OVERHAUL DESCR.pdf

PDF 9 KB Posted

Attached to
SHUT OFF MECHANICAL Federal contract opportunity
Solicitation number
70Z08024QAG016
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains a solicitation for the overhaul, inspection, and possible repair of shutoff mechanical parts for the United States Coast Guard. The Coast Guard is seeking quotes to open, inspect, and report on nine shutoff mechanical parts with stock number 2990-01-122-3827 and part number 5N3392. Vendors must provide an inspection cost per item and a firm fixed repair price per item. Quotes are due by March 20, 2024 at 0900 hours and must be emailed to the contracting officer. Award will be made to the lowest priced technically acceptable offer. Delivery is required by June 11, 2024 to the Coast Guard facility in Baltimore. The successful contractor must comply with packaging, marking, and other preservation requirements detailed in the overhaul description.

View the file

Other files for this federal contract opportunity

Other files attached to SHUT OFF MECHANICAL, newest first.
File Type Posted
Mil-Std 2073.pdf PDF
FAR CLAUSE SEPT 2021.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME SHUTOFF MECHANICAL

STOCK NUMBER 2990-01-122-3827

PART NUMBER 5N3392

USED ON 270 WMEC SSDG

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

Each SHUT-OFF MECHANICAL (Over-speed Trip) shall be inspected in order to determine the extent of required repairs. A Condition Report and Cost Proposal shall be provided to the Coast Guard Contracting Officer 30 days from receipt of each over-speed trip, which shall include: the required repairs needed for each over-speed trip, new replacement parts required individually priced, labor rate, labor hours required, and a total estimate for all required services which shall also include any charges for labor in the repair or building of a new shipping container. The part number, NSN and serial number for each SAFETY SHUT-OFF TRIP shall be documented on the Condition Report. If not assigned, the Contractor shall assign a serial number. The serial number shall be stamped into each Shut-Off, Mechanical.

OVERHAUL REQUIREMENTS:

Each OVERSPEED TRIP shall be overhauled to a condition which shall restore the operating and performance characteristics to the OEM's like new current design and technical specifications. Overhaul shall be performed in accordance with CATERPILLER specifications and standards, which are proprietary to CATERPILLER. All repair parts shall be genuine CATERPILLER manufactured parts. The over-speed trip carrier will be set-up for the 1416 +/- 20 RPM engine speed trip or 660 +/- 12.5 RPM with the over-speed off the engine for testing. After completion of all repairs a final inspection/assembly report shall be submitted to the Contracting Officer for approval. This report shall have all OEM minimum and maximum design dimensions and clearances of all attributes along with the actual dimensions documented. All out of tolerance dimensions shall be circled or highlighted.

A waiver request shall be submitted with all out of tolerance conditions stating why the out of tolerance condition is acceptable along with a statement that the function and performance of the SAFETY SHUT-OFFVERSPEED TRIP will not be diminished or compromised.

WARRANTY:

A. Standard Manufacturer's Warranty

X B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for

90 days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

SHELF LIFE CD 0

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

OVERHAUL DESCRIPTION

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

2990-01-122-3827

SHUTOFF MECHANICAL

5N3392

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

CATERPILLAR, INC.

100 NE ADAMS ST

PEORIA, IL 61629

BRACHT_GARY_D@CAT.COM

JOYCE_DUMIN@CARTERMACHINERY.COM

CP BRODEUR, INC.

24 NORTH FRONT STREET

NEW BEDFORD, MA 02740

POC: DONNA SANTOS

EMAIL: DONNA@CPBRODEUR.COM

CARTER MACHINERY COMPANY

1330 LYNCHBURG TPKE

SALEM, VA. 24153

PH: 540-682-2551

JOYCE_DUMIN@CARTERMACHINERY.COM

WRITTEN BY:

DATE :

JORDYNNE PUSLOSKIE

15 MAR 24

Cost Estimate for Overhaul NOT TO EXCEED: $3,586.45

File details come from the government source that posted it. Updated .