P01 SOW Modular Walls Reception Area Prosthetics.pdf

PDF 230 KB Posted

Attached to
7110-- DIRTT Demountable Wall Systems Federal contract opportunity
Solicitation number
36C24124Q0479
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a Statement of Work (SOW) for the procurement of modular, demountable architectural wall systems for a reception station and waiting room enclosure at the VA Boston Healthcare System Brockton Campus.

The key details are:

  • The contractor shall furnish, deliver, and install new modular, demountable wall systems to the second floor of Building 3 at the VA Boston Healthcare System Brockton campus, with delivery required within 8 weeks of contract award.
  • The wall system shall meet specific requirements for design, construction, materials, acoustics, and sustainability. Acceptable products include the DIRTT Environmental Solutions system or an "or equal" equivalent.
  • The contract will be awarded to the most advantageous response based on evaluation factors of price, past performance, delivery timeframe, and item availability.
  • This is a set-aside solicitation for Service-Disabled Veteran-Owned Small Businesses under NAICS code 337214, with a due date of 05/10/2024.

View the file

Other files for this federal contract opportunity

Other files attached to 7110-- DIRTT Demountable Wall Systems, newest first.
File Type Posted
36C24124Q0479.docx DOCX document
P01 VABHS BK BLDG 3 Prosthetics DIRTT Line Item.xlsx XLSX spreadsheet
P07 WD 20154053 R 26 12262023 BROCKTON MA PDF.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Prosthetics Services

Modular Demountable Wall Systems

12 April 2024

VA Boston Healthcare System

940 Belmont Street

Building 3 - Second Floor

Brockton, Massachusetts 02301

VA Boston Healthcare System Interior Design Brockton Campus – Mental Health Services Demountable Wall System

Page | 2

CONTENTS

I. Justification II. Scope of Work III. Bid Requirements IV. Furniture Requirements V. Other Considerations for Performance VI. Contractor Requirements VII. Place of Performance VIII. Period of Performance IX. Payment Schedule X. Non-personal Services Statement XI. Appendix (Drawings)

Page | 3

I. JUSTIFICATION:

The VA Boston Healthcare System’s Brockton Campus needs modular wall systems for a reception station and waiting room enclosure for the Prosthetics service line’s waiting area. The demountable walls described herein will provide a warm and welcoming “vet-centric” reception and waiting area. The transaction counters will allow MSA’s to check-in or call patients while preventing sensitive information from being overheard.

II.SCOPE OF WORK:

The selected contractor shall be required to furnish, deliver, and install new modular, demountable architectural wall systems to the second floor of Building 3, rooms A236 and A237 at VA Boston Healthcare Systems, Brockton campus. The timeframe for delivery receipt shall be no later than 7 weeks following award of contract, with coordination of specific dates mutually agreed upon by the VA Boston Healthcare System Engineering Department and the selected contractor.

The vendor shall field verify the space before placing a final order. This assembly shall be developed with the awarded vendor with use of the materials outlined within. The vendor responding to the solicitation shall provide the required furnishings as noted on the attached drawing, described in the performance-based technical specification, and described here within. The attached technical based specification describes the minimal materials, construction, and technical requirements.

III.BID REQUIREMENTS:

All bids shall be formatted appropriately as shown below to ensure a consistent basis for comparison:

Line Item Description Quantity Cost Extended (Item 1) (Guest Chairs (5) ($100) ($500)

Pieces Parts Fabric @ $60/yd.

Etc.)

Cost of item (as defined below, i.e. ‘DIRTT Demountable Wall Partition Assembly”) shall be wholly inclusive of all required components. DO NOT break out costs for any parts, pieces, or COMs in either the cost or extended cost columns.

• Comprehensive freight, installation, and any associated project management fees to be indicated as a single final line-item amount.

• All ‘Or Equal’ product bids must include a comprehensive technical package for review. The technical package shall include 2D and 3D drawings of the line items, cut sheets or other documentation supporting the item meets or exceeds all the indicated required characteristics.

Page | 4

IV. FURNITURE REQUIREMENTS:

Qty.2 DIRTT Environmental Solutions – Architectural Demountable Wall Systems ‘Or Equal’ Item 1: DIRTT demountable wall partition assemblies Item 2: Comprehensive project management, delivery and freight and installation.

