P09 Project Drawings 589A5-21-133 (14 PGS).pdf

PDF 18 MB Posted

Attached to
Z2DA--589A5-21-133, Replace Window Buildings 41, 42, 44
Solicitation number
36C25521R0115
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHED

SH

ED

SHED

CARPORT

st

S

TR

E E

T

ROAD A

R

O A

D

R O

A D

O

ROAD J

ROAD A

ROAD A

R O

A D

A

R O

A D

A

R O

A D

B

R O

A D

C

R O

A D

L

ROAD E

RO

AD

F

R O

A D

D

ROAD K

R O

A D

H

R O

A D

G

GAGE BLVD.

BUILDING

BU

IL

D

IN

G

SHED

SOLAR ENERGY FIELD

GAGE BLVD.

st

S

TR

E E

T

BLDG_NO

BLDG

2 5

T101 T102

11A

2 2

24 25

29A

29B

28A

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:NO DESCRIPTION DATE

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

N

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

BLDGS 41, 42, & 44

WINDOWS REPLACEMENT

COLMERY-O'NEIL VA MEDICAL CENTER

TOPEKA, KANSAS

PROJECT No. 589A5-21-133

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

No. NAME DESCRIPTION

1 GI-100 COVER SHEET

2 GS-100 PROJECT SITE PLAN

3 CS-100 BUILDING 43 PAVEMENT DEMO

4 CS-101 BUILDING 43 PAVEMENT NEW

5 CS-102 BUILDING 43 PAVEMENT DETAILS

6 AD-100 BUILDING 41 1st FLOOR WINDOWS DEMOLITION 7 AD-101 BUILDING 41 2nd FLOOR WINDOWS DEMOLITION

8 AD-102 BUILDING 42 WINDOWS DEMOLITION

9 AD-103 BUILDING 44 BSMT / 1st FLOOR WINDOWS DEMOLITION 10 AD-104 BUILDING 44 BSMT / 1st FLOOR INCINERATOR DEMOLITION

11 AS-600 BUILDING 41 WINDOWS DETAILS

12 AS-601 BUILDING 42 WINDOWS DETAILS

13 AS-602 BUILDING 44 WINDOWS DETAILS

14 AS-603 BUILDING 42 LEAN-TO INSULATION / WEATHER PROOFING

DRAWING INDEX

nTs

Colmery-O'Neil VA Medical Center, Topeka

41, 42, 44 RES

1 14

GI-100

589A5-21-133

05/04/2021

RAF

COVER SHEET BLDGS 41, 42, & 44

WINDOW REPLACEMENT

S:\Facilities\ENGINEERING SERVICE LINE\Project Files\Current Projects\In house Design\589A5-21-133 Bldg 41, 42, and 44 Window Replacement\21- nnn GI-100 cover.dwg, 6/17/2021 2:20:47 PM, AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

18" OAK

AutoCAD SHX Text

24" OAK

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text A/C

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

SHED

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

PIV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

ER

AutoCAD SHX Text

TR

AutoCAD SHX Text

UGM

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

TR

SHED

CARPORT

st

S

TR

E E

T

ROAD A

R O

A D

R O

A D

O

ROAD J

ROAD A

ROAD A

R O

A D

A

R O

A D

A

R O

A D

B

R O

A D

C

R O

A D

L

ROAD E

RO

AD

F

R O

A D

D

ROAD K

R O

A D

H

R O

A D

G

GAGE BLVD.

BUILDING

BU

IL

D

IN

G

SHED

SOLAR ENERGY FIELD

GAGE BLVD.

st

S

TR

E E

T

BLDG_NO

BLDG

2 5

T101 T102

11A

2 2

24 25

29A

29B

28A

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

Colmery-O'Neil VA Medical Center, Topeka

NO DESCRIPTION DATE

00 80' 160'

N1 SCALE: 1" = 80'-0"

OVERALL SITE PLAN

PROJECT LOCATION

1" = 80'-0"

Colmery-O'Neil VA Medical Center, Topeka

41, 42, 44 RES

2 14

GS-100

589A5-21-133

05/04/2021

RAF

PROJECT SITE PLAN

BUILDING LOCATIONS

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

S:\Facilities\ENGINEERING SERVICE LINE\Project Files\Current Projects\In house Design\589A5-21-133 Bldg 41, 42, and 44 Window Replacement\21- nnn GI-100 cover.dwg, 6/17/2021 2:24:03 PM, AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

18" OAK

AutoCAD SHX Text

24" OAK

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text

BRUSH & TIMBER

AutoCAD SHX Text A/C

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

SHED

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

PIV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

ER

AutoCAD SHX Text

TR

AutoCAD SHX Text

UGM

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

TR

C.J.

