P01 Testing Schedule - Attachment A.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
J030--Generator Preventative Maintenance - Fargo VAMC Federal contract opportunity
Solicitation number
36C26322Q0417
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

View the file

Other files for this federal contract opportunity

Other files attached to J030--Generator Preventative Maintenance - Fargo VAMC, newest first.
File Type Posted
36C26322Q0417 0001.docx DOCX document
DOL WD 2015-4969 R18 12.27.2021.txt TXT text file
36C26322Q0417.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DEPARTMENT OF VETERANS AFFAIRS
Health Care Systems
2101 N Elm Street
Fargo, ND 58102-2498
INSPECTION AND SCHEDULED MAINTENANCE CHECKLIST
Generator Set LocationDate
Engine ModelSerial Number
Service Meter
Generator ModelSerial Number
Service LevelAnnual / Semi AnnualVolts
Name of Company
Name of Technician
Procedure X=Action R=Replace, if neededFrequency
S=Semiannually A=Annually #'s indicate hours
XCheckChangeCleanTestLevel 1
LUBRICATION SYSTEM
Oil LevelxxA
Oil ChangeRA
Oil Filter(s)RA
Oil PressurexA
Crankcase BreatherxA
COOLING SYSTEM
Antifreeze Protection LevelxS
AntifreezeRA
Rod Out Heat ExchangerxA
ThermostatsxS
Clean Exterior of RadiatorxA
Fan and Alternator Belt (Fan Drive Pulley)xxS
Water Pump(s)xS
Condition of Flexible Hoses and connectionxxS
Jacket Water HeaterxS
Inspect Duct Work, Clean LouversxxxA
Louver Motors and ControlsxxxA
EXHAUST SYSTEM
Excessive BackpressurexxA
Air FilterRxAs Needed
Air InletxS
TurbochargexS
Exhaust ManifoldxS
Exhaust SystmexS
Exhaust Systems Hangers and SupportsxA
EXHAUST SYSTEM conituedProcedure X=Action R=Replace, if neededFrequency
S=Semiannually A=Annually #'s indicate hours
XCheckChangeCleanTestLevel 1
Flexible Exhaust SectionxS
Starting MotorxS
Specific Gravity or State of ChargexxS
Charger and Charge RatexxS
ELECTRICAL SYSTEM
Wire chafing where subject to movementxxS
Tighten Control and Power Wiring ConnectionsxA
Operation of Safeties and AlarmsxxS
Boxes, Panels, and CabinetsxS
Circuit Breaker, fusesxxRxxA
Transfer Switch Main ContactsxxA
Calibration of Voltage-Sensing RelaysxxA
Wire Insulation Breakdownx5/500a
PRIME MOVER
Serivce Air CleanerRxS
Governor OilRA
Ignition System - Plugs, Points, Coil, Cap, Rotor, Secondary Wire InsulationxxRxxA
Choke Setting and Carburetor AdjustmentxS
Injector Pump and Injectors For Flow Rate Pressure and/or spray plattersxA
EPS at Minimum 30% Nameplate Ratingx3/4c
Valve Clearancesx3/500b
Torque Boltsx3/500b
GENERATOR
Brush Length, Appearance, Free to Move in HolderxxxS
Commentator and Slip RingsxxA
Rotor and StatorxxA
Bearing(s)xRA
Bearing GreasexRA
ExciterxxxA
Voltage RegulatorxxxA
Measure and Record Resistance Of windings with insulation tester (Megger)xA
Procedure X=Action R=Replace, if neededFrequency
S=Semiannually A=Annually #'s indicate hours
XCheckChangeCleanTestLevel 1
FUEL SYSTEM
Fuel TanksxS
Fuel Lines & ConnectionsxS
Water Trap/SeparatorxS
Governor & ControlxS
Fuel Filters - Primary & SecondaryRA
Fuel PressurexS
Tank Vents and overflow piping unobstructedxxA
PipingxA
ENGINE MONITORS & SAFETY CONTROLS
GaugesxxS
Safety ControlsxxxS
Remote annunciators/AlarmsxxS
CONTROL PANEL
Start Controls Main/AtoxxxS
VoltmeterxS
AmmeterxS
Frequency MeterxS
TRANSFER SWITCH
Checking ConnectionsxS
Inspection for overheatingxS
Checking for Excessive Contact ErosionxA
Removal of dust and dirtxxA
Replacement of Contacts, if necessayxxA
Tighten internal componentsxxA
LED indicators and remote control systems operationxA
Transfer switch main contactsxRxA
Tighten wiring connectionsxA
Thermographic temperature scanxA
Wire insulation deteriorationxA
BATTERY
InspectionxxS
Batteris - Specific GravityxS
Battery Maintenance FreeRAs Needed
Procedure X=Action R=Replace, if neededFrequency
S=Semiannually A=Annually #'s indicate hours
XCheckChangeCleanTestLevel 1
SWITCHGEAR
Check operation of timersxS
Check operation of remote start contactsxS
Check operation of in-phase checkxS
Check voltage drop across main normal and emergency contactsxS
Check for loose contactsxS
Visual inspection for evidence of arcing and or hot spotsxS
Replace PLC batteriesxRAs needed
Replace lamps as necessaryxS
Lubricate switchxS
a Every 5 years or 500 hoursb Every 3 years or 500 hoursc Every 3 years for 4 hours