Finish: Clear Anodized Aluminum Front Panels: Thermofoil Maple Reception Panels: Standard Scout #DC15 Chroma/DP15 Powder Hardware Finish: Brushed Stainless Steel Glass: 3/8” Tempered Clear Decorative Window Film: 3’ Band of 3M Dusted Crystal with Prosthetics Themed Images TBD by VA Cut Into Film Counters: Corian Rain Cloud Door Type: 4” Stile glass swing Door with decorative film Fabric Panels: Acoustical Panel Surfaces to be Carnegie Xorel Twine #6217-35 Power & Data: QTY. 2 Quad data and 2 Quad electrical receptacles Lock: To have removable core, large format, 6 pin Corbin Russwin. Core key & cylinder tool needed if shipped with construction cores.

Page | 5

Entrance Lock: Electric Mortise Schalage L909 Xseries electrified mortise & accept Corbin Russwin large format removeable core. Lock function, F05, entry via card access or key and always exit from suite. Levers 06, both sides, finish 626

Hinges: 5 Knuckle, Heavy Duty 4.5” Stainless Steel Dimensions: Corridor 90” High x 104 ½”w, Reception 103”h x 116 ½”w +/- VIF

Or Equal Salient Characteristics:

Demountable Wall System Technical Specifications Requirements and configurations shall be in accordance with the layouts and typical types shown in drawings and specified herein. Components and hardware shall be provided by a single manufacturer and shall be a standard commercial product as shown in the vendor’s pricelist. Although such work is not specifically indicated, furnish, and install all supplementary or miscellaneous items, appurtenances, and devices incidental to, or necessary for sound, secure and complete installation.

Demountable Wall General Requirements are as follows:

1. Lines should offer Contemporary, Transitional or Traditional design element options.

2. Demountable walls shall meet or exceed the minimum fire code ratings as applicable to each project and in accordance with ASTM E-84.

3. Manufacturer shall certify that wall products have been tested with ASTM E 72-98 (Transverse load capacity), BIFMA X-5.6 (load bearing capacity) and all applicable tests.

4. The final constructed panel system needs to provide an STC rating of 50 or better, where loud speech can be heard faintly.

Construction and Materials

1. Panels and framework shall be unitized (not stick built), and non-progressive to allow for flexible reconfiguration including the removal or relocation of panels and sliding doors on the same module.

2. All panel components including frames, glass frames, door frames, base trim, ceiling trim and tracks shall be cold-formed steel or extruded aluminum. All framework, exposed steel or aluminum, shall be powder-coat finished.

3. Panels shall include other material selections such as metals and tempered glass.

4. Panels shall be 4” thick, shall have panels available up to 60” with 1/16” minimum nominal widths available. Panels shall be precisely installed and include the option to provide filler panels when necessary. Panel heights shall be available up to 120” high, and allow for seismic bracing where code requires.

5. Panels shall be stackable to accommodate ceiling height changes and future panel type changes.

6. Panels shall have the ability to connect to and release from the base building and ceiling without damage.

7. Panels shall have the option to be designed in a radius application.

Page | 6

8. Each panel shall have integrated leveling devices and have a minimum of ½” adjustability at the ceiling and 1” adjustability at the floor.

9. In general, solid panels shall provide an overall sound transmission class of no less than a 50 STC rating and glass panels no less than a 40 STC rating. Minimum STC ratings will be evaluated on a project-by-project basis. Manufacturer shall be able to provide documentation regarding STC ratings for their products.

Wall Surfaces

1. A wide variety of wall surfaces to be available including fabric, wood veneer, plastic laminate, painted MDF, glass, Plexiglas, tempered glass, resin, dry erase board, metal and custom paint options.

2. Surface skins shall be segmented or monolithic, and hung either vertically or horizontally.

3. Wall surfaces shall be interchangeable with the ability to apply a new skin/finish.

4. Panels shall have no more than a ¼” reveal between adjacent panels.

5. STC ratings shall be available up to 50 for solid walls, and 40 for glass walls. Cut panels shall achieve the same STC ratings.

