P-054-190-010 - Addendum 3.pdf
PDF 536 KB Posted
- Solicitation number
- BPM043040
- Issued by
- Worcester County, Maryland
About this file
This document is Addendum No. 3 issued by the State of Maryland Department of General Services for Project No. P-054-190-010 to renovate the day-use bathhouse at Assateague State Park. The addendum clarifies, adds to, deletes, corrects, and changes the bid documents. It includes responses to questions, revised project drawings, a bid due date extension, and clarifications on camera surveillance requirements. The bid due date has been extended to May 1, 2024.
The addendum provides details on the required camera installation and integration with the existing security system in the concession stand. It also includes information on the existing concrete precast hollow core planks and the required core drilling, noting that supplemental support or reinforcement is not expected for the new penetrations. The project is located in Worcester County, Maryland.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3
April 19, 2024
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
Atif Chaudhry, Secretary
Project No. P-054-190-010 Renovate Day-Use Bathhouse at Assateague State Park
This Addendum will clarify, add to, delete from, correct and/or change the bid documents for the project referenced above to the extent indicated. This Addendum is hereby made a part of the bid documents on which the contract will be based. By submitting a bid for this solicitation you acknowledge receipt of this addendum. All questions must be in writing and addressed to the Procurement Officer.
This Addendum includes:
Responses to Questions Project Drawings Bid Due Date Extension Clarification and updates
Attachment Responses to Questions Camera Datasheet Project Drawings
Bid due date has been extended to May 1, 2024
Clarification and updates In reference to drawing E-102, Keynote # 4, the contractor should provide a new camera in the location indicated for vending machine surveillance and tie it into the existing security system located in the concession stand. This is not replacing an existing camera.
See the attached datasheet for more information.
End of Addendum #3
Issued by:
State of Maryland
Office of State Procurement 301 W. Preston Street, Room 1204
Baltimore, MD 21201
Natasha Ramsundar Procurement Officer
054-190-010 Responses to Questions
The uploaded drawings from Emma seem to be non-scalable and sized to 8.5x11. Is there another set of corrected and accurately scaled drawings available to download?Drawing attached.
Is there a detail and/or further information regarding the existing concrete precast hollow core planks and required core drilling?
Do we know the depth of penetration?
See plan & section below from as-built drawing S-3 attached; contractor to verify as-built is accurate. Notes show 6” hollow-core planks w/ 2” min/3”max topping slab w/ 6x6 W1.4xW1.4 WWM.
Will supplemental support/reinforcement need to be factored into the new penetrations?
Supplemental support/reinforcement is not expected for pipe penetrations =/<6” diameter and minimum 4” from plank edges.
3. Is there a detail for anchoring wall carriers into existing concrete precast hollow core planks?
a. What are the limitations over the hollow chambers if this is encountered?
See below response in 3b.
b. Should wall carriers’ feet be through-bolted and shored to the underside of precast hollow core plank.
Wall carrier bearing points (feet) to be thru-bolted to underside of precast hollow core plank and are not to land on plank joints with minimum 1-1/2” to plank edge.
4. Plumbing Demolition Drawing PD-101 note 3 – is there an existing sprinkler system & piping to be removed?
A limited sprinkler system (three heads) serves the existing water heater room and storage room. It is not tied in to the existing fire alarm system. Connection to the existing domestic water system is pictured below. The sprinkler system is to be removed and the extent of the system is indicated on PD-101. No new sprinkler system is to be installed.
5. Please confirm the color price group for the solid surface counters SS1 and SS2.
Color will be selected by DNR from Contractor-provided samples.
6. Is there any more information available (model/spec, existing system type) for the “security camera device and cable that is compatible with existing security system” per Key Note 4 on E-102?
There is a security system (Digital Watchdog DW-VP16-16P). Please see the attached datasheet for a basis of design for the camera.