C.J.

C.J.

C.J.

'-0

49'-8"

1'-1" 3'-4" 1'-3" 8'-0"

REMOVE 1'788 SF OF EXISTING PAVEMENT.

REMOVE 2 EA. 30" x 70" CONCRETE RAMPS

C.J.

'-0

+2.00"

-4.00" +3.50"

-2.625"-1.00"

-0.125"

+4.00"

-0.25"

0"

-1.375"

-2.625"

-2.125"

+4.00"

+4.375"

+4.375"

-2.125"

+0.25"

10 11 12 13 14 15

2722 23 24 25 26

C.J. 3934 35 36 37 38

3328 29 30 31 32

2116 17 18 19 20

-3.75"

-1.375"

-1.75"

-1.375"

-2.625"

+0.375"

-4.875"

-1.00"

-1.25"

-2.125"

-3.75"

-0.25"

-6.50"

-1.75"

-1.75"

-2.125"

-3.125"

-1.25"

-5.00"

-2.375"

-2.125"

-2.25" -2.875"

-2.00"

-4.50"

EXISTING PAVEMENT AT NW CORNER OF BLDG

DESIGNATED AS TBM WITH ASSIGNED ELEV OF ZERO.

EXISTING ELEVATIONS (IN INCHES) RELATIVE TO " 0 "

TBM ELEVATION AT NW CORNER OF BLDG.

EX

IS

TI

NG

S

TE

AM

T

UN

NE

L C

ON

CR

ET

E T

O

RE

MA

IN

U

ND

IS

TU

RB

ED

3/8" = 1'-0" Colmery-O'Neil VA Medical Center, Topeka

3/8" = 1'-0"1 LEVEL 1 - OVERALL PLAN

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

43 RES

3 14

CS-100

589A5-21-133

06/08/2021

RAF

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

BLDG 43

PAVEMENT DEMO

2' 1' 0 2'

N

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg 043\589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b.dwg, 6/17/2021 6:55:27 AM, AutoCAD PDF (General Documentation).pc3

C.J.

C.J.

C.J.

'-0

2'-0" 2'-0"

5'- 7"

C.J.

'-0

49'-8"

1'788 SF OF NEW PAVEMENT.

0"

4"

-1.00"

-1.25"

-2.125"

-3.75"

-0.25"

-6.50"

NEW ELEV. MARKINGS RELATIVE TO

ZERO TBM AT NW BLDG CORNER.

EX

IS

TI

NG

S

TE

AM

T

UN

NE

L C

ON

CR

ET

E T

O

RE

MA

IN

U

ND

IS

TU

RB

ED

1'-1" 3'-4" 1'-3" 8'-0"

3/8" = 1'-0" Colmery-O'Neil VA Medical Center, Topeka

2' 1' 0 2'

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

43 RES

4 14

CS-101

589A5-21-133

06/08/2021

RAF

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

BLDG 43

NEW PAVEMENT

3/8" = 1'-0"1 LEVEL 1 - OVERALL PLAN

N

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg 043\589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b.dwg, 6/17/2021 6:57:35 AM, AutoCAD PDF (General Documentation).pc3

VARIES

6" REINFORCED CONC. PVMT.

EXIST. CONC. PVMT.

6 X 6 - W2.9 X W2.9 WWF

6" AGGREGATE BASE.EPOXY/GROUT #4 BARS X 1'-6"

AT 18" C/C (TYP.) INTO

EXISTING PAVEMENT

3 SCALE: NOT TO SCALE

CONCRETE PATCH REPAIR SECTION

6"

6"

6" X 6" X 6' LONG

CONCRETE WHEEL STOP

PAVED PARKING

SURFACE

2 - GROUTED #4

REBAR 12" LONG

PER WHEEL STOP

FACE OF BUILDING

OR CURB

8'-0"

1 SCALE: NOT TO SCALE

WHEEL STOP DETAIL

1/8" SAWCUT

FILL WITH FOAM

BACKER ROD &

SEALANT

1/2"

2"

1/2"

2 SCALE: NOT TO SCALE

CONTRACTION JOINT

EXIST. CONC. PVMT.

