This is a Product Description document detailing requirements for a VAKN Uplink Monitor and Control System upgrade for the VA Institute for Learning, Education and Development (ILEAD). The document specifies the need to replace an end-of-life Crystal Solutions Monitor & Control system with a new Compass Uplink Monitor and Control system (or equal) that must integrate with existing VAKN uplink legacy equipment including amplifiers, controllers, receivers, and other components.
The system requirements include support for monitoring/controlling 50+ devices, SNMP compatibility, serial and ethernet functionality, support for 5 simultaneous GUI users, and spectrum analyzer integration. The contract includes hardware, software, remote/onsite commissioning, configuration, testing, and training for 5 users. Deliverables must be provided within 90 days of award for hardware/software and 180 days for professional services. The period of performance includes one base period plus two 12-month options. Installation will occur at 1 Jefferson Barracks Drive, St. Louis, MO. The contract will be Firm Fixed-Price and includes three years of maintenance support starting from system production.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77625Q0104.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTITUTE FOR LEARNING, EDUCATION, AND DEVELOPMENT (ILEAD)
PRODUCT DESCRIPTION
VAKN UPLINK MONITOR AND CONTROL SYSTEM UPGRADE
DEPARTMENT OF VETERANS AFFAIRS
INSTITUTE FOR LEARNING, EDUCATION AND DEVELOPMENT (ILEAD)
VAKN UPLINK MONITOR AND CONTROL SYSTEM UPGRADE – COMPASS MONITOR AND CONTROL SYSTEM (BRAND NAME OR EQUAL)
VERSION 1.4
DATED
February 2, 2025
1. Background:
The Institute for Learning, Education and Development (ILEAD) provides education satellite services for employees and contractors. These satellite educational programs support Veterans Health Administration (VHA) facilities’ ability to stay abreast of the latest changes in treatment modalities, techniques, and regulations. The use of a satellite education system enables a much larger percentage of the VHA workforce to receive technical and professional training on a recurring basis. Training that is available through either a live broadcast or recorded broadcast is a tool to deliver current information.
ILEAD also delivers a Veteran centric satellite distribution channel, Veterans News Network (VNN). VNN is delivered to all VA Medical Centers (VAMC), Community Based Outpatient Clinic (CBOC) and Veterans Benefits Administration (VBA) Regional Office (RO). VNN delivers informative information for our Veterans, which can also be viewed on the VNN YouTube channel.
The current VA Knowledge Network (VAKN)/VNN Uplink Crystal Solutions Monitor & Control system is at end of life and will no longer be supported after 12/31/24. ILEAD needs to replace the Crystal Monitor and Control system with a new Compass Uplink Monitor and Control system (Brand Name or Equal).
The new VAKN uplink monitor, and control system shall fully integrate with full operability with the following VAKN uplink legacy equipment:
| Quantity |
| VAKN Uplink Legacy Equipment |
| 2 |
| Amplifier - GD Satcom PRKM100LA-7A Ethernet/Serial |
| 2 |
| Amplifier Control - GD Satcom RCP-2001 |
| 2 |
| Antenna Controller - Research Concepts RC-2500 Serial |
| 2 |
| Upconverter - Comtech LBC-4000 Ethernet/Serial |
| 1 |
| Dehydrator - ETI EDH-4 Serial |
| 1 |
| Spectrum Analyzer - Avcom RSA-2500 B1B Serial |
| 1 |
| Heater - Walton/ASE DP-7EX Serial |
| 1 |
| Matrix Switch - Quintech QE3250032X32CAFFF009 Ethernet |
| 4 |
| Receiver - Cisco 9865 Ethernet |
| 1 |
| Redundant Power Supply - Quintech RPS |
| 6 |
| Receiver - Cisco 9854 Ethernet |
| 1 |
| Antenna Controller - Research Concepts RC-2000 Serial |
| 1 |
| Contact Closure - Device WAGO |
| 1 |
| Amplifier (backup) - Terrasat iBUC 2 |
| 1 |
| Devicemaster |
| 1 |
| Heat alarm Discreet I/O |
| 1 |
| Rear Door Closure Discreet I/O |
| 1 |
| Front Door Closure Discreet I/O |
2. Applicable Documents: Applicable policies and procedures will be identified in the contract via the appropriate clauses.
3. Product Specifications and Deliverables:
3.1 Required Compass Monitor and Control System, brand name or equivalent:
· Will fully integrate with full operability with all VAKN uplink legacy equipment, listed in section one.
· Will support the monitoring and control of a minimum of 50 devices.
· Will fully support SNMP (Simple Network Management Protocol).
· Will fully support both serial and ethernet based equipment monitor and control functionality.
· Will support a minimum of 5 simultaneous GUI (graphical user interface) users.
· Will support full operability with an external spectrum analyzer.
· Will be a complete turnkey solution, including all hardware and software.
· Will include all remote/onsite system commissioning, configuration, integration, testing and operational/administrative training for five end users.
· Will include ongoing service support past the first year of operation.
Compass Uplink Monitor and Control System Upgrade (Brand Name or Equal)
| Salient Specifications |
| Description |
| Rationale for Specifications |
| KN-C-SERVER-50-S |
| Software License to monitor up to 50 devices |
[Compass Monitor and Control System or Equal] This is part of the proprietary Compass software for the M&C system. Software license to monitor the legacy hardware being integrated with the Compass monitor and control system.
