OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME ACTUATOR,GOVERNOR

STOCK NUMBER 2990-01-416-7304

PART NUMBER 111-1746

USED ON 225

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

OVERHAUL REQUIREMENTS

1. Scope: This description covers the inspection and overhaul procedures for the item described below for SFLC stock replenishment.

NSN: 2990-01-416-7304

Item Name: Actuator, Governor Part Number: 111-1746 Woodward Number: 8241-637 Original Equipment Manufacturer (OEM): Woodward Governor Co.

1.1 Descriptive Data: It is an electrically controlled and proportional output actuator with an integral backup mechanical governor.

1.2 Contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model governor actuator delivered for overhaul does not conform to that cited in Part 1 above.

2. Applicable Documents:

a) Technical manual 3508, Section 310B, Ship?s Service Diesel Generator Model 3508.

b) COMDTINST M10360.3C, Coating & Color Manual, Appendix B, Cutters and Boats Interior Painting System.

c) U.S Coast Guard Specification D-084-0481 Rev B. Equipment Unit Preservation, Packing and Marking

d) U.S. Coast Guard Specification D-000-0100 REV G. (Dtd. 03/06) Bar coding for U.S.C.G. SFLC Material.

e) FED-STD-595C Colors Used In Government Procurement (January 16, 2008 edition & change notice dated July 31, 2008).

f) DoD 4140.01-M-1, Dated 07 September 2007; Compliance for Defense Packaging: Phytosanitary Requirements for Wood Packaging Material (WPM).

g) Institute of electrical and electronics engineers, IEEE 43, (R 2006) Recommended Practice for Testing Insulation Resistance of Rotating Machinery

h) The Society for Protective Coatings, SSPC-SP 10, Near White Blast Cleaning, January 2007 edition.

i) ANSI/NCSL Z540.3-2006, Calibration laboratories and Measuring and Test Equipment General Requirements (1994 edition).

j) ANSI/ASQ Q9001- 2008, Quality Management Systems - Requirements.

k) ASTM D3951-10, Commercial packaging.

3. Requirements: The contractor shall provide all labor and materials to perform overhaul services on the governor as follows. Overhaul services shall cover the entire governor that includes governor actuator.

3.1 Preliminary disassembly and inspection shall be conducted to determine estimated cost of overhaul including material, labor, testing, packing, marking and preservation costs. The shipping container that the governor actuator was received in shall be inspected for possible re-use and addressed in the inspection report as to its condition or need for replacement. A detailed estimate shall be submitted to the Coast Guard Contracting Officer for approval prior to the start of overhaul work. Estimate shall include overhaul and testing of the governor actuator. Overhaul is intended to restore the governor actuator to a condition that is equal to that of a new governor actuator. Contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model delivered for overhaul services do not conform to the intended make and/or model cited in section 1.0 above, or is questionable for any reason.

3.2 Replacement Parts: All replacement parts used in the overhaul shall be new original OEM parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. Parts such as seals, bushings, plungers, pistons, etc. which are not manufactured by the governor actuator manufacturer shall be identified by their markings or through the use of the technical manual for identification purposes. These parts shall be obtained through their OEM or their distributors. Commercially available items such as hardware, seals, and plungers are generally interchangeable between different manufacturers and may be substituted as long as they are equal in all respect. Only in the case where the part cannot be identified shall it be ordered directly through the governor actuator manufacturer and their part number.

3.2.1 Label Plates: Remove any label plates and replace at the conclusion of painting. New label plates shall be used if the original plate is missing, not legible or in poor condition. The label plate shall contain governor actuator make, model and serial numbers and pertinent characteristic information as a minimum requirement. A separate label plate made of similar material as the original label plate shall be attached stating the contractor?s name, contract number, and date of overhaul.

3.3 Overhaul Requirements: Governor Actuator shall be overhauled and tested in accordance with the original and current Woodward design and technical specifications using Woodward replacement parts. Overhaul shall restore the governor actuator to a serviceable condition capable of performing to the standards of an identical new governor actuator.

3.4 Disposition: The Coast Guard shall determine the disposition of any pump unit delivered for repair that is found to be not suitable for repair for whatever reason.

3.5 Painting: All surfaces intended for paint shall be clean, dry, and free of contamination. Paint shall include primer and finish coats. Primer coat shall be silicone alkyd enamel type III class 1. Color of finish shall be Coast Guard Spar in accordance with Federal Standard 595B color number 10371.

Total paint thickness shall be 3 to 5 mil minimum dry film. Note:

Contractor shall ensure that the grease fittings and other surfaces not intended for paint are protected.