EPOXY/GROUT #4 BARS X 1'-6"

AT 18" C/C (TYP.) INTO

EXISTING PAVEMENT

nTs Colmery-O'Neil VA Medical Center, Topeka

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

43 RES

5 14

CS-102

589A5-21-133

06/10/2021

RAF

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

BLDG 43

NEW PAVEMENT DETAILS

2'-0"

NEW PAVEMENT HEIGHT

ACROSS FRONT OF BUILDING

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg 043\589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b.dwg, 6/17/2021 7:01:24 AM, AutoCAD PDF (General Documentation).pc3

EM

ER

G

EN

C Y

G

EN

ER

A

TO

R

PITS

ELEVATOR

F-13

OFFICE

ES

117 SF

MARK GOERTZ

TOOL CRIB

ES

124 SF

DOCK

ES

219 SF

M

IK

E

LI

VI

N

G

ST

O N

O

FF

IC

E

ES

SF

LOUNGE

ES

244 SF 111A

TOILET

ES

134 SF

WHEELCHAIR REPAIR

ES

201 SF

WHEELCHAIR REPAIR

ES

245 SF

STORAGE

FM

265 SF

ELEV MACH

ES

45 SF

CARPENTRY SHOP

ES

3629 SF

110A

STORAGE

ES

86 SF

WHEELCHAIR REPAIR

ES

699 SF

106A

TELE

OI&T

28 SF

A & MM STORAGE

FM

2240 SF

DOCK

ES

348 SF

MAIN ELECTRIC SUB-STATION

ES

1016 SF

102A

OFFICE

ES

117 SF

102B

STORAGE

ES

172 SF

102C

PAINT BOOTH

ES

119 SF

PAINT SHOP

ES

1313 SF

GEN RM

ES

135 SF

38 38 38 38 38 38 38 35 35

35353535

3333333333333333

N

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

3/16" = 1'-0" 41 RES

6 14

AD-100

589A5-21-133

05/04/2021

RAF

BUILDING 41 - 1st FLOOR

WINDOWS

Colmery-O'Neil VA Medical Center, Topeka

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

DEMOLITION PLAN

6. CONTRACTOR TO COORDINATE ASBESTOS ABATEMENT WITH WINDOW INSTALLATION

TO MINIMIZE INTERIOR EXPOSURE TO THE ELEMENTS AND PROVIDE EASE OF ACCESS FOR

WINDOW INSTALLATION EFFORTS.

3. REGULATED AREA PREPARATIONS SHALL INCLUDE BARRIER TAPE, SIGNAGE,

PERSONNEL AND WASTE DECONTAMINATION STATION, DROP CLOTH EXTENDING AT LEAST 20 FT

FROM BUILDING.

4. CRITICAL BARRIERS OF FIRE RETARDANT POLY SHALL BE

ESTABLISHED TO SEAL OFF PERIMETER TO REGULATED AREA FROM SENSITIVE

RECEPTORS IN ADJACENT SPACES, INCLUDING VENTS, DOORS, AIR INTAKES AND

WINDOWS.

5. ALL HOURS OF WORK TO BE COORDINATED WITH V.A. COR.

1. WINDOW UNITS TO BE REMOVED IN FULL; STEEL TRANSOMS TO REMAIN BUT STRIPPED

OF LEAD BASED PAINT DOWN TO BARE METAL.

2. ACM WINDOW CAULKING (AND LEAD BASED PAINTS) SHALL BE REMOVED UNDER

OUTDOOR CONDITIONS WITHIN AN ESTABLISHED REGULTED AREA AND IN ACCORDANCE

WITH OSHA REGULATIONS FOR CLASS II ASBESTOS WORK ACTIVITIES.

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

1. ALL BUILDING 41, 42 & 44 EXTERIOR WINDOWS TO BE REMOVED-REFER SHEET HA-101 FOR ASBESTOS

ABATEMENT AT WINDOW OPENINGS.

2. EXISTING EQUIPMENT OR EXHAUST FAN LOCATION IN WINDOW FRAME INDICATED BY 'X'.

3. SALVAGE ALL EQUIPMENT FANS FOR RE-INSTALLATION IN NEW WINDOWS AS INDICATED.

4. DRAWINGS ARE ONE PART OF A COMPLETE DOCUMENT SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE OVERALL INTENT OF THE ENTIRE

DOCUMENT SET.

5. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES TO ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

6. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE

EXISTING FACILITIES.

7. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO

MATCH EXISTING.

8. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO

ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

ELEVATIONS - DEMOLITION - GENERAL NOTES:

ACM CAULKING (1'063 L.F. INTERIOR, 1'063 L.F. EXTERIOR) &

GLAZING (3'449 L.F.) AND LEAD BASED PAINT ON EXTERIOR

WINDOWS SCHEDULED FOR REMOVAL & REPLACEMENT.

