Summary of Fire Station 16B- Temporary Facility IFQ/B Package
This Invitation for Quote/Bid (IFQ/B) package is issued by Palm Beach County's Capital Improvements Division and Facilities Development & Operations Department for the installation of a temporary fire station facility. The project involves furnishing all labor, materials, equipment, permits, and supervision necessary to relocate and install a temporary trailer and associated appurtenances to serve as Fire Station 16B. The trailer will be relocated from its current location at 8130 N. Jog Road, West Palm Beach, Florida to the project site at 12180 Alternate A1A, Palm Beach Gardens, Florida. Work scope includes safe disconnection of existing utilities, trailer preparation and transportation, site placement, leveling, anchoring, utility reconnection, and all activities necessary to place the facility into operational service. A mandatory pre-bid meeting is scheduled for 10:00 a.m. on June 22, 2026 at Fire Station 16B's main entrance. Bids are due by 2:00 p.m. on July 16, 2026 and will be opened at a public meeting. The contractor must substantially complete all work within 180 calendar days from the Notice to Proceed. The contract is awarded under Palm Beach County's Annual Contract - Minor Construction Services.
Qualified contractors on the Annual Contract - Minor Construction Services are eligible to submit bids; qualification applications must be submitted at least ten days before the bid due date. If the bid amount is $200,000 or more, bid security equal to five percent of the bid price and a public construction bond equal to 100 percent of the work order are required. Liquidated damages accrue at $180 per day for failure to achieve substantial completion within the specified timeframe. A mandatory 25 percent Small Business Enterprise (SBE) participation goal is established, with waivers available upon demonstration of adequate Good Faith Efforts. Contractors must submit SBE Schedule 1 (listing all proposed subcontractors and SBE participation) and Schedule 2 (Letters of Intent from subcontractors). Contractors must execute a Human Trafficking Affidavit and comply with digital accessibility standards under Title II of the Americans with Disabilities Act. All contractor employees must obtain Critical Facilities Background Checks and CJI Facilities Background Checks prior to work commencement. Questions must be submitted in writing to FDO-CID-Bids@pbc.gov at least seven days prior to the bid due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-2026-000054 Advertisement.pdf | ||
| P-2026-000054 VSS Request Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFQ/B Page 1 Form Rev. 04/02/26 Invitation for Quote/Bid - NonFederal
INVITATION FOR QUOTE/BID
ANNUAL CONTRACT
DATE:
May 29, 2026
SENT TO:
Qualified Contractors
On the Annual Contract - Minor Construction Services
SENT FROM: Capital Improvements Division
SENDER: Sunil Jagoo, Project Manager
PHONE: (561)233-0271
PROJECT NAME: Fire Station 16B- Temporary Facility
PROJECT NUMBER:
P-2026-000054
Mandatory Pre-Bid Conference. There will be a Mandatory Pre-Bid Meeting at Fire
Station 16B (meet at main entrance), located at 12180 Alternate A1A, Palm Beach
Gardens, FL at 10:00 a.m. on June 22, 2026. The purpose of this pre-bid meeting will be to review the requirements for the project described in this Invitation for Quote/Bid. You must attend this meeting if you intend to bid this work.
The work is to be done under the terms and conditions of Palm Beach County’s
Annual Contract - Minor Construction Services as supplemented by this Invitation for Quote/Bid.
Questions must be e-mailed to FDO-CID-Bids@pbc.gov at least seven (7) calendar days prior to the bid due date. Only questions received in writing will be responded to regarding this Invitation for Quote/Bid.
Facilities Development &
Operations Department
2633 Vista Parkway
West Palm Beach, FL 33411
Telephone - (561) 233-0200
Palm Beach County
Board of County
Commissioners
Sara Baxter, Mayor
Marci Woodward, Vice Mayor
Maria G. Marino
Gregg K. Weiss
Joel G. Flores
Maria Sachs
Bobby Powell Jr.
County Administrator
Joseph Abruzzo
“An Equal Opportunity
Employer” file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov
IFQ/B Page 2
Submitting the Quote/Bid Package
The Quote/Bid Package must be enclosed in a sealed opaque envelope. The envelope must be addressed as follows:
Project Name: Fire Station 16B- Temporary Facility
Project Number: P-2026-000054
Capital Improvements Division
2633 Vista Parkway
West Palm Beach, Florida 33411
Attention:
No responsibility will be attached to the Owner for premature opening of or failure to open a quote/bid not properly identified. If the quote/bid is sent by mail, the sealed envelope must be enclosed in a separate mailing with the notation "SEALED QUOTE/BID ENCLOSED" on the face thereof.
