Text version

This project involves the installation of nine potholes (shallow excavation). Listed below are Additional Conditions" for this specific design which are used to supplement the Construction Specifcation(s) included in this design.

1. This project includes:

a. Stripping topsoil from 9 proposed potholes and spoil area

b. Construction of potholes and spoil placement as per requirements specified in this design

c. Reestablishing topsoil and seeding.

2. All Federal, State, and Local Laws. Rules and Regulations governing the construction of this project shall be strictly followed.

The owner or operator is responsible for obtaining all construction permits.

3. It is the contractor's responsibility to complete the ONE CALL as per PA. Act 38 (1991). The design ONE CALL number for this project is 20200981626, dated 4/7/2020.

4. A preconstruction meeting shall be scheduled onsite at least 1 week prior to the start of construction. All responsible parties shall be present. Contact the Berks County NRCS office at 610-372-4655.

5. Construction layout of all project components will be performed by NRCS. Notify NRCS inspector 7 days prior to needing construction layout.

6. Refer to the attached Contractors' Notification List for required visits by the Natural Resources Conservation Service or their designated representative.

7. The contractor is responsible for verifying actual field measurements shown on the plan.

8. The contractor is responsible to provide final seeding upon completion of the job and as per Attachment #1, Construction

Specification 6 - Seeding, Sprigging, and Mulching.

9. The contractor is responsible for all items in the Erosion and Sedimentation Control Plan. This includes a filter fence or filter sock below the site.

10. A copy of the specifications, drawings, and details shall be on site during all phases of construction. Please note other critical items on the cover sheet.

11. It is the responsibility of the contractor to implement all measures necessary to protect work-in-progress from environmental conditions such as temperature extremes, surface and groundwater, etc.

12. A final inspection of all project components shall be conducted. When all components are accepted, the contractor will be released from the site.

13. The Certification of Conformance shall certify that all work was performed to Design and Specifications. See CERTIFICATION

OF CONFORMANCE SHEET.

SITE LOCATION

To the best of my knowledge, I certify that the practices have been installed as per the attached drawings and specifications, based on my observations and information provided to me.

Signature of Quality Assurance Person Date

In my professional opinion, I certify that the practices have been installed as per the attached drawings and specifications, based on the information provided to me and/or observations I have made.

Contracting Officer's Representative Date

INSPECTOR PHONE

BACKUP INSPECTOR PHONE

CONTRACTOR PHONE

Date

CONTRACTOR PHONE

Date

CONSTRUCTION CONTACT INFORMATION

START & COMPLETION

CERTIFICATION

Albright's Mill LLC 9927 Kistler Valley Rd Kempton, PA 19529

WETLAND CREATION, RESTORATION AND ENHANCEMENT

TABLE OF CONTENTS

Page 1.........Cover

Page 2.........Plan View West

Page 3.........Plan View East

Page 4.........Construction Notes & Cut/Fill Summary

Page 5-7......Profiles A-A' - E-E'

Page 8.........E&S Control Plan

N a t u r a l

R e s o u r c e s

C o n s e r v a t i o n

S e r v i c e

U n i t e d

S t a t e s

D e p a r t m e n t o f

A g r i c u l t u r e

1 8Additional Agronomic Page 9.....Seeding and Planting Plan

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text Berks County, PA

AutoCAD SHX Text Ludwig, Albert

AutoCAD SHX Text Ludwig, Albert

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4/2020

AutoCAD SHX Text 4/2020

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COVER

AutoCAD SHX Text Albright's Mill WRE

AutoCAD SHX Text Albrights mill cover sheet.dwg

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Sheet of

AutoCAD SHX Text File No.

Client(s): ALBRIGHTS MILL LLC Berks County, Pennsylvania

Sedge Meadow

1.2 ac.

Lowland Seed Mix

Upland Seed Mix

Upland Seed Mix Lowland Seed Mix

USDA-NRCS-NGCE & USDA-FSA-APFO, Copyright:© 2016 Esri, DeLorme, NAVTEQ, TomTom

Date: 5/28/2020Vegetative Restoration Plan View

USDA is an equal opportunity provider, employer, and lender

Prepared with assistance from USDA-Natural Resources Conservation Service

Feet

Assisted By: DAN LUDWIG

USDA - NRCS

BERKS SERVICE CENTER

Conservation Practice Polygons Practice Schedule PLUs

Tree/Shrub Establishment (612) Wetland Restoration (657)

Sheets and Views
Albright's Mill Design REVISION4-COVER
Albright's Mill Design REVISION4-PV WEST
Albright's Mill Design REVISION4-PV East
Albright's Mill Design REVISION4-Construction Notes (1)
Albright's Mill Design REVISION4-A-A'
Albright's Mill Design REVISION4-B-B' - C-C'
Albright's Mill Design REVISION4-D-D' - E-E'
Albright's Mill Design REVISION4-E&S
Cover sheet, updated.pdf
Sheets and Views
Cover
Engineer's Estimate_Albrights Mill WRE UPDATED.pdf
Sheet1
cover sheet - albrigjts.pdf
Sheets and Views
Cover
e&s plan sans note about diverting upslope runoff.pdf
Sheets and Views
E&S
2020-06-04T10:57:03-0400
PETER VANDERSTAPPEN
2020-06-04T14:04:34-0400
TIMOTHY PETERS

File details come from the government source that posted it. Updated .