(40 TOTAL WINDOWS)

WINDOWS THAT OPEN INTO A LEAN-TO, OR OTHER ENCLOSURE,

THAT ARE TO BE LEFT OPEN AFTER EXISTING WINDOW HAS BEEN

REMOVED - NO NEW REPLACEMENT WINDOWS ARE TO BE INSTALLED.

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg41\FL1\Bldg41-1 MASTER-c.dwg, 6/17/2021 9:03:16 AM, AutoCAD PDF (General Documentation).pc3

DN

ELEV.

F-13

OFFICE

ES

955 SF

OFFICE

ES

90 SF

LOCKER RM

ES

77 SF

TOILET

ES

16 SF

ELEVATOR LOBBY

ES

146 SF

30 31 32 32

33 34 34 34

N

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

1/2" = 1'-0" 41 RES

7 14

AD-101

589A5-21-133

05/04/2021

RAF

Colmery-O'Neil VA Medical Center, Topeka

BLDGS 41, 42, & 44

WINDOW REPLACEMENTBUILDING 41 - 2nd FLOOR

WINDOWS

DEMOLITION PLAN

6. CONTRACTOR TO COORDINATE ASBESTOS ABATEMENT WITH WINDOW INSTALLATION

TO MINIMIZE INTERIOR EXPOSURE TO THE ELEMENTS AND PROVIDE EASE OF ACCESS FOR

WINDOW INSTALLATION EFFORTS.

3. REGULATED AREA PREPARATIONS SHALL INCLUDE BARRIER TAPE, SIGNAGE,

PERSONNEL AND WASTE DECONTAMINATION STATION, DROP CLOTH EXTENDING AT LEAST 20 FT

FROM BUILDING.

4. CRITICAL BARRIERS OF FIRE RETARDANT POLY SHALL BE

ESTABLISHED TO SEAL OFF PERIMETER TO REGULATED AREA FROM SENSITIVE

RECEPTORS IN ADJACENT SPACES, INCLUDING VENTS, DOORS, AIR INTAKES AND

WINDOWS.

5. ALL HOURS OF WORK TO BE COORDINATED WITH V.A. COR.

1. WINDOW UNITS TO BE REMOVED IN FULL; STEEL TRANSOMS TO REMAIN BUT STRIPPED

OF LEAD BASED PAINT DOWN TO BARE METAL.

2. ACM WINDOW CAULKING (AND LEAD BASED PAINTS) SHALL BE REMOVED UNDER

OUTDOOR CONDITIONS WITHIN AN ESTABLISHED REGULTED AREA AND IN ACCORDANCE

WITH OSHA REGULATIONS FOR CLASS II ASBESTOS WORK ACTIVITIES.

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

1. ALL BUILDING 41, 42 & 44 EXTERIOR WINDOWS TO BE REMOVED-REFER SHEET HA-101 FOR ASBESTOS

ABATEMENT AT WINDOW OPENINGS.

2. EXISTING EQUIPMENT OR EXHAUST FAN LOCATION IN WINDOW FRAME INDICATED BY 'X'.

3. SALVAGE ALL EQUIPMENT FANS FOR RE-INSTALLATION IN NEW WINDOWS AS INDICATED.

4. DRAWINGS ARE ONE PART OF A COMPLETE DOCUMENT SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE OVERALL INTENT OF THE ENTIRE

DOCUMENT SET.

5. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES TO ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

6. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE

EXISTING FACILITIES.

7. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO

MATCH EXISTING.

8. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO

ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

ELEVATIONS - DEMOLITION - GENERAL NOTES:

ACM CAULKING (1'063 L.F. INTERIOR, 1'063 L.F. EXTERIOR) &

GLAZING (3'486 L.F.) AND LEAD BASED PAINT ON EXTERIOR

WINDOWS SCHEDULED FOR REMOVAL & REPLACEMENT.