PROJECT NO.: P-2026-000054
*DUE: July 16, 2026 by 2:00 p.m.
* The Quotes/Bids received by this time will be opened at this time at a public meeting at the below address.
RETURN TO: Capital Improvements Division
2633 Vista Parkway
West Palm Beach, FL 33411
Qualification of Contractors. In order to submit a quote/bid in response to this IFQ/B, a contractor must be qualified under the Annual Contract - Minor Construction Services. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project # in the subject line to: FDO-CID-Bids@pbc.gov or call (561) 233-0261. Qualification applications may also be downloaded from the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4. The contractor must submit the Qualification
Application at least 10 days before the Quote/Bid Due Date in order for its quote/bid to be considered.
file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
IFQ/B Page 3
1. SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to install a temporary trailer and all the necessary appurtenances necessary for a temporary Fire Station per the project requirements provided by Capital Improvements
Division in this Invitation for Quote/Bid at Attachment “C” and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm Beach County’s Annual Contract - Minor
Construction Services, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference.
2. SCHEDULE OF TIME FOR COMPLETION. The time of completion for this Project will be as follows: The Contractor must substantially complete the work within one hundred twenty (180) calendar days from the Notice to Proceed from Owner.
3. LIQUIDATED DAMAGES. Liquidated Damages are $180/day for failure to achieve certification of
Substantial Completion within the Work Order time or approved extension thereof.
4. BID SECURITY AND PUBLIC CONSTRUCTION BOND. Bid Security and Public Construction
Bond are required for this Project in accordance with Section 5.2 of the Instructions to Bidders of the Annual
Contract as follows:
Bid Security. If Bid is $200,000 or over, this Bid must be accompanied by a Bid Security (in the form of, at Bidder's option, cashier's check, certified check, money order or Bid Bond in favor of the County) in the amount of at least five percent (5%) of the bid price, see Section 5.2.2 of the
Instructions to Bidders of the Annual Contract for detailed requirements regarding Bid Security and Attachment “B”.
Public Construction Bond. If Bid is $200,000 or over (or if cumulative open work orders are
$200,000 or over), then prior to execution of a Work Order, and not later than fourteen (14) calendar days after notification from Owner, the successful Bidder must furnish a Public
Construction Bond in the amount of 100% of the Work Order and Guarantee, see Section 5.2.3 of the Instructions to Bidders of the Annual Contract for detailed requirements regarding the Public
Construction Bond and Guarantee.
5. Small Business Development (SBD) Program. Section 5.3 of the Instruction to Bidders of the Annual
Contract sets out the requirements of the County’s Small Business Development Program. All Bidders are required to submit with their bid the appropriate SBD Program schedules. SBD Schedules to be submitted with the quote/bid are as follows:
a) Schedule 1 - List of All Proposed Subcontractors, including SBE Participation. A completed Schedule 1 submitted by the prime shall list the names of all subcontractors, intended to be used in performance of the contract, if awarded. The total proposed percentage of SBE participation shall also be included on this form. This schedule must also be used if an SBE prime bidder is performing any portion of this contract with their work force.
b) Schedule(s) 2 - Letter(s) of Intent to Perform as a Subcontractor, including SBE
Subcontractors. A completed Schedule 2 is a binding agreement between the prime contractor and the subcontractor (of any tier) and should be treated as such. Each Schedule 2 shall be properly executed by the Prime Contractor and proposed subcontractor. If the Contractor is an SBE, a Schedule 2 shall be submitted to document work to be performed by its workforce.
IFQ/B Page 4
Completed and submitted SBD forms are incorporated into and made a part of the Contract Documents.
Attachment “A” identifies the affirmative procurement initiatives (APIs) applicable to this Invitation for Quote/Bid.
If Bidder is unable to comply with the API requirements as set forth in Attachment “A”, Bidder shall submit a request for a waiver or partial waiver with its bid by the quote/bid due date. Each waiver request shall include documentation demonstrating the Bidder undertook satisfactory Good Faith
Efforts, as defined in the SBD Ordinance, and set forth in Section 5.3 of the Annual Contract’s
Instruction to Bidders. Waiver requests not submitted at the time of bid submission shall not be considered. If the Office of SBD determines that adequate Good Faith Efforts have been demonstrated to warrant a partial or total waiver, the waiver shall be granted accordingly. If the
Office of SBD determines that the Bidder failed to submit documentation sufficient to demonstrate
Good Faith Efforts, the request for waiver or partial waiver shall be denied and the Bidder shall be deemed non-responsive. The granting of a waiver shall apply solely to the Bidders to whom it is issued and shall not, by itself, amend, reduce, or otherwise alter the API requirements applicable to other
Bidders under the solicitation. A Bidder may seek reconsideration of an adverse waiver determination as set forth in Section 5.3 of the Annual Contract’s Instruction to Bidders and the SBD
Ordinance.
