This document is a Justification and Approval (J&A) for a sole source contract award over the Simplified Acquisition Threshold. The Department of Veterans Affairs (VA) is upgrading the Building Automation System (BAS) at the Fort Harrison VA Medical Center from a Johnson Controls system to a Schneider Electric EcoStruxure BAS. The total estimated value of the project is . The period of performance is 280 calendar days. The statutory authority permitting other than full and open competition is that the Schneider Electric BAS is proprietary and requires Facility Improvement Corporation (FICO), the sole authorized Schneider Electric servicer and installer for the Fort Harrison region, to perform the work to ensure the health and continuity of the BAS and protect equipment warranties.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25924C0093_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAPG Part 819.7008/7009 Sole Source Awards to SDVOSB/VOSB Page 1 of 4 Revision: 02 Effective Date: 04/15/2023
DEPARTMENT OF VETERANS AFFAIRS
Justification and Approval (J&A) For
Other Than Full and Open Competition (>SAT)
Acquisition Plan Action ID: 36C259-23-AP-4095 JOFOC Tracker: FY-NCO 19-464
1. Contracting Activity: Department of Veterans Affairs Network Contracting Office
19. 6162 S. Willow Dr., Suite 300 Greenwood Village, CO 80111.
Organizational Activity: Department of Veterans Affairs Ft. Harrison VA Medical Center 3687 Veterans Drive, Ft. Harrison, MT 59636. Funding provided through NRM process for this project (436-24-10).
2. Nature and/or Description of the Action Being Approved: This acquisition is for the replacement of the Building Automation System (BAS) from a Johnson Controls BAS to a Schneider Electric EcoStruxure BAS. Due to proprietary reasons the contract will be a firm Fixed Price (FFP) contract with Facility Improvement Corporation (FICO) an authorized dealer and installer of Schneider Electric.
3. : The Fort Harrison VA Medical Center has a need for construction services for the upgrade and installation of the facility Building Automation System (BAS). This is phase 2 of this overall facility building automation system upgrade; FICO was previously awarded and is currently installing phase 1 of this project. Building 154 has antiquated and outdated Johnson Controls BAS technology (over twenty years old) and has exceeded its useful life. Conversion to a state-of-the-art Schneider electric BAS system is required to ensure Building 154 is updated to maintain compatibility within the Ft. Harrison VAMC campus. Currently the campus is 85% Schneider Electric, and 15% outdated Johnson Controls. The Schneider Electric BAS system is a critical facility system which acts as the central nervous system and branches out to peripherals which provide feedback data which controls air conditioning (A.C), heating, ventilation, boilers, chillers, temperature, and humidity.
This is vital to ensuring correct optimal condition to operating rooms (OR) and compounding of chemicals in the pharmacy as well as other clinical spaces. The project includes the installation, start-up, and programing of all mechanical equipment associated with this project.
The total estimated value of this project is . The period of performance is anticipated at 280 calendar days from the issuance of the Notice to Proceed
(NTP).
VHAPG Part 819.7008/7009 Sole Source Awards to SDVOSB/VOSB Page 2 of 4 Revision: 02 Effective Date: 04/15/2023
4. Statutory Authority Permitting Other than Full and Open Competition:
(X) (1) Only one Responsible Source and no Other Supplies or Services will Satisfy Agency Requirements per 41 USC § 3304(a)(1) as implemented by FAR 6.302-1;
( ) (2) Unusual and Compelling Urgency per 41 USC § 3304(a)(2) as implemented by FAR 6.302-2;
( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;
( )(4) International Agreement per 41 USC §3304(a)(5) as implemented by FAR 6.302-4;
( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by
FAR 6.302-5;
( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;
( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;
5. and/or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): Facility Improvement Corporation (FICO) is the sole service provider and installer for Schneider Electrical for the Ft. Harrison, Montana region. The BAS is comprised of proprietary hardware and software that controls the operation of the facility mechanical systems (provides automated control of the HVAC as well as several ancillary systems).
The (BAS) is networked throughout the entire Fort Harrison VAMC facility. The reliability of the BAS is vital to maintaining proper operation of the facility. Failure of the BAS would adversely affect patient access to care. The BAS utilizes proprietary hardware and software to control building operation. Installing another system puts the VA at risk by having to maintain two systems. Additionally, outside vendors interfacing with the Schneider Electric BAS will void existing software and hardware warranties from Schneider Electric.
This project will add equipment such as Air-Handling Units (AHU), Remote Terminal Units (RTU), Heat Recovery Unit (HRU), Chiller, Heat Exchangers, Variable Air Volume (VAV) Controllers, Dry Coolers, Fin Tubes, Convector, and Heaters. The added equipment will be controlled by the Schneider BAS. Control of the added equipment requires both hardware and software modifications. Thus, FICO is the sole vendor qualified and authorized in the State of Montana by Schneider Electric to install their systems, ensuring the health and continuity of the BAS while protecting equipment warranty.
6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: Additional efforts were made by requesting a list of authorized Schneider Electric Servicers and/or installers October 24, 2023, in which Schneider Electric responded specifically stating Facility Improvement Corporation (FICO) is the sole authorized Schneider Electric servicer and/or installer for the Ft. Harrison, Montana VA Medical Center.