(40 TOTAL WINDOWS)

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg41\FL2\Bldg41-2 MASTER-b.dwg, 6/17/2021 9:03:49 AM, AutoCAD PDF (General Documentation).pc3

'-5

5/ 8"

93'-4 7/8"

STORAGE

ENG

125 SF

MAINTENANCE

SHOP

ENG

1728 SF

RESTROOM

ENG

107 SF

LOUNGE

ENG

166 SF

GROUNDS

WORK

LEADER

OFFICE

ENG

175 SF

PIM

SUPERVISOR

ENG

113 SF

STORAGE

LOG

49 SF

WAREHOUSE

LOG

2706 SF

WOMEN

ENG

65 SF

WORK

ORDER

OFFICE

ENG

73 SF

STORAGE

SHED

ENG

2139 SF

STORAGE

SHED

ENG

2139 SF

CHAIN LINK

CLOSET

ENG

10 SF

105A

-0' - 9 1/2" AFF

-0' - 9 1/2" AFF

GARAGE

SHED

ENG

1783 SF

RAMP

DN

EEW

DF

24'-10 3/4"

8'-

3/ 4"

1'-

1/ 2"

22 22

22 22 22 22 22

3/16" = 1'-0"1 LEVEL 1 - OVERALL PLAN

N

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

3/16" = 1'-0" 42 RES

8 14

AD-102

589A5-21-133

05/04/2021

RAF

Colmery-O'Neil VA Medical Center, Topeka

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

6. CONTRACTOR TO COORDINATE ASBESTOS ABATEMENT WITH WINDOW INSTALLATION

TO MINIMIZE INTERIOR EXPOSURE TO THE ELEMENTS AND PROVIDE EASE OF ACCESS FOR

WINDOW INSTALLATION EFFORTS.

3. REGULATED AREA PREPARATIONS SHALL INCLUDE BARRIER TAPE, SIGNAGE,

PERSONNEL AND WASTE DECONTAMINATION STATION, DROP CLOTH EXTENDING AT LEAST 20 FT

FROM BUILDING.

4. CRITICAL BARRIERS OF FIRE RETARDANT POLY SHALL BE

ESTABLISHED TO SEAL OFF PERIMETER TO REGULATED AREA FROM SENSITIVE

RECEPTORS IN ADJACENT SPACES, INCLUDING VENTS, DOORS, AIR INTAKES AND

WINDOWS.

5. ALL HOURS OF WORK TO BE COORDINATED WITH V.A. COR.

1. WINDOW UNITS TO BE REMOVED IN FULL; STEEL TRANSOMS TO REMAIN BUT STRIPPED

OF LEAD BASED PAINT DOWN TO BARE METAL.

2. ACM WINDOW CAULKING (AND LEAD BASED PAINTS) SHALL BE REMOVED UNDER

OUTDOOR CONDITIONS WITHIN AN ESTABLISHED REGULTED AREA AND IN ACCORDANCE

WITH OSHA REGULATIONS FOR CLASS II ASBESTOS WORK ACTIVITIES.

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

1. ALL BUILDING 41, 42 & 44 EXTERIOR WINDOWS TO BE REMOVED-REFER SHEET HA-101 FOR ASBESTOS

ABATEMENT AT WINDOW OPENINGS.

2. EXISTING EQUIPMENT OR EXHAUST FAN LOCATION IN WINDOW FRAME INDICATED BY 'X'.

3. SALVAGE ALL EQUIPMENT FANS FOR RE-INSTALLATION IN NEW WINDOWS AS INDICATED.

4. DRAWINGS ARE ONE PART OF A COMPLETE DOCUMENT SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE OVERALL INTENT OF THE ENTIRE

DOCUMENT SET.

5. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES TO ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

6. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE

EXISTING FACILITIES.

7. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO

MATCH EXISTING.

8. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO

ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

ELEVATIONS - DEMOLITION - GENERAL NOTES:

ACM CAULKING (255 L.F. INTERIOR, 255 L.F. EXTERIOR) &

GLAZING (873 L.F.) AND LEAD BASED PAINT ON EXTERIOR

WINDOWS SCHEDULED FOR REMOVAL & REPLACEMENT.

(10 TOTAL WINDOWS)

BUILDING 42

WINDOWS

DEMOLITION PLAN

WINDOWS THAT OPEN INTO A LEAN-TO, OR OTHER ENCLOSURE,

THAT ARE TO BE LEFT OPEN AFTER EXISTING WINDOW HAS BEEN

REMOVED - NO NEW REPLACEMENT WINDOWS ARE TO BE INSTALLED.

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg 042\Bldg 42 - Sheet - AE111 - LEVEL 1 - OVERALL PLAN-b.dwg, 6/17/2021 7:10:08 AM, AutoCAD PDF (General Documentation).pc3

BASEMENT FLOOR PLAN 1st FLOOR PLAN

INCINERATOR

ES

475 SF

N

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

RES

AD-103

589A5-21-133

05/04/2021

RAF

Colmery-O'Neil VA Medical Center, Topeka

443/4" = 1' - 0"

BLDGS 41, 42, & 44

WINDOW REPLACEMENTBUILDING 44

WINDOWS

DEMOLITION PLAN

6. CONTRACTOR TO COORDINATE ASBESTOS ABATEMENT WITH WINDOW INSTALLATION

TO MINIMIZE INTERIOR EXPOSURE TO THE ELEMENTS AND PROVIDE EASE OF ACCESS FOR

WINDOW INSTALLATION EFFORTS.

3. REGULATED AREA PREPARATIONS SHALL INCLUDE BARRIER TAPE, SIGNAGE,

PERSONNEL AND WASTE DECONTAMINATION STATION, DROP CLOTH EXTENDING AT LEAST 20 FT

FROM BUILDING.

4. CRITICAL BARRIERS OF FIRE RETARDANT POLY SHALL BE

ESTABLISHED TO SEAL OFF PERIMETER TO REGULATED AREA FROM SENSITIVE

RECEPTORS IN ADJACENT SPACES, INCLUDING VENTS, DOORS, AIR INTAKES AND

WINDOWS.

5. ALL HOURS OF WORK TO BE COORDINATED WITH V.A. COR.

1. WINDOW UNITS TO BE REMOVED IN FULL; STEEL TRANSOMS TO REMAIN BUT STRIPPED

OF LEAD BASED PAINT DOWN TO BARE METAL.

2. ACM WINDOW CAULKING (AND LEAD BASED PAINTS) SHALL BE REMOVED UNDER

OUTDOOR CONDITIONS WITHIN AN ESTABLISHED REGULTED AREA AND IN ACCORDANCE

WITH OSHA REGULATIONS FOR CLASS II ASBESTOS WORK ACTIVITIES.

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

GENERAL NOTES:

1. ALL BUILDING 41, 42 & 44 EXTERIOR WINDOWS TO BE REMOVED-REFER SHEET HA-101 FOR ASBESTOS

ABATEMENT AT WINDOW OPENINGS.

2. EXISTING EQUIPMENT OR EXHAUST FAN LOCATION IN WINDOW FRAME INDICATED BY 'X'.

3. SALVAGE ALL EQUIPMENT FANS FOR RE-INSTALLATION IN NEW WINDOWS AS INDICATED.

4. DRAWINGS ARE ONE PART OF A COMPLETE DOCUMENT SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON THE OVERALL INTENT OF THE ENTIRE

DOCUMENT SET.

5. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY DEMOLITION WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES TO ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

6. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE

EXISTING FACILITIES.

7. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATH AND REPAIR ANY DAMAGE TO ADJACENT FINISHES TO

MATCH EXISTING.

8. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO

ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

ELEVATIONS - DEMOLITION - GENERAL NOTES:

ACM CAULKING (79 L.F. INTERIOR, 79 L.F. EXTERIOR) &

GLAZING (170 L.F.) AND LEAD BASED PAINT ON EXTERIOR

WINDOWS SCHEDULED FOR REMOVAL & REPLACEMENT.

(5 TOTAL WINDOWS)

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg44\Bldg44-B-1-MASTER-b.dwg, 6/17/2021 7:45:19 AM, AutoCAD PDF (General Documentation).pc3

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

1/4" = 1'-0"

Colmery-O'Neil VA Medical Center, Topeka

44 RES

10 14

N

1 SCALE: 1/4" = 1'-0"

Bldg 44

AD-104

589A5-21-133

05/04/2021

RAF

BLDGS 41, 42, & 44

WINDOW REPLACEMENTBUILDING 44

INCINERATOR

DEMOLITION PLAN

REMOVE EXISTING INCINERATOR AND SUPPORTING EQUIPMENT.

REPLACE EXISTING ROOF AFTER STACK HAS BEEN REMOVED.

S:\Facilities\ENGINEERING SERVICE LINE\Project Files\Current Projects\In house Design\589A5-21-133 Bldg 41, 42, and 44 Window Replacement\21- nnn GI-100 cover.dwg, 6/25/2021 7:30:36 AM, AutoCAD PDF (General Documentation).pc3

LEVEL 1

932' - 0 13/16"

ROOF

957' - 0 13/16"

LEVEL 2

945' - 0 13/16"

BASEMENT

920' - 0 13/16"

PAINT SHOP

927' - 11 5/16"

LEVEL 1

932' - 0 13/16"

ROOF

957' - 0 13/16"

LEVEL 2

945' - 0 13/16"

BASEMENT

920' - 0 13/16"

PAINT SHOP

927' - 11 5/16"