KN-C-SNMP-SERVER
Software License to monitor and control SNMP devices [Compass Monitor and Control System or Equal] This is part of the proprietary Compass software for the M&C system. Software license for the control of the legacy hardware that uses SNMP.
| KN-C-GUI-5 |
| Software License for up to 5 simultaneous user access to the GUI |
[Compass Monitor and Control System or Equal] This is part of the proprietary Compass software for the M&C system. Software license for the simultaneous end users of the Compass monitor and control system.
| KN-C-SPECTRUM-ANALYZER |
| Software License to monitor and control Spectrum Analyzer |
[Compass Monitor and Control System or Equal] This is part of the proprietary Compass software for the M&C system. Software license to control the legacy spectrum analyzer.
| KN-ServerPC-Medium |
| Dell PE R450 Intel® Xeon® Silver 4309Y 2.8G x2, 16 GB, 600GB x2 RAID 1, Fully Redundant Power Supply, iDRAC, Windows 2022 or equivalent |
[Compass Monitor and Control System or Equal] Dell server to run the Compass monitor and control proprietary software.
| KN - System Integration Engineering/S-1001 |
| Inhouse Engineering Services. To include all system configuration and testing, before onsite delivery. |
| This is for all factory system configuration and testing prior to being delivered onsite. |
| KN-Commissioning_Travel_Expenses |
| Costs for travel and expenses to travel to site for Commissioning |
This is for the travel of the Compass engineer for the onsite commissioning and training of the Compass monitor and control system.
| KN _ Services_OnSite_Commissioning |
| Onsite Commissioning Services. To include all onsite commissioning, configuration, integration, system testing and end user operations and admin training. |
[Compass Monitor and Control System or Equal] This is for the Compass engineer coming onsite to perform all onsite commissioning, configuration, integration, system testing and end user operations and admin training.
| KS-MAINT-SPT-PPY |
| Kratos Space - Standard Maintenance &Support Contract (1 year) |
[Compass Monitor and Control System or Equal] This is for the vendor maintenance and support for the first year the monitor and control system is in production.
| KS-MAINT-SPT-PPY-2 |
| Kratos Space - Standard Maintenance &Support Contract (2 year) |
[Compass Monitor and Control System or Equal] This is for the vendor maintenance and support for the second year the monitor and control system are in production.
| KS-MAINT-SPT-PPY-3 |
| Kratos Space - Standard Maintenance &Support Contract (3 year) |
[Compass Monitor and Control System or Equal] This is for the vendor maintenance and support for the third year the monitor and control system are in production.
Deliverable(s):
Table 1, Mandatory Deliverable Table
| Deliverable |
| Description |
| Quantity |
Due Date
| 3.1 |
| KN-C-SERVER-50-S |
| 1 |
| 90 days after award |
| 3.1 |
| KN-C-SNMP-SERVER |
| 1 |
| 90 days after award |
| 3.1 |
| KN-C-GUI-5 |
| 1 |
| 90 days after award |
| 3.1 |
| KN-C-SPECTRUM-ANALYZER |
| 1 |
| 90 days after award |
| 3.1 |
| KN-C-SERVERPC-Medium |
| 1 |
| 90 days after award |
| 3.1 |
| KN-System Integration Engineering |
| 1 |
| 180 days after award |
| 3.1 |
| KN-Commissioning_Travel_Expenses |
| 1 |
| 180 days after award |
| 3.1 |
| KN- onsite services |
| 1 |
| 180 days after award |
| 3.1 |
| KS-MAINT-SPT-PPY |
| 1 |
| To start on the first day the monitor and control system is placed in production. |
| 3.1 |
| KS-MAINT-SPT-PPY-2 |
| 1 |
| To start when KS-MAINT-SPT-PPY has finished. |
| 3.1 |
| KS-MAINT-SPT-PPY-3 |
| 1 |
| To start when KS-MAINT-SPT-PPY-2 has finished. |
3.2 Ancillary Services and Deliverables:
3.2.1 Delivery
3.2.1.1.1 Contractor must deliver product to address specified in section 5.2
3.2.2 Installation
3.2.2.1.1 Upon delivery, the Contractor must perform remote and onsite system commissioning, integration with legacy equipment, system configuration, system acceptance testing, and onsite operations and admin training for the Compass monitor and control system.
4 Government-Furnished Equipment (GFE)/Government Furnished Information (GFI): there will be no GFE on this contract.
5 General Information:
5.1 Delivery Date: 90 days after award for all hardware and software delivery. 180 days after award for the remote and onsite professional services.
5.2 Place of Delivery and/or Installation: Product shall be delivered and/or installed at:
1 Jefferson Barracks Drive Building 56, St. Louis, MO. 63125.
Contractor shall deliver and install during normal business hours from 8:00 A.M. to 4:30 P.M. local time, Monday through Friday, or as otherwise specified.
5.3 Period of Performance: The period of performance shall be one base period plus two 12-month option periods.
5.4 Observance of Government Holidays. There are 10 Federal holidays set by law (USC Title 5 Section 6103). Under current definitions, four are set by date:
| New Year's Day | January 1 | |
| Independence Day | July 4 | |
| Veterans Day | November 11 | |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday. The other six holidays are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January | |
| Washington's Birthday | Third Monday in February | |
| Memorial Day | Last Monday in May | |
| Labor Day | First Monday in September | |
| Columbus Day | Second Monday in October | |
| Thanksgiving | Fourth Thursday in November |
5.5 Type of Contract: The Government anticipates award of a Firm Fixed-Price contract.
MASTER
File details come from the government source that posted it. Updated .