P09_PWS (Rev1).docx

DOCX document 24 KB Posted

Attached to
7230--Installing an Awing South Entrance of BLDG 4
Solicitation number
36C24122Q0199
Issued by

View the file

Other files

File Type Posted
S02_Attachment 2_Stairs with Side Curtain.jpg JPG image
S20_Attachment 4 Limitation on Subcontracting.doc DOC document
S02_Attachment 3_Past Performance Worksheet.xlsx XLSX spreadsheet
36C24122Q0199.docx DOCX document
S02_Attachment 1_Shop Drawing.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Department of Veterans Affairs (VA) Newington Connecticut Awning with Side Curtain Installation

The purpose of this one-time requirement is to supply a new Awning with Side Curtains and provide all labor and materials necessary to install the Awning with side curtains at the Newington Facility, Building 4 South Entrance. The vendor shall supply and complete the installation of the awning with side curtains within 90 days of contract award unless otherwise agreed upon by the Contracting Officer.

Location of Facility:

Newington VA 555 Willard Ave Building 4 (South Entrance) Newington CT 06111

Salient Characteristics:

The contractor shall furnish all materials, labor, supervision, equipment, and disposal necessary to supply and install an Awning with Side Curtains over the Building 4 South Entrance Stairs.

The contractor shall demonstrate technical capability by providing past performance references.

The contractor shall provide and install an Awning with Side Curtains:

· Awning shall be 6’ wide, projection of 17’ by 3’ height, frame type traditional w/rigid valance, fabric attachment, staple.

· Shall be attached to the building (brick wall) with 2” Z Bracket and Hilti 3/8 Wedge Anchors” embedment.

· 8’ POSTS: 1.5 schedule 40 galvanized posts attached to Awning and concrete deck.

· FRAME work: 1 X 1 Aluminum Tube and welded at all joints

· Fabric: Weldon (deep sea blue) Flame Resistant (meets all building code 5 Year warranty.)

· Side Curtains (welded frame)

· See Attached Shop Drawing and Pictures (Attachment 1&2)

Schedule:

All work shall be performed and completed Monday through Friday between the hours of 7:00 AM EST to 4:00 PM EST. Dates and times of installation shall be coordinated between the Contractor and Government.

Interference to Normal Functions:

When the contractor’s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the VA designee at no additional charge to the Government.

Debris Removal:

The Contractor/Installer shall be required to remove waste materials and debris daily from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations.

Additional Information:

The Department of Veterans Affairs is a smoke free environment and smoking is not permitted at the facility.

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

1. Documentation requirements:

0. If fully vaccinated, contractors shall show proof of vaccination.

0. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

0. If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

0. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

0. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

1. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

1. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

1. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

Records Management:

1. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

2. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

3. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

4. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

5. The Government Agency owns the rights to all data/records produced as part of this contract.

6. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

7. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

8. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

9. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

File details come from the government source that posted it. Updated .