LEVEL 1

932' - 0 13/16"

ROOF

957' - 0 13/16"

LEVEL 2

945' - 0 13/16"

BASEMENT

920' - 0 13/16"

PAINT SHOP

927' - 11 5/16"

LEVEL 1

932' - 0 13/16"

ROOF

957' - 0 13/16"

LEVEL 2

945' - 0 13/16"

PAINT SHOP

927' - 11 5/16"

BUILDING 41 NORTH ELEVATION

3/32" = 1'-0"

BUILDING 41 SOUTH ELEVATION

3/32" = 1'-0"

BUILDING 41 EAST ELEVATION

3/32" = 1'-0"

BUILDING 41 WEST ELEVATION

3/32" = 1'-0"

33 33 33 33 33 33 33 33 33

35 35 35 35

38 38 38 38 38 38 38 35 35

33 33

373737 33

32 32 31 30

343433

36 35

Colmery-O'Neil VA Medical Center, Topeka

32" = 1'-0"

Colmery-O'Neil VA Medical Center, Topeka

41 RES

11 14

AS-600

589A5-21-133

05/04/2021

RAF

BUILDING 41

WINDOW DETAILS

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS:

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM BLDGS 41, 42, & 44

WINDOW REPLACEMENT

Blanked out spaces with a diagonal slash represent windows with items in them -exhaust vent, fans, A/Cs, etc. No new windows are to be installed in these locations, but existing equipment is to be re-installed, and the window sealed.

See photo below for an example.

C:\Users\VHALEASmithRE\Desktop\Revit Files\589A5_041_A_central_backup\589A5_041_A_central - Elevations_NSEW.dwg, 6/17/2021 7:47:49 AM, AutoCAD PDF (General Documentation).pc3

LEVEL 1

928' - 0 1/4"

ROOF

941' - 6 1/4"

LEVEL 1

928' - 0 1/4"

ROOF

941' - 6 1/4"

BUILDING 42 NORTH ELEVATION - DEMOLITION

3/32" = 1'-0"

BUILDING 42 SOUTH ELEVATION - DEMOLITION

3/32" = 1'-0"

BUILDING 42 WEST ELEVATION - DEMOLITION

3/32" = 1'-0"

BUILDING 42 EAST ELEVATION - DEMOLITION

3/32" = 1'-0"

LEVEL 1

928' - 0 1/4"

ROOF

941' - 6 1/4"

LEVEL 1

928' - 0 1/4"

ROOF

941' - 6 1/4"

22 22

22222222222222

1/8" = 1'-0"

Colmery-O'Neil VA Medical Center, Topeka

42 RES

12 14

AS-601

589A5-21-133

05/04/2021

RAF

BUILDING 42

WINDOW DETAILS

D ep ar tm en t o f Ve te ra ns A ffa irsFACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

NO DESCRIPTION DATE

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS:

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

C:\Users\VHALEASmithRE\Desktop\Revit Files\589A5_042_A_central_backup\589A5_042_A_central - Elevation - NSEW.dwg, 6/17/2021 7:50:43 AM, AutoCAD PDF (General Documentation).pc3

20 20 20 20 20

3/4" OSB BOARD

METAL STUDS

INSULATION

3/4" TREATED EXTERIOR GRADE PLYWOOD

PAINTED TO MATCH COLOR OF EXISTING BRICK.

3/4" OSB BOARD

METAL STUDS

INSULATION

3/4" TREATED EXTERIOR GRADE PLYWOOD

PAINTED TO MATCH COLOR OF EXISTING BRICK.

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS:

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

D ep ar tm en t o f Ve te ra ns A ffa irsFACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

NO DESCRIPTION DATE

nTs

Colmery-O'Neil VA Medical Center, Topeka

44 RES

13 14

AS-602

589A5-21-133

05/04/2021

RAF

BLDGS 41, 42, & 44

WINDOW REPLACEMENT

BUILDING 44

WINDOW DETAILS

Blanked out spaces with a diagonal slash represent windows with items in them -exhaust vent, fans, A/Cs, etc. No new windows are to be installed in these locations, but existing equipment is to be re-installed, and the window sealed.

