Ozone Generator Cleaning Scope of Work.pdf

PDF 208 KB Posted

Attached to
Ozone Gen Cleaning
Solicitation number
9166
Issued by
Dallas County, Arlington City, Texas

About this file

This Scope of Work document pertains to the cleaning and maintenance of two Wedeco PDO-6000 ozone generators at the Lake Ray Roberts Water Treatment Plant in Aubrey, Texas. The project requires the contractor to clean the internal components of both ozone generator vessels, replace all dielectric electrode assemblies and associated hardware with new Wedeco EFFIZON GC electrode assemblies, and test and return both generators to service. Work must be performed sequentially on each generator to maintain ozone disinfection capability throughout the project. The contractor shall furnish all materials, labor, tools, equipment, and supervision necessary to complete the work, including new OEM electrodes, connecting hardware, gaskets, transformer bushings, cleaning materials, and consumables. The contractor must comply with the owner's site safety rules, OSHA and NFPA regulations, and implement a written lockout-tagout procedure for all energy sources. No specific response date, bid due date, site visit requirement, bidder's conference, or award date is identified in this scope of work document.

The pricing terms, contract term, and renewal options are not specified in this scope of work. The contractor must provide a warranty of minimum one year on workmanship from acceptance of each generator and minimum ten-year warranty on the EFFIZON GC electrode assemblies, with warranty coverage including replacement parts and labor for removal, replacement, reassembly, and restart. Contractor qualifications must demonstrate prior experience with at least three completed dielectric replacement projects on municipal ozone generators of similar size within the past five years, with verifiable references. Evaluation criteria weight the overview of firm and past experience at 45 percent, work plan and project approach at 20 percent, price at 25 percent, and key personnel qualifications at 10 percent. No set-asides, incumbent information, funding sources, or contract amounts are specified in this document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work: Ozone Generator Cleaning & Dielectric Replacement

1. Project Overview The Contractor shall clean the internals of two (2) ozone generator vessels, replace all dielectric electrode assemblies and associated hardware, then test, purge and return both generators to service.

• Site: Lake Ray Roberts Water Treatment Plant, 9401 Lake Ray Roberts Dam Road, Aubrey, TX 76227

• Equipment: Two (2) Wedeco PDO-6000 ozone generators with associated power supply units (PSUs), original Wedeco project no. 20645

• Purpose: Restore ozone production capacity and energy efficiency

• Work sequence: One generator at a time, so the plant keeps ozone disinfection throughout the project.

2. Contractor Scope of Work

The Contractor shall furnish all materials, labor, tools, equipment and supervision to complete the following on each of the two generators.

3. Materials (per generator)

• New Wedeco EFFIZON® GC electrode assemblies, full vessel set, 1:1 replacement for the existing electrodes

Requirement Specification

Electrode Wedeco EFFIZON® GC (Glass Core) electrode assembly, new, genuine OEM

Construction Glass center rod with conductive stainless-steel mesh, replacing the existing stainless steel center rod design

Fit 1:1 replacement in the existing PDO-6000 vessel tubes, with no tube or vessel modifications

Failure protection

Intelligent Electrode Protection (IEP): the mesh melts away at a failed electrode and disconnects it from the circuit; no electrode fuses

Warranty 10 years

Substitutions None.

• Connecting links, nuts and Teflon (PTFE) spacers as needed.

• Teflon end gaskets / door gaskets as needed.

• Sight glass gaskets as needed.

• Transformer HV bushings and HV bushing gaskets as needed.

• Cleaning materials, including projectiles for pneumatic tube cleaning and denatured alcohol as needed.

• All consumables, rags, PPE and temporary protection as needed.

4. Work requirements The Contractor is responsible for its own means and methods. At a minimum, the work on each generator shall include:

• Safely remove the generator from service and isolate and lock it out in coordination with plant staff.

• Remove all existing electrode assemblies and record the location of any failed or damaged ones.

• Clean the vessel tubes and internal components so they are free of debris and contamination.

• Report any corrosion, damage or cooling water intrusion found inside the vessel to the Owner before reassembly.

• Install new EFFIZON® GC electrode assemblies and the new hardware and gaskets, per the manufacturer's requirements.

• Purge, test and return the generator to service.

• Remove all debris and leave the work area clean.

5. Additional work If the Contractor finds conditions needing parts or labor beyond this scope, it shall stop that item, notify the Owner in writing with a cost and time estimate, and proceed only on written approval.

6. Safety Requirements

• Follow the Owner's site safety rules, OSHA and NFPA regulations.

• Use a written LOTO procedure for the PSU, its power feed, feed gas and cooling water; Owner verifies isolation before work starts.

• Verify zero energy on HV components and ground them before contact.

• Treat the oxygen-enriched vessel as a fire hazard: no ignition sources, oil- or grease-free tools and gloves.

• Hold a pre-job safety briefing each shift; report incidents and near misses to the

Owner the same day.

7. Warranty

• Workmanship: Minimum 1 year from acceptance of each generator.

• Dielectrics: Minimum 10-year warranty on the EFFIZON® GC electrode assemblies, matching the manufacturer's guarantee. The warranty shall cover replacement parts and the labor to remove, replace, reassemble and restart.

• Warranty start: the later of acceptance or the date stated in the bid; no start tied to shipment before installation.

8. Contractor Qualifications

• Overview of Firm and Past Experience – Provide a brief overview of your firm, including years in business, number of offices and staff, and identify the office location that your firm will provide these services from, and number of staff (by position) in that office. Describe at least 3 completed dielectric replacement projects on municipal ozone generators of similar size in the past 5 years, with references.

Include the following information for each project submitted:

o Project Name o Owner Name o Project Owner Contact Name, Phone Number, and Email Address o Original Project Time and Actual Completion Time o Original Project Cost and Final Project Cost o Detailed Project Description

• Key Personnel – Description of the field technicians trained on Wedeco PDO-series generators or equivalent tube-type ozone generators that would be directly responsible the servicing the City contract, including their qualifications and length of service in their current position. Describe what you would do to ensure consistency of the service to the City in the event that there is a change in the primary contact assigned to the City contract and the process for notifying the City, including the amount of advance notice that can be reasonably expected. Field technicians trained on Wedeco PDO-series generators or equivalent tube-type ozone generators.

• Work Plan/Project Approach – Provide a summary of your team’s approach in providing successful services for the City; methods your firm will use to manage the cost, schedule, scope and quality of this project; and how they specifically differ from other firms you typically compete with.

o Description of the process used to communicate and collaborate with the City and provide quotes and periodic reports.

o A description of how the firm would ensure the quality and timeliness of communication with the City. Include guaranteed response times for the following:

o Response to telephone or voicemail messages o Response to service requests o Response to emergency services needed o A description of how the firm would respond to the City if these guarantees above were not met.

9. Scoring

• Overview of firm and past experience – 45%

• Key Personnel – 10%

• Work Plan/ Project Approach 20%

• Price 25%