This document is an enclosure to a Justification & Approval (J&A) No. N10426C0006P00014, detailing contract change orders (CCOs) for maintenance and repair work on the vessel MERCY.

The document specifies four contract change orders with the following scope: CCO 107 directs preservation and repair of the Pri-Fly Mast, including work on the cable raceway, yard arm support, antenna foundation, and renewal of Port and Starboard beacon light foundations. CCO 306 requires repair of the Fuel Oil Transfer Pump Strainer Drain Valve through spool renewal, including fabrication, installation, pressure testing, and operational testing. CCO 323 calls for provision of 48 new immersion suits. CCO 329 requires pre-closeout tank internal repairs and preservation in the Antiroll Tank and No. 2 Starboard Side Water Ballast (SWB) tanks, including renewal of corroded sounding tubes, replacement of a deteriorated manhole cover and broken stud, and epoxy coating preservation of newly repaired areas. All change orders require the contractor to provide necessary labor, materials, and equipment to complete the specified work.

View the file

Other files

File Type Posted
P00007 MERCY ROH New Work JA_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure to J&A No. N10426C0006P00014 CCO WI Description/Justification

107 Pri-Fly Mast Preservation and Repair

This contract change order directs the contractor to provide all necessary labor, materials, and equipment to perform preservation and repairs on the Pri-Fly Mast for the vessel MERCY. The work includes preserving deteriorated areas on the cable raceway, yard arm support, and antenna foundation, as well as renewing the Port and Stbd beacon light foundations.

Repair Fuel Oil Transfer Pump Strainer Drain Valve (Spool renewal)

This contract change order requires the contractor to provide all labor, material, and equipment to repair the Fuel Oil Transfer Pump Strainer Drain Valve by renewing the associated spool piece. The work involves fabricating and installing a new spool, pressure testing the system, and performing an operational test to complete the repair.

323 Renew Immersion Suits x 48 Provide 48 new immersion suits.

Pre-Closeout Tank Internal Repairs in Antiroll and No2 Stbd SWB REV 1

Provide all necessary labor, materials, and equipment to perform additional structural repairs and preservation in various tanks prior to final closeout. The work consists of renewing corroded sounding tubes in Antiroll Tank 6-64-0 and No4 SWB 7-60-0, replacing a deteriorated manhole cover and broken stud in No2 Stbd SWB, and preserving all newly repaired areas with epoxy coatings.