-TYPICAL WALL SECTION- -TYPICAL BASEMENT SECTION- -TYPICAL 1st FLOOR SECTION-

NTS NTS NTS

C:\Users\VHALEASmithRE\Desktop\40s Asbestos Mitigation\44\589A5-044.dwg, 6/28/2021 9:43:10 AM, AutoCAD PDF (General Documentation).pc3

'-5

5/ 8"

-0' - 9 1/2" AFF

GARAGE

SHED

ENG

1783 SF

24'-10 3/4"

8'-

3/ 4"

1'-

1/ 2"

4'- 0"

73'-10"

14'-6" 2'-6" 14'-6" 2'-6" 14'-6" 4'-6" 14'-6" 2'-8"

24'-1" 24'-1"

7'-

0"

6'- 6"

24'-1"

'-1

0"

5'-

0"

AS-603

Finished Floor

Finished Floor Finished Floor

692 SF Area of new insulation

115 SF Area of new insulation 97 SF Area of new insulation

1785 SF Area of new ceiling insulation

NEW

CEILING MOUNTED

GAS HEATER

EXISTING

CEILING MOUNTED

GAS HEATER

AS

-6

AS-603

4'- 9"

4'- 9"

4'- 0"

73'-10"

3'-8" 14'-6" 2'-6" 14'-6" 2'-6" 14'-6" 4'-6" 14'-6" 2'-8"

24'-1" 24'-1"

5'-

1/

2"

7'-

0"

7'- 5" 6'-

6"

Finished Floor

Finished Floor Finished Floor

692 SF Area of new insulation

115 SF Area of new insulation 97 SF Area of new insulation

Va rie s be tw ee n

0"

3/16" = 1'-0"1 LEVEL 1 - OVERALL PLAN

N

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

1/4" = 1'-0" 42 RES

14 14

AS-603

589A5-21-133

06/16/2021

RAF

Colmery-O'Neil VA Medical Center, Topeka

BLDGS 41, 42, & 44

WINDOW REPLACEMENTINSULATION & WATER SEAL

BLDG 42 EAST-SIDE LEAN-TO

4 " = 1'-0"

EAST - INTERIOR WALL1

SOUTH - INTERIOR WALL2 NORTH - INTERIOR WALL31

4 " = 1'-0" 1

4 " = 1'-0"

C:\Users\VHALEASmithRE\Desktop\All Topeka Bldgs-b\Bldg 042\Bldg 42 - Sheet - AE111 - LEVEL 1 - OVERALL PLAN-b.dwg, 6/17/2021 9:42:30 AM, AutoCAD PDF (General Documentation).pc3

Sheets and Views
21- nnn GI-100 cover-1 1-GI-100 COVER SHEET
2-21-133_GI-101_Site.pdf
Sheets and Views
21- nnn GI-100 cover-2 1-GS-100 SITE PLAN
3-21-133_CS-100_B43 Pvmt Demo.pdf
Sheets and Views
589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b-Pavement Demo
4-21-133_CS-101_B43 Pvmt New.pdf
Sheets and Views
589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b-Pavement New
5-21-133_CS-102_B43 Pvmt Details.pdf
Sheets and Views
589A5_043 - AE111 - LEVEL 1 - OVERALL PLAN-b-Pavement Details
6-21-133_AD-100_B41 1st Floor Windows Demo.pdf
Sheets and Views
Bldg41-1 MASTER-c-window replacement AD-100
7-21-133_AD-101_B41 2nd Floor Windows Demo.pdf
Sheets and Views
Bldg41-2 MASTER-b-Window Replacement (2)
8-21-133_AD-102_B42 Window Demo.pdf
Sheets and Views
Bldg 42 - Sheet - AE111 - LEVEL 1 - OVERALL PLAN-b-Window Replacement
9-21-133_AD-103_B44 Windows Demo.pdf
Sheets and Views
Bldg44-B-1-MASTER-b-Window Replacement (2)
10-21-133_AD-104_B44 Incinerator Demo.pdf
Sheets and Views
21- nnn GI-100 cover-3 1-AS-100 B1 BSMT
11-21-133_AS-600_B41 Window Details.pdf
Sheets and Views
589A5_041_A_central - Elevations_NSEW-Window Replacement
12-21-133_AS-601_B42 Window Details.pdf
Sheets and Views
589A5_042_A_central - Elevation - NSEW-Window Replacement
13-21-133_AS-602_B44 Window Details.pdf
Sheets and Views
589A5-044-Window Replacement
14-21-133_AS-603_B42 Insulation.pdf
Sheets and Views
Bldg 42 - Sheet - AE111 - LEVEL 1 - OVERALL PLAN-b-Insulation I seal-up
1-21-133_GI-100_Cover.pdf
Sheets and Views
21- nnn GI-100 cover-1 1-GI-100 COVER SHEET

File details come from the government source that posted it. Updated .