3.5.1 The contractor shall maintain documentation of the paint type, color, and application. Records shall be made available upon request of the QAR.

3.6 Testing:

SHELF LIFE CD 0

OVERHAUL REQUIREMENTS

1. Scope: This description covers the inspection and overhaul procedures for the item described below for SFLC stock replenishment.

NSN: 2990-01-416-7304

Item Name: Actuator, Governor Part Number: 111-1746 Woodward Number: 8241-637 Original Equipment Manufacturer (OEM): Woodward Governor Co.

1.1 Descriptive Data: It is an electrically controlled and proportional output actuator with an integral backup mechanical governor.

1.2 Contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model governor actuator delivered for overhaul does not conform to that cited in Part 1 above.

2. Applicable Documents:

a) Technical manual 3508, Section 310B, Ship?s Service Diesel Generator Model 3508.

b) COMDTINST M10360.3C, Coating & Color Manual, Appendix B, Cutters and Boats Interior Painting System.

c) U.S Coast Guard Specification D-084-0481 Rev B. Equipment Unit Preservation, Packing and Marking

d) U.S. Coast Guard Specification D-000-0100 REV G. (Dtd. 03/06) Bar coding for U.S.C.G. SFLC Material.

e) FED-STD-595C Colors Used In Government Procurement (January 16, 2008 edition & change notice dated July 31, 2008).

f) DoD 4140.01-M-1, Dated 07 September 2007; Compliance for Defense Packaging: Phytosanitary Requirements for Wood Packaging Material (WPM).

g) Institute of electrical and electronics engineers, IEEE 43, (R 2006) Recommended Practice for Testing Insulation Resistance of Rotating Machinery

h) The Society for Protective Coatings, SSPC-SP 10, Near White Blast Cleaning, January 2007 edition.

i) ANSI/NCSL Z540.3-2006, Calibration laboratories and Measuring and Test Equipment General Requirements (1994 edition).

j) ANSI/ASQ Q9001- 2008, Quality Management Systems - Requirements.

k) ASTM D3951-10, Commercial packaging.

3. Requirements: The contractor shall provide all labor and materials to perform overhaul services on the governor as follows. Overhaul services shall cover the entire governor that includes governor actuator.

3.1 Preliminary disassembly and inspection shall be conducted to determine estimated cost of overhaul including material, labor, testing, packing, marking and preservation costs. The shipping container that the governor actuator was received in shall be inspected for possible re-use and addressed in the inspection report as to its condition or need for replacement. A detailed estimate shall be submitted to the Coast Guard Contracting Officer for approval prior to the start of overhaul work. Estimate shall include overhaul and testing of the governor actuator. Overhaul is intended to restore the governor actuator to a condition that is equal to that of a new governor actuator. Contractor shall immediately notify the Coast Guard Contracting Officer if the make and/or model delivered for overhaul services do not conform to the intended make and/or model cited in section 1.0 above, or is questionable for any reason.

3.2 Replacement Parts: All replacement parts used in the overhaul shall be new original OEM parts. Reclaimed, recycled or aftermarket parts are not acceptable and shall not be used. Parts such as seals, bushings, plungers, pistons, etc. which are not manufactured by the governor actuator manufacturer shall be identified by their markings or through the use of the technical manual for identification purposes. These parts shall be obtained through their OEM or their distributors. Commercially available items such as hardware, seals, and plungers are generally interchangeable between different manufacturers and may be substituted as long as they are equal in all respect. Only in the case where the part cannot be identified shall it be ordered directly through the governor actuator manufacturer and their part number.

3.2.1 Label Plates: Remove any label plates and replace at the conclusion of painting. New label plates shall be used if the original plate is missing, not legible or in poor condition. The label plate shall contain governor actuator make, model and serial numbers and pertinent characteristic information as a minimum requirement. A separate label plate made of similar material as the original label plate shall be attached stating the contractor?s name, contract number, and date of overhaul.

3.3 Overhaul Requirements: Governor Actuator shall be overhauled and tested in accordance with the original and current Woodward design and technical specifications using Woodward replacement parts. Overhaul shall restore the governor actuator to a serviceable condition capable of performing to the standards of an identical new governor actuator.

3.4 Disposition: The Coast Guard shall determine the disposition of any pump unit delivered for repair that is found to be not suitable for repair for whatever reason.

3.5 Painting: All surfaces intended for paint shall be clean, dry, and free of contamination. Paint shall include primer and finish coats. Primer coat shall be silicone alkyd enamel type III class 1. Color of finish shall be Coast Guard Spar in accordance with Federal Standard 595B color number 10371.