6. Acoustical walls that mount directly to existing walls shall achieve a minimum .80

NRC.

a. STC = Sound Transmission Coefficient

b. NRC = Noise Reduction Coefficient

Glass

1. Glazing shall comply with the Federal Safety Standard for Architectural Glazing Materials (16 CFR Part 1201).

2. Glazing shall be tempered.

3. Options shall include clear, frosted, patterned, custom etching, back painted, and shall be available for use on both panels and doors.

4. Glass shall be factory installed.

Storage Options

1. Panels shall be capable of hanging or mounting any manufacturer’s furniture using vertical reveals and brackets or other approved methods. Reveals shall have the ability to be finished off for a monolithic aesthetic when furniture is not installed.

2. Furniture shall have the capability to be hung off the module at various heights.

Installation

1. All materials, labor, and equipment needed for a turn-key installation shall be installed by a factory approved installer.

2. Partitions shall be installed rigid, level, plumb, and aligned. Install seals at all connections including floors, ceilings, fixed walls, columns, and other surfaces.

Partitions shall be securely attached to the building where applicable.

3. Partitions shall have the ability to begin at the building perimeter, windows, or columns.

Page | 7

4. Existing walls, hard cap ceilings, ceiling suspension systems, or floors shall not be altered or damaged in any way.

Sustainability

1. The system shall be GREENGUARD certified, Cradle to Cradle Certified, or SMART certified.

2. SCS Indoor Advantage Gold certification.

3. Shall contain recycled content, composed of rapidly renewable materials, and manufacturer re-use or recycling program in place.

4. Insulation shall be made of 80% post-consumer recycled content.

5. Aluminum components shall be of 25% pre-consumer recycled content.

6. All components and materials shall be 100% recyclable.

7. Finish coats shall be free of VOC’s and HAP’s.

8. Materials shall be free of urea formaldehyde.

9. Finish shall not require an oven for curing.

10. FSC certified wood shall be available.

11. Product provided under this specification shall be at least 65% recyclable at the end of its useful life and be GREENGUARD certified as a low-emitting product that meets current indoor air quality standards.

Warranty

1. Warranty for all products shall be for a period of 10 years with a 24 hour-per day for administrative product. Parts and labor included. Limitations or exclusions involving materials and components such as lamps and ballasts, wood veneer, and upholstery fabric is acceptable.

2. Substitutions shall be approved by the VA Interior Designer.

Note: Vendor shall provide hard copy data sheets and technical information on the substituted products. Data sheets shall include picture or rendering, make and exact model number, description, cut sheet, price list, and technical information on why substituted item meets SOW requirements. Technical data shall be provided within 10 days of bid submission. Failure to provide all information and samples will be considered an incomplete bid package.

V. OTHER CONSIDERATIONS FOR PROPOSAL

1. Dealer shall have in-house services available including interior design, sales, installation, and warehousing capability.

2. Dealer/manufacturer shall have the ability to train and demonstrate to owner facilities and maintenance staff how to adjust, operate, and maintain demountable partitions.

3. Dealer/Manufacturer shall have the following professional associations:

a. Efficient Data Centers 7x24 Exchange

b. AFCOM

c. BICSI

4. Lead-time is a critical factor. Bidders shall present their best lead-time to design, Page | 8 manufacture, ship, and install furniture.

6. If bidder is not the manufacturer of all major components, such as core, surfaces, modular walls, and lift solutions, then the bidder shall specify which manufacturer is being used and include their reference information and experience to determine qualified status.

VI. CONTRACTOR REQUIREMENTS

The contractor shall perform all work under this contract in strict accordance with all safety codes to eliminate the possibility of damage or injury to patients, personnel and equipment or building structures.

Delivery, Assembly, Installation and Storage

1. The contractor shall not be alone in the designated installation space and shall be always escorted by a VA employee.

2. Point of Contact (POC) for delivery and installation is Louann Wright (774) 826 – 1238 or 774-273-3036.

3. Track all orders to ensure timely delivery and communicate issues to COR.

4. The contractor shall be contacted by the POC at least two weeks prior to date that services are to begin. Pick-up, delivery and installation services are expected to be performed per future information. The contractor shall coordinate delivery times with the POC to confirm that the building is ready for delivery of furnishings. Once confirmation is received, the contractor shall provide the POC with a minimum of 72 hours notification as to date and time that the trucks and crews will be arriving.