6. Addendum. Any interpretation, clarification, correction, or change of the Bidding Documents will be made only by Addendum. The Department will send written instructions regarding discrepancies, omissions or unclear intents to all Bidders who are Qualified Contractors with an Annual Contract. For projects
$150,000 and over all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4.
Interpretations, corrections or changes to the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes. Prior to submission of its Bid/Quote, each Bidder must ascertain that it has received all Addenda issued. The Bidder must acknowledge receipt of each individual Addendum at the time of issuance and final receipt of all Addenda by completing the acknowledgment space provided on the Addendum Form. Failure to acknowledge receipt may result in rejection of a bid/quote.
7. Failure to Provide the Required Documents after Notification of Award. If after Notification of award from the County, the successful Bidder does not provide within 14 Days of Notification the signed
Work Order, the Public Construction Bond and Guarantee (when required), and the required certificates of insurance, the County may: 1. Call in the bid security when provided; 2. Cancel the notification of recommended award and award the project to the next responsive, responsible low bidder; 3. Terminate this Annual Contract for cause; 4. Suspend or debar the Bidder from bidding on future projects for a period of two (2) years, in accordance with the Palm Beach County Purchasing Ordinance; and/or 5. Pursue any and all remedies available against the Bidder for damages resulting from its failure to enter into a Work
Order and provide all required documents within 14 Days after notification.
8. Prohibition against Considering Social, Political or Ideological Interests in Government
Contracting - F.S. 287.05701. Bidders are hereby notified of the provisions of section 287.05701, Florida
Statutes, as amended, that the County will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder. Bidders are further notified that the County's governing body may not give preference to a Bidder based on the Bidder's social, political, or ideological interests.
https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
IFQ/B Page 5
9. Human Trafficking Affidavit. Contractor warrants and represents that it does not use coercion for labor or services as defined in section 787.06, Florida Statutes. Contractor shall execute
Attachment “D”, Nongovernmental Entity Human Trafficking Affidavit, which is attached hereto and incorporated herein by reference.
10. Living Wage Ordinance. Pursuant to section 255.0992, Florida Statutes, the County’s Living Wage
Ordinance shall not apply to this Invitation for Quote/Bid and any resulting Work Order(s), notwithstanding any provision of an existing Annual Contract to the contrary, including, but not limited to, the Instructions to Bidders, the General Conditions to the Annual Contract and the Certification of Compliance with the
Living Wage Ordinance.
11. CONTRACT AMENDMENTS. The Annual Contract is amended as follows:
GC 86 HUMAN TRAFFICKING AFFIDAVIT
Contractor warrants and represents that it does not use coercion for labor or services as defined in section 787.06, Florida Statutes. Contractor has executed the Nongovernmental Entity Human
Trafficking Affidavit.
GC 87 DIGITAL ACCESSIBILITY COMPLIANCE
Contractor acknowledges that the County is a public entity subject to Title II of the Americans with
Disabilities Act (ADA) and applicable federal accessibility regulations. Contractor represents and warrants that all websites, web-based applications, digital services, electronic documents, multimedia, and other electronic content created, developed, provided, submitted, maintained, or delivered under this Contract that may be electronically displayed, accessed, distributed, or made available to the public by the County shall conform to the Web Content Accessibility Guidelines
(WCAG) 2.1, Level AA, or any successor standard adopted by the U.S. Department of Justice.
All electronic documents submitted to the County, including but not limited to PDFs, reports, forms, presentations, and public-facing materials, shall be provided in an accessible format compliant with the applicable accessibility standard at the time of delivery.
Contractor shall ensure that any updates, revisions, or modifications to such digital content remain compliant throughout the term of this Contract. Upon request, Contractor shall provide documentation reasonably demonstrating accessibility compliance. If any deliverable is determined by the County to be noncompliant, Contractor shall promptly remediate the noncompliance at no additional cost to the County and within a timeframe specified by the County.
Contractor shall ensure that any third-party digital content or platforms used in performance of this Contract either comply with the requirements herein or that an accessible alternative acceptable to the County is provided.
Failure to comply with this subsection shall constitute a material breach of this Contract.
