About this file

This is a Statement of Work for an amendment to a federal construction project at the Lebanon VA Medical Center in Lebanon, Pennsylvania (Project #595-23-602). The amendment focuses on additional demolition work required for the "Pave and modify Loop and Parking Phase II" project.

The contractor shall provide all labor, materials, tools, equipment, permits, testing, and reports necessary to remove and repave the majority of the existing Building 17 parking lot. The scope includes major demolition of pavement, green spaces, curbs, stormwater management systems, electrical utilities, and other infrastructure as shown in the drawings and specifications, along with major reconstruction of roadways, curbs, stormwater systems, electrical systems, signage, and utilities. The contractor is responsible for maintaining NPDES permits and coordinating inspections with the Lebanon County Conservation District. The project objective is to improve the existing parking area and expand patient parking into green areas to increase capacity for both patients and staff.

The additional work required under this amendment includes removal of all paving to full depth, concrete curbs and sidewalks as noted on revised drawings, adjustment of valves, manhole lids, inlet tops, and metal lids to flush with finished grade, conversion of all stormwater structures to Type "M" inlet drain boxes (per Sheet CS502 detail 28), and restoration of the area to lawn per project specifications. There is no interior work included. The amendment shall be bid as the price to complete all exterior work, utility installation, stormwater management, and temporary traffic control measures and signage. Some work must be conducted outside normal business hours (Monday-Friday 0730 to 1630) to minimize disruptions to the medical center. All work must be completed within 365 calendar days from receipt of Notice to Proceed. The attachment includes revised bid plans (595-23-602 Bid Plans-Revise).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK:

Pave and modify Loop and Parking Phase II Project #595-23-602

Amendment for additional Demo

1. The scope of work shall generally consist of, but not limited to the following:

providing all labor, materials, tools, equipment, permits, testing, and reports required to remove and repave the majority of the existing building 17 parking lot at the Lebanon VA Medical Center, 1700 South Lincoln Ave., Lebanon, PA as defined by the drawings and specifications. Contractor shall be responsible to ensure all NPDES permits are maintained, and the Lebanon County Conservation District (LCCD) is notified when inspections are required. The intent of this project is to improve the existing parking area and expand patient parking into the green areas to increase capacity for both patients and staff. The project will include major demolition of large areas of pavement, green spaces, curbs, stormwater management systems, electrical, and other utilities that are as shown on drawings and specifications. There shall also be major reconstruction of roadways, curbs, stormwater, electrical, signage and other utilities that are as shown on drawings and specifications.

2. The additional work that shall be required for this amendment will include removal of all paving to full depth, concrete curbs and sidewalks noted on the revised drawing. Any valves, manhole lids, inlet tops and metal lids to be adjusted to flush with finished grade as required. All stormwater structures in the area are to be converted into a Type “M” inlet drain boxes (as per Sheet CS502 detail 28) and match finished grade. Area is to be restored to lawn in accordance with project specifications.

3. There is no interior work on this project.

4. This amendment shall be bid as the price to complete all exterior work, installation of utilities, stormwater management, provisions for the use of temporary traffic control measures and signage as identified in the drawings and specifications. Some tasks and/or work in certain locations shall be required to be conducted outside of normal business hours to minimize disruptions of the medical center (normal business hours are Monday-Friday 0730 to 1630). All work shall be completed within 365 calendar days from receipt of Notice to Proceed.