5. In the event there is a delay in install, the contractor shall notify the Government POC immediately.

6. Furniture delivery not to interfere with the operation of the facility. The contractor shall coordinate the work of the project with the COR to ensure minimal disruption of the Medical Center operations.

7. Foreman shall be available to supervise all installation.

8. Furniture layout and shop drawings will be provided before award, the contractor shall place items in building as identified in the furniture layout. Final furniture layout shall be determined by COR. Furniture layout shall meet the requirements and design intent of ABA, NFPA, OSHA, BIFMA, CAL 117, VA, for all accessibility, life safety, occupational safety, VA, and federal requirements for a business

9. All products shall be installed by manufacturer certified installers with experience working in healthcare environments.

10. The contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers’ instructions. All uncrated material shall be removed from VA property by the contractor.

11. If the contractor is unable to complete the assembly and placement of all unloaded items before the end of the workday, the contractor shall be responsible for moving these items to a secure location, until the next available workday. The contractor shall be responsible for moving the items from the overnight storage site to

Page | 9 its designated position in the building. The contractor shall coordinate with the POC as to where any excess items are to be stored. The contractor shall be responsible for delivery of excess items to storage area(s) designated by the POC.

12. post-installation “walk-through” shall be required by manufacturer’s Regional Installation Manager and Senior Account Manager to ascertain full compliance to the floor plan, console design, and materials specified. Any inconsistencies will be noted and shall be scheduled for completion prior to sign off of the project.

13. Repair or replace damaged products at the discretion of COR.

Product Documentation

1. Vendor shall provide furniture cut sheets, warranty, and delivery schedule. Vendor shall provide O&M manual including warranty, care, and manufacturer contact information to COR at completion of project.

Record Management Statement The following standard items relate to records generated in executing the contract and should be included in a typical procurement contract:

1. Citations to pertinent laws, codes, and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C.

552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the

U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any

Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.)

Page | 10

8. and all supporting documentation created as part of this contract.

Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

9. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

10. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

11. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information

Protection of Property

1. The contractor shall protect all items from damage. The contractor shall take precautions against damage to the buildings, grounds and furnishings. The contractor shall repair or replace any items related to buildings or grounds damaged accidentally, or on purpose due to actions by the contractor, utilizing materials of the same quality, size, grade and color, to match existing work.

2. The contractor shall perform an inspection of the buildings and grounds with the POC prior to commencing work. To ensure the contractor shall be able to repair or replace any items, components, buildings, or grounds damaged due to negligence and/or actions taken by the contractor. The source of all repairs beyond simple surface cleaning shall be the responsibility of the facility construction contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence of the POC is required before the contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade and color to match adjacent existing work.

3. The contractor shall be responsible for security of the areas in which the work is being performed prior to completion and transfer to the Government. The contractor shall maintain accountability and control of any keys provided and shall return them to the POC upon completion of the work.

Page | 11

4. Material handling equipment shall have rubber wheels.

5. Assure that adjoining work is not damaged by installation of this work.

6. Provide temporary protection as required and repair all damage to such work.

Clean-up

1. The contractor shall be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance from the contractor shall not occur until all trash connected with furniture installation is removed from the site.

2. Recyclable cardboard products shall be disposed of in accordance with applicable statutes, in respective containers.

3. Packing materials shall not be stored in the buildings for any period exceeding 24 hours.

4. Personal trash (food wrappers, drink containers, etc.,) shall be removed from the site daily by the contractor.

5. Immediately after installation and adjustment; clean all surfaces to remove all marks, soil, and foreign matter. Just prior to substantial completion, recheck all components and perform all required additional cleaning.

Installer Qualifications

1. Furnish proof of familiarity with equipment to be installed.

2. Provide list of at least three previous projects, giving names of projects, scope, and name and telephone number of individuals at facility to contact.

3. Furnish proof of financial and technical resources to assure prompt performance in delivery and installation and in-service training of hospital personnel.