Quote/Bid Form Page 1 Form Rev. 02/04/26 Quote/Bid Form - NonFederal
QUOTE/BID FORM
PROJECT NUMBER: P-2026-000054
PROJECT NAME: Fire Station 16B- Temporary Facility
IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION FOR QUOTE/BID,
THE QUOTE/BID PACKAGE MUST CONTAIN:
a) This Quote/Bid Form completed and executed.
b) OSBD Schedules 1 and 2 completed and executed.
c) Bid Security. (If the bid is $200,000 or more).
d) Signed Addenda, if any issued
THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR
1. TOTAL QUOTE/BID AMOUNT $ ____________
Written amount ____________
2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment
A and as submitted on its OSBD Schedules 1 and 2.
3. Is the Bidder a Palm Beach County certified SBE? Yes_____ No_____
4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the
Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial
Nondiscrimination Policy as set forth in Resolution 2025-0748, as may be amended, to wit:
discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination.
Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2025-
0748, as may be amended.
Quote/Bid Form Page 2 Form Rev. 02/04/26 Quote/Bid Form - NonFederal
5. The Bidder shall be bound by the terms of its Bid for a period of one hundred twenty (120) calendar Days from the date of the bid opening and may not withdraw its Bid within that time period. If the County issues a Notification from Owner within the above 120-Day period, then the
Bidder will be bound by the Bid as submitted. If the County fails to issue a Notification from
Owner to the successful Bidder within the above identified 120-Day period, the successful bidder will not be required to honor its bid unless otherwise agreed to by both parties. County anticipates, but does not guarantee, the award of a Work Order and written notice to proceed within ninety (90) calendar Days of Notification from Owner, absent the filing of a timely bid protest.
6. It is agreed that the undersigned has received all addenda complete as issued by the County and that related costs are included in the bid submitted. The undersigned acknowledges receipt of said addenda as follows:
Addendum # dated Addendum# dated________
Addendum # dated Addendum# dated
The undersigned has included the signed addenda, if issued, in its bid package.
7. The undersigned does hereby declare that the Bid covers all expenses of every kind incidental to the completion of said Work in accordance with the Contract Documents, including all claims that may arise through damages or other causes whatsoever. The undersigned does hereby declare that it shall make no claim on account of any variation from any estimate in the quantities of Work to be done, nor on account of any misunderstanding or misconception of the nature of the Work to be done or the grounds, subsurface conditions, or place where the Work is to be done.
QUOTE/BID PROVIDED BY:
Contractor Name
Date Signature
Print Name and Title
Quote/Bid Must Contain Original Signatures. No Copies or Emailed/Faxed Quotes/Bids Will
Be Accepted
OSBD SCHEDULE 1
SOLICITATION/PROJECT/BID NAME: ______________ _ SOLICITATION/PROJECT/BID NO.: _____________ _
SOLICITATION OPENING/SUBMITTAL DATE: ______________ COUNTY DEPARTMENT: __________________
Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:
NAME OF PRIME RESPONDENT/BIDDER: __________________ ADDRESS: ___________________ _
CONTACT PERSON: _____________________ PHONE NO.: __________ E-MAIL:._____________ _
PRIME'S DOLLAR AMOUNT OR PERCENTAGE OF WORK: _____________ _ Non-SBE SBE
SBE Prime's must include their percentage or dollar amount in the Total Participation line under section B.
Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:
(Check all Applicable Categories) DOLLAR AMOUNT OR Subcontractor/Sub consultant Name
PERCENTAGE OF WORK
Non-SBE SBE
1. □ DI
2. □ □
3. □ □
4. □ □
5. □ □ (Please use additional sheets if necessary)
Total
Total Bid/Offer Price$. ______________ Total Certified SBE Participation $
I hereby certify that the above information is accurate to the best of my knowledge:
Name & Authorized Signature Title
Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.
2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OSBD Affirmative Procurement Initiative (API). Please
3. Modification of this form is not permitted and will be rejected upon submittal.
4. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.
OSBD LETTER OF INTENT- SCHEDULE 2
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant � any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER:------------------------------
SOLICITATION/PROJECT NAME:--------------------------------
Prime Contractor:___________________.Subcontractor:_________________ (Check box(s) that apply)
□ SBE □ Non-SBE □ Supplier Date of Palm Beach County Certification (if applicable): _______
SBE PARTICIPATION - SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/ proposal may be attached to a properly executed Schedule 2 for additional information.
Line
Item
Item Description Unit Price Quantity/
Units
Contingencies/
Allowances
Total Price/Percentage
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage: ________________
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Name of 2nd/3rd tier Subcontractor/subconsultant
Print Name of Prime
By:_________________ Authorized Signature
Print Name
Title
Date: __________________
Price or Percentage: ______________ _
Print Name of Subcontractor/subconsultant
By:------------------ Authorized Signature
Print Name
Title
Date: ___________________
Angela Smith Cross-Out
OEBO SCHEDULE 1*
SOLICITATION/PROJECT/BID NAME: SOLICITATION/PROJECT/BID NO.:
SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT:
Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:
NAME OF PRIME RESPONDENT/BIDDER: ADDRESS:
CONTACT PERSON: PHONE NO.: E-MAIL:
Non-SBE SBE
Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:
Subcontractor/Sub consultant Name (Check all Applicable Categories)
Non-SBE SBE
DOLLAR AMOUNT OR
PERCENTAGE OF WORK
1.
2.
3.
4.
5.
(Please use additional sheets if necessary) Total _________________________
Total Bid/Offer Price $ Total Certified SBE Participation $
I hereby certify that the above information is accurate to the best of my knowledge:
Title
DIRECTION: List Firm Name, Address & Provide PBC Vendor ID#. (https://www.pbcgov.org/pbcvendors)
Subcontractor 1 1222 Easy St., WPB, FL 33401
561-123-4567 VC178229
Subcontractor 2 5600 Carefree Lane, WPB, FL 33411
954-345-6789 VC123459
SAM
PLE
John Doe
PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK:
SBE Prime’s must include their percentage or dollar amount in the Total Certified SBE Participation line under section B.
Name & Authorized Signature Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.
2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.
3. Modification of this form is not permitted and will be rejected upon submittal.
4. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.
*Revised 6.5.2025 pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025 ddelriocabrera Textbox MUST List ALL Subcontractors/Subconsultants ddelriocabrera Textbox Add All Certified SBE Amounts, Including Prime SBE ddelriocabrera Typewriter $145,385.80 ddelriocabrera Typewriter 181,380.85 ddelriocabrera Textbox
SAMPLE
ddelriocabrera Textbox $86,380.85
Subcontractor:
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Print Name Print Name
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
Name of 2nd/3rd tier Subcontractor/subconsultant
*Revised�6.5.2025�pursuant�to�Emergency�Ordinance�2025-014,�approved�on�June�3,�2025
SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*
SOLICITATION/PROJECT NUMBER:
SOLICITATION/PROJECT NAME:
19600
Carlin Park, Maintenance Bldg, Roofing Replacement
$95,000Remove and replace existing roof
President
John Doe
Roofers Are Us, Inc.
Prime Contractor: Roofers Are Us, Inc.
(Check box(s) that apply)
☒ SBE □ Non-SBE □ Supplier
Title
Date: 6/4/2025
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
Date of Palm Beach County Certification (if applicable):3/30/2024 .
Title
Date: 6/4/2025 dlynch Highlight dlynch Highlight
Subcontractor:
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Print Name Print Name
Title
Date:
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
Name of 2nd/3rd tier Subcontractor/subconsultant
*Revised 6.5.2025 pursuant to Emergency Ordinance 2025-014, approved on June 3, 2025
Remove and replace existing roof
Subcontractor 1
President Assistant Vice President
John Doe James Doe
Roofers Are Us, Inc.
SAM
PLE
Subcontractor 1
$50,385.80
Date: 6/4/2025 6/4/2025
SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement
Date of Palm Beach County Certification (if applicable):1/1/2024
Prime Contractor: Roofers Are Us, Inc.
(Check box(s) that apply)
☒ SBE ☐ Non-SBE □ Supplier dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Placed Image
Placed Image
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name
Date:
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
President
John Doe
Roofers Are Us, Inc.
SAM
Prime Contractor: Roofers Are Us, Inc.
Subcontractor 2 Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Jane Doe Print Name
Vice President
Subcontractor: Subcontractor 2
Date of Palm Beach County Certification (if applicable):
$35,995.05
$25,995.05
$10,0002nd Tier Subcontractor
Date: 6/4/2025 6/4/2025
SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement
(Check box(s) that apply)
□ SBE ☒ Non-SBE □ Supplier dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight
Placed Image
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement
SAM
Date of Palm Beach County Certification (if applicable):
Prime Contractor: Subcontractor 2 Subcontractor: 2nd Tier Subcontractor
$10,000.00
Jude Doe
Manager
Jane Doe Print Name
Vice President
Subcontractor 2 2nd Tier Subcontractor Print Name of Subcontractor/subconsultant
(Check box(s) that apply)
□ SBE ☒ Non-SBE □ Supplier
SAMPLE OEBO LETTER OF INTENT – SCHEDULE 2*
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
Title
Date: 6/4/2025
Title
Date: 6/4/2025 dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight
Highlight
Form Rev. 10/28/24 Attachment A for Minor Construction -MultiTrade
ATTACHMENT “A”
(for Minor Construction - MultiTrade)
AFFIRMATIVE PROCUREMENT INITIATIVES (APIs) FOR CONSTRUCTION
PROCUREMENT
The API(s) approved for this project are selected below by ☒. Any bid that fails to comply with the API requirements after the period allowed for waiver requests has lapsed shall be deemed non-responsive. Fillable pdfs of all EBO forms can be found on the OEBO website at http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx. Also, see the EBO
Ordinance and Countywide PPM CW-O-043 for further information on APIs.
__X__ SBE Subcontracting Program
A minimum mandatory goal of 25% SBE participation is established for this contract. The EBO Office shall reduce or waive this goal when there is inadequate availability of SBE prime and / or subcontractor firms. Respondents/bidders may request such waivers at least seven (7) days prior to bid opening based on submission of adequate
Good Faith Efforts documentation.
http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx
Revised 5/2019
Palm Beach County Office of Equal Business Opportunity
Subcontracting Goal – Waiver Request Form
PROJECT NAME: DATE:
COMPANY NAME: CONTACT NO.:
CONTACT PERSON: CONTACT EMAIL:
PART I: Sufficient Commercially Useful Work Identified to Meet Points:
Subcontracting Goal
Please provide documentation and supporting evidence to show how the criteria was fulfilled. 15 points possible:
List the specific scope of work identified for each of the SBEs contacted
Ensure the scope of work identified for SBEs is greater than or equal to the subcontracting goal(s)
Additional comments, if any
PART II: Initial Communications to Potential SBE Subcontractors Points:
Using EBO Portal / Website Posting of Subcontractor Solicitations/Outreach Efforts
Please provide documentation and supporting evidence to show how the criteria was fulfilled. 40 points possible:
Contact at least three (3) SBEs in the EBO Vendor Directory for each scope of work identified to be subcontracted in Part I (emails/call logs/fax), one (1) week prior to pre-bid meeting date.
Include current documentation of searches from the EBO Vendor Directory.
Notify SBEs within at least 2 (two) weeks prior to the bid opening date, using at least three (3) digital media outlets (e.g. website, newspaper, trade association, publication, minority focus media)
PART III: Follow-up Communications & Bid Negotiations with Points:
Potential Subcontractors
Please provide documentation and supporting evidence to show how the criteria was fulfilled. 30 points possible:
Promptly follow-up with SBEs after the initial solicitation at least 2 (two) weeks prior to the bid opening date, during normal business hours by telephone, email, or fax.
Include a written statement with contact information on all subcontractors contacted to include the following:
Name of the subcontractor/firm and the contact person(s)
Telephone and Email address
Scope of work the subcontractor indicated they would perform
Notes regarding the outcome of the contact
Dates of contact and Dates of Negotiations
In the sections below, points will ONLY be awarded if the firm has fully satisfied the criteria. More information regarding Subcontracting Goal-Waiver Request Evaluation Criteria. Contractors/Consultants must obtain a total of 80 or more points to receive a waiver approval. Vendor Directory is accessible through the Office of Equal Business Opportunity website (www.pbcgov.org/pbcvendors) https://www.pbcgov.org/pbcvendors
Revised 5/2019
Subcontracting Goal – Waiver Request Form
The negotiated price
Bids received from subcontractors that could provide a commercially useful function
PART IV: Attendance at Pre-Bid Meeting Points:
County staff maintains documentation regarding attendance at the pre-bid meeting. 5 points possible:
Below list the individuals from your staff/firm that attended the pre-bid meeting
PART V: Offer Assistance in Securing Financing, Insurance, Points:
or Competitive Supplier Pricing
Please provide documentation and supporting evidence to show how the criteria was fulfilled. 10 points possible:
Provide easy access to plans and specifications for SBEs
Provide competitive pricing
Make efforts to assist interested business in obtaining financing, bonds, and insurance required for the County project/bid
Provide written documentation of the type of assistance offered
Company name, contact person and telephone number
Name of person who provided the assistance
Provide the name, contact person, contact information the competitive pricing offered by the Supplier.
Other efforts (if any, list below)
CONTRACTORS/CONSULTANTS MUST OBTAIN A TOTAL OF 80 OR MORE POINTS TO RECEIVE A WAIVER APPROVAL.
CONTRACTORS/CONSULTANTS WILL BE CONSIDERED NON-RESPONSIVE TO THE ENTIRE SOLICITATION UPON DENIAL OF THE
SUBCONTRACTING WAIVER REQUEST. FOR MORE INFORMATION OF THE SUBCONTRACTING WAIVER CRITERIA OR FOR
ASSISTANCE ON COMPLETING THE SUBCONTRACTING WAIVER REQUEST FORM, PLEASE CONTACT THE OFFICE OF EQUAL BUSINESS
OPPORTUNITY AT (561) 616-6840.
THE UNDERSIGNED AFFIRMS/CERTIFIES THAT ALL INFORMATION CONTAINED IN THIS FORM IS ACCURATE AND COMPLETE; I UNDERSTAND THAT IF THIS REQUEST FOR WAIVER IS DENIED AND I FAIL TO MEET THE REQUIREMENTS OF THIS SOLICITATION, MY
RESPONSE TO THIS SOLICITATION WILL BE DEEMED NON-RESPONSIVE TO THE ENTIRE SOLICITATION.
Signature Print Name/Title
Approved
Denied TOTAL SCORE: /100 Director, Office of Equal Business Opportunity
Office of Equal Business Opportunity Good Faith Efforts Form
PRIME CONTRACTOR GOOD FAITH EFFORTS
Prime Contractor Name: ________________________________ Project Name: _________________________________
Project No.: ___________________________________ Date Submitted: _______________________________
Scope of Service
Line Item No. Certified Firm Name, Address, Phone, Email and Contact Person Methods of Contact Number of times contacted
Contact Date(s)
Certified Firm
Response
Results of Contact (why suitable or not suitable for work)
Phone
Fax
Pre-Bid
Authorized Signature: _______________________________________ Date: ___________________ Phone: _____________________________
Print Name: ______________________________________________________ Email Address: _____________________________________________
PBC EBO
The Prime Contractor has to demonstrate “Good Faith Efforts” to meet the SBE goal, which includes the accurate preparation and submittal of this form,and other efforts described in Section 2-80.27 (1.c) of the Equal Business Opportunity Ordinance.
When submitting a Subcontracting Goal - Waiver Request Form, please submit documentation of your efforts indicated below 7 days prior to bid opening or proposal due date. The fields below will serve as a guide for the Office of Equal Business Opportunity (OEBO) to evaluate your Good Faith Efforts toward meeting subcontracting goals. We ask that this form is utilized in order to provide uniformity to our process; additional documents can be submitted as support for efforts made. For any questions regarding this document, please contact the Office of EBO at 561-616-6840.
THE PRIME CONTRACTOR SHOULD ONLY SUBMIT THIS INFORMATION IF THE PARTICIPATION PLAN DOES NOT MEET THE CONTRACT GOAL. FAILURE TO SUBMIT THIS INFORMATION MAY RESULT IN THE BID AND/OR PROPOSAL FOUND AS NON-RESPONSIVE TO THE ENTIRE SOLICITATION. PLEASE NOTE THAT METHODS OF CONTACT CANNOT BE THE SAME ON
MULTIPLE ATTEMPTS.
Bid Bond / Page 1 Form Rev. 02/04/26 Bid Bond - NonFederal
IFQ/B ATTACHMENT B
Return Attachment B if bid is $200,000 or more
PROJECT NUMBER: P-2026-000054
BID BOND
STATE OF FLORIDA
COUNTY OF PALM BEACH
KNOW ALL MEN BY THESE PRESENTS: That we, (hereinafter called "Principal"), and
(hereinafter called "Surety") are held and firmly bound unto Palm Beach County, a Political Subdivision in the State of Florida, by and through its Board of
County Commissioners, (hereinafter called "County") in the sum of
Dollars,($ ), (which sum is at least 5% of the bid price), lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly be these presents;
WHEREAS, the "Principal" contemplates submitting or has submitted a bid to the Board of County
Commissioners, Palm Beach County, Florida, for furnishing and paying for all necessary labor materials, equipment, machinery, tools, apparatus, services, all state workmen's compensation and unemployment compensation taxes incurred in the performance of the Contract, means of transportation for and complete
Construction of: (Project Name Fire Station 16B- Temporary Facility and Number P-2026-000054), in the County of Palm Beach, State of Florida; and
WHEREAS, it was a condition precedent to the submission of said bid that a certified check cashier's check, money order or bid bond in the amount of five percent (5%) of the base bid be submitted with said bid as a guarantee that the bidder would, if given a Notification from Owner, enter into a written contract with the
County, and furnish a public construction bond in an amount equal to one hundred (100%) of the total
Contract, within fourteen (14) consecutive calendar days after the County issues the Notification from
Owner.
NOW THEREFORE, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the bid of the "Principal" herein is accepted and said "Principal", within fourteen (14) consecutive calendar days after written notice being given of such acceptance, (i) enter into a written contract with the County and (ii) furnishes a public construction contract bond in the amount equal to one hundred percent (100%) of the total contract amount and in a form satisfactory to the County, then this obligation shall be void. If the
Principal fails to complete (i) and (ii) above, the sum herein stated shall be due and payable to the "County", and the "Surety" herein agrees to pay said sum immediately upon demand of the "County", in good and lawful money of the United States of America, as liquidated damages for failure of said "Principal".
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
Bid Bond / Page 2 Form Rev. 02/04/26 Bid Bond - NonFederal
PROJECT NUMBER: P-2026-000054
IN WITNESS WHEREOF, the said as "Principal" herein, has caused these presents to be signed in its name, by its
, and attested by its under the corporate seal, and the said as "Surety" herein, has caused these presents to be signed in its name, by its
, and attested by its corporate Seal, this day of , A.D., 20 .
ATTEST:
TITLE:
(SEAL)
(Contractor Name)
(Signature)
Print Name and Title:
ATTEST:
TITLE:
(SEAL)
(Surety Name)
(Signature)
Print Name and Title:
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
CAPITAL IMPROVEMENTS DIVISION
IFQ/B ATTACHMENT C
PROJECT REQUIREMENTS
ANNUAL CONTRACT - MINOR CONSTRUCTION SERVICES
Contact: Sunil Jagoo, Project Manager Phone: (561)233-0271 Project Title: Fire Station 16B- Temporary Facility Project #: P-2026-000054 Project Location: 12180 Alternate A1A, Palm Beach Gardens, FL
1. GENERAL
a. The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.
b. Please reference the Annual Contract – Minor Construction Services for additional requirements.
c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday.
d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation.
e. Work to be completed within one hundred twenty (180) calendar days from Notice to
Proceed. The building permit package has been submitted to Palm Beach County Building Division and will require a contractor change when finalized. The contractor is responsible for the change-of-contractor fees as well as any additional sub-permits required for this project. Palm Beach County will pay the main building permit fees.
f. Liquidated damages will accrue in the amount of $180 per day.
g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.
h. Contractor is responsible for obtaining all measurements during the site inspection
2. SCOPE OF WORK
To install a temporary trailer and all the necessary appurtenances necessary for a temporary Fire Station per the project requirements provided below, the permit sets, and the architectural drawings and specifications included as Exhibit “1”:
a. The Contractor shall coordinate temporary utilities, site work, and incidentals necessary to relocate, install, and make operational a temporary trailer facility and associated appurtenances for use as a temporary fire station. The temporary trailer will be provided by Palm Beach County Fire Rescue.
b. The Contractor shall be responsible for relocating the trailer from its current location at
8130 N. Jog Road, West Palm Beach, FL 33412, to the project site. This work shall include, but not be limited to, the safe disconnection and termination of all existing utilities at the current location, preparation of the trailer for transport, transportation to the project site, placement, leveling, anchoring, utility reconnections, and all work necessary to place the trailer into service at the new temporary fire station location.
3. SUBMITTALS
All submittals shall be sent to the Project Manager for approval. This includes, but is not limited to, products to be used, methods of installation and requests for information and/or clarification. All submittals must be made by the Contractor and must include all details necessary for the Project Manager and Palm Beach County to make any necessary determinations. A transmittal form must be included which clearly requests data or information and deviations from the contract requirements for which approval is being requested. Failure to provide sufficient information will result in the rejection of the submittal. Where the specifications do not specify a brand name product or where a substitution of a product is not specifically prohibited, the Contractor shall submit their selected products for approval by the Project Manager. Such submittals shall include as much detail, and in a format, as required by the Project Manager, so as to allow the Project Manager to evaluate the proposed substitution.
4. MATERIALS
a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owner’s Representative prior to ordering.
b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used.
5. TEMPORARY PROTECTION
The Contractor shall protect all workers, staff and the general public from injury. The Contractor shall coordinate and schedule all work with the Project Manager.
6. PROJECT CONDITIONS
Contractor is to coordinate all space and security requirements with the Project Manager.
A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas.