These are design and technical specification drawings for replacing water softeners at the St. Cloud VA Hospital, dated January 28, 2025. The project involves comprehensive replacement of three existing water softener units, including removal of old equipment, installation of new tanks, and modifications to piping, control valves, and associated infrastructure. Key technical requirements include installing new softener tanks in the same locations as removed units, using durable materials that can withstand salt and moisture, modifying piping to accommodate new connections, installing new drain line flow controls, providing new gages and sample piping, and ensuring proper insulation of inlet and outlet piping. The drawings provide detailed photographic and schematic documentation of existing conditions, control valve configurations, and specific replacement components and procedures.

The project specifications outline precise technical requirements for the contractor, such as providing new drain line pipes with isolation ball valves, fabricating galvanized pipe supports, installing dielectric fittings, replacing isolation valves, and implementing new control units with 120-volt connections. The replacement work is designed to minimize service disruption, with the specification noting that water softeners should remain in service supplying water to the VA hospital at all times, except during specific valve replacement periods not exceeding four hours. The contractor will be responsible for temporary piping and unit programming to accommodate the replacement process.

View the file

Other files for this federal contract opportunity

Other files attached to Water Softeners and Installation for the St. Cloud VAHCS, newest first.
File Type Posted
S02. RFQ 36C26325Q0755.pdf PDF
S02. Contract Opportunities 36C26325Q0755_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHASTCPfeniM Text Box St. Cloud VA Hospital Replace Water Softeners 2025 January 28, 2025

VHASTCPfeniM Text Box

PS-00

Existing Conditions Plan Sheet

Plan Notes

7. New softeners control units to provide a cord allowing connection to the existing 120 volt outlets.

8. Contractor to remove and dispose of existing CAT 5 control wiring that is currently running between the softeners. This contractor is to furnish and install new control wiring as required for the new softener units.

9. The Replacement of Softeners work shall be scheduled and sequenced so two softeners will remain in service supplying water to the VA water tower at all times, except while replacing isolation valves, where softening system shutdown shall not exceed four hours. This contractor is responsible for all temporary piping and unit programming to accommodate.

VHASTCPfeniM Callout Drain Line Flow Control

VHASTCPfeniM Text Box Plan Notes

1. Remove and dispose of the three water softener units. Include the tanks, bases, resin, drain line, flexible connectors, control valve and all appurtenances.

2. Install new softener tanks in the same locations as removed tanks. Level tanks as necessary per the manufacturers instructions. Leveling material, if necessary, must be of a durable material able to withstand salt and moisture with out degrading.

3. Modify piping to connect and accommodate contractor provided braided stainless steel flexible connections, control valve and existing CPVC brine piping. Install new CPVC isolation valve on the brine line for each softener.

4. Furnish and install new type L copper drain line. Provide new drain flow control as necessary. Provide new ball valves for drain line isolation of each softener. Fabricate and install a floor mounted galvanized uni-strut pipe support for the vertical section of drain line. Install additional hangers per code requirements.

5. Install new gages and gage/sample piping. Piping detail of this assembly is to be same as the existing. See plan photo PS-4. Fabricate and install a galvanized uni-strut pipe support for the vertical section of the gage sample pipes.

6. Insulate inlet and outlet piping, including flexible connectors, up to the softener control valve. New insulation is to be equal to the existing insulation. Modify hangers as necessary to accommodate insulation.

St. Cloud VA Hospital Replace Water Softeners 2025 January 28, 2025

PS-1

Site Photo Plan Sheet

Callout Provide all new drain line pipe. Include a new isolation ball valve at each softener.

VHASTCPfeniM Text Box St. Cloud VA Hospital Replace Water Softeners 2025 January 28, 2025

VHASTCPfeniM Text Box

PS-2

Control Valve Photo Plan Sheet

VHASTCPfeniM Callout Softener specific flow meter (Typ.). Replace each with new meter.

VHASTCPfeniM Callout Provide Dialectric Fitting at each control valve connection

VHASTCPfeniM Line

VHASTCPfeniM Line

VHASTCPfeniM Callout Remove Isolation ball valve (typical)

VHASTCPfeniM Callout Replace isolation valves. (typical)

Line

Callout Drain Line Flow Device. Replace as required.

VHASTCPfeniM Text Box St. Cloud VA Hospital Replace Water Softeners 2025 January 28, 2025

VHASTCPfeniM

PS-3

Plan Notes

1. Install new gages and gage/sample piping. Piping detail of this assembly is to be same as the existing. See plan photo. Fabricate and install a galvanized uni-strut pipe support for the vertical section of the gage sample pipes. Softener tank is not to be used as a support anchor point.

2. Softener specific flow meter (Typ) Replace the three meters with new.

VHASTCPfeniM Text Box

PS-4

Gage/Sample-Meter Piping Photo Plan Sheet

VHASTCPfeniM Text Box St. Cloud VA Hospital Replace Water Softeners 2025 January 28, 2025

VHASTCPfeniM Text Box Note #1: Gages and Gage Sample Piping

VHASTCPfeniM

Note #2: Typical Softener Flow Meter

PS00_Existing Condition
PS01_Three Tanks with margin
PS02_Head with margin
PS03_Drain Device with Margin
PS04_Gage Meter Lines with Margins

File details come from the government source that posted it. Updated .