4. Provide competent supervision and installation personnel.

Conformance Standards Contractor shall provide installation service and ensure that the equipment functions in accordance with the equipment manufacturer’s technical performance specifications. Contractor shall conform to all regulations to include but not be limited to federal, state, and local governing any chemicals, equipment or work which may be used or performed in the work under this contract

Certified Trained Technicians & Key Personnel The installation and testing shall be performed by vendor trained personnel in accordance with the agreement. In addition, each report must, at a minimum, document the following data legibly and in complete detail.

A. Name of contractor and contract number.

B. Name of FSE who performed services.

C. Contractor service ESR number/log number.

D. Date, time (starting and ending), equipment downtime and hours on-site

Page | 12 for service call.

E. Identification of equipment to be serviced:

1) Inventory ID number,

2) Manufacturer's name,

3) Device name,

4) Model number,

5) Serial number,

6) Any other manufacturer's identification numbers.

F. Itemized Description of Service Performed (including, if applicable, costs associated with after normal working hour services) including:

1) Labor and Travel,

2) Parts (with part numbers),

3) Materials and Circuit Location of problem/corrective action.

G. Signatures:

1) FSE performing services described

2) Authorized VA Employee who witnessed service described.

NOTE: - Any additional charges claimed must be approved by the COR or designated representative before service is completed!

Reporting Requirements The Contractor shall be required to report to the Police Office to check in. This check- in is mandatory. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to check out with Engineering and submit the ESR(s) to the COR or designated representative. ALL ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR or designated representative for an "authorization signature". If COR or designated representative is unavailable, a signed, authorized copy of the ESR will be left with the user.

Identification, Parking, Smoking & VA Regulations The Contractor's FSE's shall always wear visible identification while on the premises of the VAMC. The Contractor shall park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court

Page | 13

Security Requirements All contractor personnel shall obtain a short-term identification badge issued by the COR or government designated representative. Such badge shall be worn by the individual and prominently always displayed while on VA Property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. To obtain a short-term identification badge, contractor personnel shall present to the COR a valid (non-expired) photo identification issued by a US federal, state, or local government agency.

Source Quality Control

1. Systems furniture manufacturer shall have minimum 5 years of continuous experience in manufacture of all systems components and accessories.

2. Manufacturer shall furnish proof of successful completion of at least three projects of similar scope within that time; furnish names of projects, scope, and name and telephone number of individual at facility to contact.

3. Furnish proof of financial and technical resources to assure prompt performance in production and delivery The identified Sole Source Vendor shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in standard acquisition guidelines. Per the VA handbook 6500.6, no VA sensitive information will be transferred, shared, or stored with said vendor. As such, no additional mechanisms will be needed to ensure the protection of information.

VII. PLACE OF PERFORMANCE

The contractor shall coordinate delivery and installation of furnishings at the VA Medical Center, Brockton Campus, Building 3, Second Floor. Work hours will be between 3:00 PM and 10:00 PM, Monday – Friday or Saturday 8:00am-4:30pm.

Loading dock and freight elevator are made available with appropriate advance notice and coordination.

VIII. PERIOD OF PERFORMANCE

The vendor is on notice that time is of the essence in the performance of this contract. The timeframe for delivery receipt shall be no later than 8 weeks following award of contract, with coordination of specific dates mutually agreed upon by VA Boston Healthcare System Brockton Campus and the selected contractor. Vendor supplied storage for up to 60 days may be required.

IX. PAYMENT SCHEDULE

The contractor shall bill on completion and acceptance of the work. Invoices will be paid upon the completion and acceptance of the procured equipment. Invoices shall include at a minimum, the following information: Contract Number, Purchase Order/Task Order Number, Contractor Name, and Item(s) installed.

Page | 14

Additional Charges There shall be no additional charge for time spent at the site (during, or after the normal hours of coverage) awaiting the arrival of additional FSE and/or delivery of parts.

X. NON-PERSONAL SERVICES STATEMENT

The contractor employees performing services under this order shall be controlled and always supervised by management personnel of the contractor. The contractor management shall ensure that employees properly comply with the performance work standards outlined in the SOW. The contractor employees shall perform their duties independent of, and with occasional supervision of VA COR. The tasks, duties, and responsibilities set forth in the SOW may not be interpreted or implemented in any manner that results in any contractor creating or modifying Federal policy, obligating the appropriate funds for the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating contracting regulations.