OVERHUAL DISCRIPTION.pdf
PDF 4 MB Posted
- Attached to
- REPAIR OF PUMPING UNIT, SEWAGE
- Solicitation number
- 70Z08522Q39006B00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR CLAUSES.pdf | ||
| Drawing_PN 5000268.pdf | ||
| Sole_Source_JOTFOC_.pdf | ||
| 70Z08522Q39006 RFQ.pdf | ||
| 58568_015836837-Repair-Sewage Pump.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
ITEM NAME
STOCK NUMBER
PART NUMBER
PUMPING UNIT,SEWAGE
4630-01-583-6837
5600268
SHELF LIFE CD 0
USED ON NSC 418' WMSL SEWAGE SYSTEM
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
OVERHAUL DESCRIPTION
ITEM NAME:
STOCK NUMBER:
PUMP UNIT, CENTRIFUGAL
4630-01-583-6837
PART NUMBER: 5600268
USED ON: 418 WMSL NSC
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting
Officer.
OVERHAUL REQUIREMENTS:
INSPECTION AND OVERHAUL DISCRIPTION
1. SCOPE: U.S. Coast Guard SFLC requires complete overhaul services for the following item:
Overhaul Description
NSN: 4630-01-583-6837
Item Name: Pump Unit, Centrifugal
P/N: 5600268
Application: NSC, 418 Sewage Systems
Original Equipment Manufacturer (OEM): EVAC North America Inc.
1.1 All references to pump herein shall include both pump and motor.
Estimate and overhaul shall include pump and motor.
1.2 Descriptive Data: Pump unit complete with motor, 350 GPM @ 33 ft head, 1700 RPM, 4.8 KW, 440 VAC,3 ph, 60 HZ, IEEE-45, ABS Certified Double Seal, Single-Vane Impeller, Ductile Iron Material.
1.3 The assembly delivered for overhaul services is intended to be a complete
EVAC NORTH AMERICA INC. P/N: 5600268. Contractor shall notify the Coast
Guard Contract Administrator of any missing components or, otherwise, questionable condition that may hinder the overhaul process.
1.4 The overhaul requirements described herein are considered minimum and are not intended to replace any procedures, controls, examinations or tests
FOR OFACIAL USE ONLY
OVERHAUL DESCRIPTION
PRESERVATION/ PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
PACKAGING AND MARKING FOR SHIPMENT:
X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
4630-01-583-6837
PUMPING UNIT,SEWAGE
5600268
And the words: "Coast Guard SFLC Material, Condition "A"
B. See Attachments
FOR OFACIAL USE ONLY
File details come from the government source that posted it. Updated .