F3206
JEWETT
JGP4-1B
04K000447
FH
37528
1
F3206
JEWETT
JGP4-1B
04K000446
FH
37529
1
E2016
Chemical Fume Hood
FH
66111
1
A5017
Laminar Flow
LF
11793
15
203
Laminar Flow
LF
20487

DECEMBER

BLDG
ROOM
MFG
MODEL#
SERIAL#
TYPE
EE#
1
E2016
BAKER CO
SG400
SL42862V
BSC
10568
1
F3185
BAKER CO
SG400
SL43651V
BSC
16458
1
F3176
BAKER CO
BSL-3
SL43679V
BSC
16459
1
A2007
BAKER CO
SG600
SL48214V
BSC
17508
1
E2016
BAKER CO
SG400
5L-41353
BSC
18494
1
E1006
BAKER CO
VBM600
SG11762V
BSC
21386
1
E1006
BAKER CO
VBM600
SG13658V
BSC
21387
1
F3183
LABCONCO
Logic+
121168356-C
BSC
76033
1
E1006
LABCONCO
4FT
10-100388-12
FH
66104
1
E1018
LABCONCO
4FT
10-100388-3
FH
66105
1
E2011
LABCONCO
4FT
10-100388-8
FH
66108
1
E2014
LABCONCO
4FT
10-100388-5
FH
66109
1
E2016
LABCONCO
4FT
10-100388-11
FH
66111
14
215
BAKER CO
SG-600
SL38333V
BSC
19300
14
215
NUAIRE
NU602400
62901
BSC
20089
14
117
BAKER CO
NCB6
SR10008V
BSC
22152
15
102
BAKER CO
SG-600
SL34479V
BSC
19288
15
215
BAKER CO
VBM600
SG23255V
BSC
25796
15
103
BAKER CO
SG-400
SL30357V
BSC
49290
15
415
BAKER CO
SG-403A
86883
BSC
82072
15
104
INDUSTRIAL SCIENTIFIC
SUPREME AIRE
104-15
FH
85115
15
313
HAMILTON IND
SAFEAIRE
313-15
FH
85127
15
523
HAMILTON IND
SAFEAIRE II
523-15
FH
85152
15
123
KEWAUNEE
SUPREME AIRE
145251
FH
80218

* Two (2) Chambers

** Greenville Health Care Campus, Greenville, NC 27834

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION1
1.2 SHUTDOWNS2
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR2
1.4 PROJECT SECURITY REQUIREMENTS2
1.5 ROOF AND VERTICAL WORKSAFETY5
1.6 FIRE SAFETY5
1.7 HAZARDOUS MATERIALS MANAGEMENT8
1.8 OPERATIONS AND STORAGE AREAS9
1.9 ALTERATIONS12
1.10 INFECTION PREVENTION MEASURES14
1.11 DISPOSAL AND RETENTION17
1.12 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS18
1.13 RESTORATION19
1.14 LAYOUT OF WORK20
1.15 USE OF ROADWAYS20
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT20
1.17 TEMPORARY USE OF EXISTING ELEVATORS22
1.18 TEMPORARY TOILETS22
1.19 AVAILABILITY AND USE OF UTILITY SERVICES23
1.20 TESTS24
1.21 INSTRUCTIONS25
1.22 RELOCATED EQUIPMENT and ITEMS26
1.23 HOURS OF WORK26
1.24 PARKING27
1.25 TUBERCULOSIS (TB) TESTING27
1.26 TOBACCO USE28
1.27 CONTRACTOR BADGES28
1.28 PROJECT QUALITY CONTROL28
1.29 WARRANTY MANAGEMENT30
1.30 STORED MATERIALS37

ii

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing materials, and furnish labor and materials and perform work to repair fire damper in room C5050 at the Durham VA Medical Center as required by NFPA 80, drawings, and specifications.

B. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

C. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

D.Training:
1.All employees of general contractor and subcontractors shall have the 10-hour OSHA certified Safety course, Asbestos awareness safety courses, and /or other relevant competency training, as determined by VA COR or Safety Office with input from the ICRA team.

2. Supervisors of general contractor and subcontractors shall have the 30-hour OSHA certified Safety course, ASHE Health Care: Subcontractor Certification, ASHE Health Care Workshop Certification and /or other relevant competency training, as determined by VA CP with input from the ICRA team.

3.Submit training records of all such employees for approval before the start of work.
E.All employees of the contractor and subcontractors serve at the discretion of the Chief of Engineering. Chief of Engineering has the right to remove any person from the job site at any time

1.2 SHUTDOWNS

A. Contractor shall maintain all services to occupied portions of building, except as scheduled and approved by COR. To ensure such executions, Contractor shall furnish the COR with a schedule of shutdown dates on which the Contractor intends to accomplish work on adjacent floors and areas. In addition, Contractor shall notify the COR at least two weeks in advance of the proposed date of starting work in each specific area or riser which will affect adjacent occupied areas. More extensive or critical shutdowns will require additional notice.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, the Contractor can download PDF files of the contract drawings and specifications for his use and distribution to Subcontractors.

1.4 PROJECT SECURITY REQUIREMENTS

A.Security Plan:
1.Prior to start of work, prepare a plan detailing project specific security measure. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2.The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B.Security Procedures:
1.General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site or DURVAMC campus.
2.For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 business days’ notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3.No photography of VA premises is allowed without written permission of the Contracting Officer.
4.VA reserves the right to close-down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C.Key Control:
1.The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
2.DURVAMC will issue keys as needed through the Engineering Program Support Assistant. Contractor should request a key through the COR. Contractor will need photo ID and is required to sign-out keys.
One key per contract can be issued. Additional keys can be requested and are subject to approval by the Chief of Engineering.

Lost keys must be reported immediately to VA Police and to the COR. Contractor can be billed the cost to re-core and re-key all affected areas.

Keys must be returned at the completion of the project, or prior to vacating the project site, whichever comes first.

Contractor will comply with Space Key Control policy and other regulations presented by Engineering Support Assistant at the time of key issue.

D.Document Control:
1.Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2.The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3.Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4.These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5.All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6.Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7.All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a.Security, access, and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b.“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E.Motor Vehicle Restrictions
1.Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted in writing 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2.See 1.25 Parking for parking restrictions.

1.5 ROOF AND VERTICAL WORKSAFETY

A. Contractor is responsible for providing safe working conditions at all times. Work performed on roof and vertical elevations of building shall comply with OSHA regulations and VA Safety Office.

1.6 FIRE SAFETY

A.Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
1.American Society for Testing and Materials (ASTM):
E84-2009Surface Burning Characteristics of Building Materials
2.National Fire Protection Association (NFPA):
10-2018Standard for Portable Fire Extinguishers
30-2018Flammable and Combustible Liquids Code
51B-2019Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2020National Electrical Code
72-2019National Fire Alarm and Signaling Code
80-2019Standard for Fire Doors and Other Opening Protectives
101-2018Life Safety Code
241-2019Standard for Safeguarding Project, Alteration, and Demolition Operations
3.Occupational Safety and Health Administration (OSHA):
29 CFR 1910Safety and Health Regulations for Industrial

4. The VA Fire Protection Design Manual (2015)

B.Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR and Facility Safety Officer for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the project limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.
C.Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
D.Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new project by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
E.Temporary Partitions:
1.Install two-hour fire-rated temporary partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures.
2.Close openings in smoke barriers and fire-rated project to maintain fire ratings.
F.Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
G.Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR and facility Safety Officer.
H.Egress Routes for Project Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to COR and facility Safety Officer.
I.Fire Extinguishers: Provide and maintain extinguishers in project areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.
J.Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
K.Sprinklers: Install, test, and activate new automatic sprinklers prior to removing existing sprinklers.
L.Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions one week in advance, and coordinate with COR and facility Safety Officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in project areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.
M.Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR and facility Safety Officer.
N.Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Officer at least 36 hours in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work.
O.Fire Hazard Prevention and Safety Inspections: Inspect entire areas weekly. Coordinate with, and report findings and corrective actions weekly to COR and facility Safety Officer.
P.Smoking: See section 1.27 Tobacco Use for smoking policy.
Q.Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
R.Perform other project, alteration, and demolition operations in accordance with 29 CFR 1926.
S.If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.

T. Work Above Ceiling: Obtain a permit for work from the Durham VA Safety Office for any work that penetrates or otherwise compromises the integrity of any fire or smoke barriers. Contractor shall maintain integrity of these barriers during project.

1.7 HAZARDOUS MATERIALS MANAGEMENT

A.Hazard Communication Program: Establish and maintain a Hazard Communication Program in accordance to the Occupational Safety and Health Administration (OSHA) regulations. Ensure staff have been properly trained on the hazardous materials that they will be brought on site as well as the location where the material safety data sheets (MSDSs) will be kept onsite. Ensure all MSDSs are provided and stored on site near the actual work area(s). MSDSs cannot only be available in an onsite trailer or office remote from the actual work site. All containers of hazardous materials and wastes must be properly labeled and stored at all times.
B.Control of Hazardous Dusts, Vapors, Mists, and Runoff: Every reasonable effort is to be made in the use of hazardous materials to prevent or at last minimize exposure to Project staff and others in adjacent areas, as well as to prevent entrainment in the central HVAC system. This applies to work performed both indoors as well as outdoors. Should a problem arise, work will have to be modified or suspended to eliminate or reduce the impact to workers and/or building occupants.
C.Disposal of Hazardous Wastes: All hazardous wastes generated are to be properly stored and removed as soon as practical from the job site. Transportation and disposal of such wastes is to be in accordance with Environmental Protection Agency (EPA), Department of Transportation (DOT), and State and local regulations.
D.Asbestos: The facility has asbestos containing materials (ACM). In the process of the project, the contractor may come in contact with suspected ACM that has not yet been identified. If suspected ACM is noted, stop work immediately and notify the COR. Under no circumstances is the work to continue. Failure to halt will result in work stoppage and possible citation from the EPA and/or OSHA.
E.Lead: There are areas in the medical center where lead paint has been used. If lead paint is suspected contact the COR immediately.

1.8 OPERATIONS AND STORAGE AREAS

A.The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B.Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C.The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D.Working space and space available for storing materials shall be as determined by the COR.
E.Workmen are subject to rules of Medical Center applicable to their conduct.
F.Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during project, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1.Do not store materials and equipment in other than assigned areas.
2.Schedule delivery of materials and equipment to immediate project working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3.Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G.Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the Utility Company involved:
1.Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
H.Building will be occupied during performance of work and immediate areas of alterations will be vacated.
1.Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of project against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the project period.
I.Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1.No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, for additional requirements.
2.Contractor shall submit a request to interrupt any such services to COR, in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3.Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4.Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5.In case of a contract project emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6.Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J.Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped, or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
K.To minimize interference of Project activities with flow of Medical Center traffic, comply with the following:
1.Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of project materials, debris and standing project equipment and vehicles.
2.Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
L.Coordinate the work for this contract with other Project operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.9 ALTERATIONS

A.Survey: Before any work is started, the Contractor shall make a thorough survey with the COR areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1.Existing condition and types of resilient flooring, doors, windows, walls, and other surfaces not required to be altered throughout affected areas of building.
2.Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3.Shall note any discrepancies between drawings and existing conditions at site.
4.Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR.
B.Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.2362) and "CHANGES" (FAR 52.2434 and VAAR 852.23688).
C.ReSurvey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough resurvey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1.Resurvey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D.Protection: Provide the following protective measures:
1.Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2.Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.
3.Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.10 INFECTION PREVENTION MEASURES

A.Implement the requirements of VAMC’s Infection Control Risk Assessment (ICRA) requirements are discussed by the Construction Safety Sub-Committee multidisciplinary team. Any member of the Construction Safety Sub-Committee may monitor dust in the vicinity of the project work and require the Contractor to take corrective action immediately if the appropriate Infection Control precautions are not being followed.
B.Establish and maintain appropriate Infection Control precautions as part of the contractor’s infection preventive measures in accordance with the Infection Control Risk Assessment (ICRA) provided by Construction Safety Sub-Committee. Prior to start of work, prepare a plan detailing project-specific appropriate Infection Control measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.
1.All personnel involved in the project or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
C.Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during Project. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the project stage to determine impact of project activities on indoor air quality. In addition:
1.The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the project zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the project zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.
2.In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.
3.Contractor shall prevent dust and debris from entering exterior mechanical air intakes. Provide screening and dust collection system to capture dust.
4.Fume hood exhaust is located on roof tops. Contractor shall not obstruct or limit the discharge of exhaust systems.
D.In general, following preventive measures shall be adopted during project to keep down dust and prevent mold.
1.Dampen debris to keep down dust and provide temporary project partitions in existing structures where directed by COR. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during Projects.
2.Do not perform dust producing tasks within occupied areas without the approval of the COR. For project in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .