P03 FAR 808.405-6 LSJ MPT-SAT COS.pdf
PDF 163 KB Posted
- Solicitation number
- 36C26123F0045
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GS-07F-0171W 36C26123F0045_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for Limiting Sources for Micro Purchase Threshold up to the SAT
DEPARTMENT OF VETERANS AFFAIRS
FAR 8 – Justification for Limiting Sources (LSJ) For
Limiting Sources (<SAT)
Acquisition Plan Action ID: 36C261 22 AP 4438 JOFOC Tracker # NCO21 2022 10 31T15_39_10
1. Contracting Activity: Department of Veterans Affairs, Network Contracting Office 21 located at 5342 Dudley Boulevard, Bldg. 209, McClellan Park, CA 95652 in support of the VA San Francisco Healthcare System Engineering Services located at 4150 Clement Street, San Francisco, CA 94121. Funding is attached to 2237 #662 23 1 6048 0004.
2. Description of Action: The required services are for HVAC Systems water treatment services and support. The resulting contract will be a firm fixed price task order against the Vendor’s GSA Schedule contract listed below. The Vendor is a Small Business Administration certified 8(a) Small Business. This is a new requirement.
Order against: FSS Contract Number: GS 07F 0171W
Name of Proposed Contractor: SUNGRO PRODUCTS, LL Street Address: 810 E 18TH Street City, State, Zip: LOS ANGELES, CA 90021 30 Phone: 213 747 4125
3. Description of Supplies or Services:
The estimated value of the proposed action is $157,260.00.
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, cooling, and boiler chemical water treatment service for the SFVAHCS. This contract encompasses HVAC and boiler systems located 4150 Clement St., San Francisco, CA 94121.
The objective for performance under this contract is to provide the best practical chemical water treatment to reduce corrosion rate and mitigate legionella bacterial growth associated with the HVAC and Boiler closed loop systems and cooling towers. Consulting and SystemModernization:
Monthly reports shall contain a short summary of such suggestions and note any adjustments to chemical feed rates. Recommendations for other than minor changes to the VA’s systems shall require stand alone reports.
Justification for Limiting Sources for Micro Purchase Threshold up to the SAT
The Contractor shall provide Water Chemistry Training to all Boiler Plant Operators and other select Operations and Maintenance personnel.
4. Authority:
Order Against FSS: Authority of the Multiple Award Schedule Program, Title III of the Federal Property and Administrative Services Act of 1949 (41 USC 251, et seq.); Title 40 USC 501, Services for Executive Agencies; and Section 803 of the National Defense Authorization Act of 2002 (PL 107 107) and implemented by FAR 8.405 6. Mark the applicable exception:
An urgent and compelling need exists, and following the procedures would result in unacceptable delays(FAR 8.405 6(a)(1)(i)(A);
Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized;
(FAR 8.405 6(a)(1)(i)(B));
In the interest of economy and efficiency, the new work is a logical follow on to an original Federal Supply Schedule order and the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures. The original order was not previously issued under sole source or limited sources procedures (FAR 8.405 6(a)(1)(i)(C)); or
Items peculiar to one manufacturer. An item peculiar to one manufacturer can be a particular brand name, product, or a feature of a product, peculiar to one manufacturer). A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer (FAR 8.405 6(b)).
5. Rationale/explanation to support cited authority: The SunGro system was put in place via a facilities construction contract. The VA has heavily invested in these boiler plant systems and it is not feasible or fiscally responsible to void the equipment warranties by going with an uncertified/unauthorized third party vendor for these services.
6. Note that this determination satisfies the requirements of FAR 8.405 6. The requirement to prepare a written justification IAW FAR 6.303 does not apply to Federal Supply Schedules.
Anna Norcross Contracting Officer Network Contracting Office 21
ANNA NORCROSS Digitally signed by ANNA NORCROSS Date: 2022.10.31 15:48:55 -07'00'
File details come from the government source that posted it. Updated .