Total paint thickness shall be 3 to 5 mil minimum dry film. Note:

Contractor shall ensure that the grease fittings and other surfaces not intended for paint are protected.

3.5.1 The contractor shall maintain documentation of the paint type, color, and application. Records shall be made available upon request of the QAR.

3.6 Testing:

3.6.1 Testing Requirements: After completion of overhaul, contractor shall conduct the following described tests. All tests shall be witnessed by a Coast Guard Quality Assurance Representative (QAR). All testing shall be accomplished on contractor supplied calibrated test equipment. Any failed governor actuator shall be repaired and re-tested until a successful test is achieved.

3.6.2 Operational Test: The governor actuator shall be ran & operated with fluid in a test tank for testing. The governor actuator shall meet the flow curve to a tolerance of +/- 5% as a brand governor actuator. During the tests, the bearings and seals shall be monitored and recorded on test report.

The operational test should be 10 minutes at a minimum. Ensure the governor actuator has no leaks. Any binding or unusual noise such as squealing coming from the governor actuator during this test shall be corrected and retested after corrective work is complete.

3.6.3 Test Report: A copy of the test report shall be packed with each governor actuator and a copy shall be turned over to the QAR. Report shall contain the following information at a minimum:

a. Contractor name.

b. Contract number.

c. Governor actuator Model & Serial Numbers.

d. Date of test.

e. Description of each test conducted and results of each test.

f. Name of the person conducting the testing.

3.7 Calibration: All test equipment and attached gages shall be calibrated per reference 2i and have a current calibration sticker. Calibration shall be traceable to National Standards.

3.8 The overhauled governor actuator shall be delivered to the Coast Guard completely assembled and ready for installation. Contractor shall preserve, package and mark each governor actuator in accordance with part 5 below.

3.9 One copy of the manufacturer?s installation, parts, and service manual shall be placed inside the shipping container. Resources for this information may be obtained from part 2.a, the manufacturer or their website.

3.10 Notifications & Inspections: The contractor is responsible for notifying the Contracting Officer no less than ten (10) calendar days prior to the contractor being ready for any Quality Assurance (Q.A.) inspections or testing required herein.

4. Quality Assurance:

4.1 General: The Contractor is responsible for the conformance and overall quality of each item offered to the Coast Guard for approval or acceptance.

4.2 Responsibility for Inspection: The Contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the Contractors facility prior to the Coast Guards acceptance of the contracted items. The Coast Guard reserves the right to verify or have performed any of the inspections set forth herein where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. The Coast Guard intends to have QA perform inspection on all governor actuator.

4.3 Responsibility for Compliance: All items shall meet the requirements of this specification. The inspections set forth in this specification shall become part of the Contractor?s overall inspection system or quality program.

The absence of any inspection requirements in the specification shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

4.4 Quality Program: The Contractor shall maintain a documented Quality Control (QC) Program conforming to ANSI/ASQ Q9001- 2008. A copy of this program shall be submitted to the Contracting Officer for approval within 15 calendar days after contract award.

4.5 Inspections & Tests: The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations, or tests normally employed by the contractor to assure the quality of the product. The following inspections are required:

a) Test requirements described in part 3.6.

b) Visual inspection of the paint coat.

c) Inspection of packaging and marking.

4.6 Notifications & Inspections: The contractor shall notify the Coast Guard Contract Administrator, at least ten days (INCONUS) and forty-five days (OCONUS), prior to the scheduled commencement of any test or inspection required by this statement of work.

4.7 Calibration System: The Contractor shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540.3-2006. The program shall be documented and traceable to the National Institute of Standards (NIST). The calibration system records shall be maintained for inspection for the duration of any contract referencing this specification

4.8 Test & Inspection Reports: A copy of the test or inspection report shall be turned over to the QAR upon his arrival at the contractor's facility.

4.9 Warranty. Contractor?s standard new pump unit warranty applies.

5. Preservation, Packaging, and Marking:

5.1 Preservation: An overhauled governor actuator is typically intended for warehouse storage and not for immediate installation. Therefore, it is critical that the contractor ensure that the overhauled governor actuator

3.6.1 Testing Requirements: After completion of overhaul, contractor shall conduct the following described tests. All tests shall be witnessed by a Coast Guard Quality Assurance Representative (QAR). All testing shall be accomplished on contractor supplied calibrated test equipment. Any failed governor actuator shall be repaired and re-tested until a successful test is achieved.

3.6.2 Operational Test: The governor actuator shall be ran & operated with fluid in a test tank for testing. The governor actuator shall meet the flow curve to a tolerance of +/- 5% as a brand governor actuator. During the tests, the bearings and seals shall be monitored and recorded on test report.

The operational test should be 10 minutes at a minimum. Ensure the governor actuator has no leaks. Any binding or unusual noise such as squealing coming from the governor actuator during this test shall be corrected and retested after corrective work is complete.

3.6.3 Test Report: A copy of the test report shall be packed with each governor actuator and a copy shall be turned over to the QAR. Report shall contain the following information at a minimum:

a. Contractor name.

b. Contract number.

c. Governor actuator Model & Serial Numbers.

d. Date of test.

e. Description of each test conducted and results of each test.

f. Name of the person conducting the testing.

3.7 Calibration: All test equipment and attached gages shall be calibrated per reference 2i and have a current calibration sticker. Calibration shall be traceable to National Standards.

3.8 The overhauled governor actuator shall be delivered to the Coast Guard completely assembled and ready for installation. Contractor shall preserve, package and mark each governor actuator in accordance with part 5 below.

3.9 One copy of the manufacturer?s installation, parts, and service manual shall be placed inside the shipping container. Resources for this information may be obtained from part 2.a, the manufacturer or their website.

3.10 Notifications & Inspections: The contractor is responsible for notifying the Contracting Officer no less than ten (10) calendar days prior to the contractor being ready for any Quality Assurance (Q.A.) inspections or testing required herein.

4. Quality Assurance:

4.1 General: The Contractor is responsible for the conformance and overall quality of each item offered to the Coast Guard for approval or acceptance.

4.2 Responsibility for Inspection: The Contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the Contractors facility prior to the Coast Guards acceptance of the contracted items. The Coast Guard reserves the right to verify or have performed any of the inspections set forth herein where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. The Coast Guard intends to have QA perform inspection on all governor actuator.

4.3 Responsibility for Compliance: All items shall meet the requirements of this specification. The inspections set forth in this specification shall become part of the Contractor?s overall inspection system or quality program.

The absence of any inspection requirements in the specification shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

4.4 Quality Program: The Contractor shall maintain a documented Quality Control (QC) Program conforming to ANSI/ASQ Q9001- 2008. A copy of this program shall be submitted to the Contracting Officer for approval within 15 calendar days after contract award.

4.5 Inspections & Tests: The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations, or tests normally employed by the contractor to assure the quality of the product. The following inspections are required:

a) Test requirements described in part 3.6.

b) Visual inspection of the paint coat.

c) Inspection of packaging and marking.

4.6 Notifications & Inspections: The contractor shall notify the Coast Guard Contract Administrator, at least ten days (INCONUS) and forty-five days (OCONUS), prior to the scheduled commencement of any test or inspection required by this statement of work.

4.7 Calibration System: The Contractor shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540.3-2006. The program shall be documented and traceable to the National Institute of Standards (NIST). The calibration system records shall be maintained for inspection for the duration of any contract referencing this specification

4.8 Test & Inspection Reports: A copy of the test or inspection report shall be turned over to the QAR upon his arrival at the contractor's facility.

4.9 Warranty. Contractor?s standard new pump unit warranty applies.

5. Preservation, Packaging, and Marking:

5.1 Preservation: An overhauled governor actuator is typically intended for warehouse storage and not for immediate installation. Therefore, it is critical that the contractor ensure that the overhauled governor actuator undergo the below preservation requirements:

a. Governor actuator shall be drained and dried of all test fluid.

b. Intake and discharge ports shall have plastic caps or wood covers installed.

c. Governor actuator that has ferrous metal housing shall have the flange faces preserved with a coating of commercial preservative.

d. Each governor actuator shall be placed into a MIL-PRF-131K Class 1 (Non- Woven) bag for easy handling/set-up in packing of governor actuator.

5.2 Packaging: Each overhauled and preserved governor actuator shall be individually packaged in its own enclosed wooden box. The box shall be assembled with stainless steel wood screws. Governor actuator shall be bolted to the inside of the box and shall be constructed in such a manner as to prevent the governor actuator from shifting within. Box shall be capable of protecting the governor actuator from damage during multiple shipments by commercial carrier.

5.3 Marking: Each preserved, packed, and packaged item shall be marked in the upper left-hand side of the two longest sides, (two opposite sides if square) of each box, carton, package, etc. The lettering shall be black painted stencil and permanently affixed to each container. The lettering shall be at least 1" high, and be applied on a highly contrasting white painted background.

5.3.1 This marking shall consist of the STOCK NUMBER, ITEM NAME, PART NUMBER, SERIAL NUMBER, CONTRACT NUMBER, SHIPPING WEIGHT (in lbs.), CONDITION CODE, UNIT OF ISSUE with QUANTITY (1EA) and the words COAST GUARD SFLC MATERIAL

CONDITION "A" REUSABLE CONTAINER, DO NOT DESTROY, REMOVE BOLTS, LIFT CRATE

FROM SKID.

5.3.2 See below for marking layout:

STOCK NUMBER: 2990-01-416-7304

ITEM NAME: Actuator, Governor

PART NUMBER: 111-1746

SERIAL NUMBER: (As determined) CONTRACT NUMBER: (See Contract) SHIPPING WEIGHT: (As determined)

CONDITION CODE: CONDITION A

QUANTITY & UNIT OF ISSUE: 1-EA

OTHER DATA AS DIRECTED: COAST GUARD SFLC MATERIAL,

REUSABLE CONTAINER, DO NOT DESTROY

REMOVE BOLTS, LIFT CRATE SKID

5.4 Bar Coding: Bar coding shall be supplied on all CLIN's except for those that require data submissions only.

5.4.1 All bar code labels shall be in accordance with SFLC specification D- 00-0100 Rev. G

1. The actual labels shall be Type "V", Grade "A", Style "2", Composition "B" with plastic laminate.

2. Each label shall contain encoded data for the Stock Number, part number, and Contract Number.

6. Notes:

Source of Documents:

Commercial:

Steel Structures Painting Council 40 24th Street Pittsburgh, PA 15222

(412) 281-2331

Naval Publication and Forms Center 5801 Tabor Ave.

Philadelphia Pa. 19120 215-697-2000 / 2626

American National Standards Institute (ANSI) 1430 Broadway New York, NY 10018 212-642-4900 undergo the below preservation requirements:

a. Governor actuator shall be drained and dried of all test fluid.

b. Intake and discharge ports shall have plastic caps or wood covers installed.

c. Governor actuator that has ferrous metal housing shall have the flange faces preserved with a coating of commercial preservative.

d. Each governor actuator shall be placed into a MIL-PRF-131K Class 1 (Non- Woven) bag for easy handling/set-up in packing of governor actuator.

5.2 Packaging: Each overhauled and preserved governor actuator shall be individually packaged in its own enclosed wooden box. The box shall be assembled with stainless steel wood screws. Governor actuator shall be bolted to the inside of the box and shall be constructed in such a manner as to prevent the governor actuator from shifting within. Box shall be capable of protecting the governor actuator from damage during multiple shipments by commercial carrier.

5.3 Marking: Each preserved, packed, and packaged item shall be marked in the upper left-hand side of the two longest sides, (two opposite sides if square) of each box, carton, package, etc. The lettering shall be black painted stencil and permanently affixed to each container. The lettering shall be at least 1" high, and be applied on a highly contrasting white painted background.

5.3.1 This marking shall consist of the STOCK NUMBER, ITEM NAME, PART NUMBER, SERIAL NUMBER, CONTRACT NUMBER, SHIPPING WEIGHT (in lbs.), CONDITION CODE, UNIT OF ISSUE with QUANTITY (1EA) and the words COAST GUARD SFLC MATERIAL

CONDITION "A" REUSABLE CONTAINER, DO NOT DESTROY, REMOVE BOLTS, LIFT CRATE

FROM SKID.

5.3.2 See below for marking layout:

STOCK NUMBER: 2990-01-416-7304

ITEM NAME: Actuator, Governor

PART NUMBER: 111-1746

SERIAL NUMBER: (As determined) CONTRACT NUMBER: (See Contract) SHIPPING WEIGHT: (As determined)

CONDITION CODE: CONDITION A

QUANTITY & UNIT OF ISSUE: 1-EA

OTHER DATA AS DIRECTED: COAST GUARD SFLC MATERIAL,

REUSABLE CONTAINER, DO NOT DESTROY

REMOVE BOLTS, LIFT CRATE SKID

5.4 Bar Coding: Bar coding shall be supplied on all CLIN's except for those that require data submissions only.

5.4.1 All bar code labels shall be in accordance with SFLC specification D- 00-0100 Rev. G

1. The actual labels shall be Type "V", Grade "A", Style "2", Composition "B" with plastic laminate.

2. Each label shall contain encoded data for the Stock Number, part number, and Contract Number.

6. Notes:

Source of Documents:

Commercial:

Steel Structures Painting Council 40 24th Street Pittsburgh, PA 15222

(412) 281-2331

Naval Publication and Forms Center 5801 Tabor Ave.

Philadelphia Pa. 19120 215-697-2000 / 2626

American National Standards Institute (ANSI) 1430 Broadway New York, NY 10018 212-642-4900

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

2990-01-416-7304

ACTUATOR,GOVERNOR

111-1746

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES: