Other Than Full and Open_Salinity Panel SSJ_Redacted.pdf

PDF 209 KB Posted

Attached to
USS FRANK CABLE SALINITY PANEL PARTS Federal contract opportunity
Solicitation number
N4044625Q0007
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a Justification for Other Than Full and Open Competition (J&A) memorandum for the USS FRANK CABLE salinity panel repair. The procurement is for Aqua-Chem to provide modification parts kits to replace the existing and obsolete McNab salinity indication system on two distilling plants, with a required delivery date of 30 September 2025. The anticipated dollar value of the procurement is $16,700, and the justification is based on exclusive licensing agreements, as Aqua-Chem is the sole manufacturer of the conversion kit and requires their own technicians to install and service the salinity systems. The current McNab salinity panel is old and obsolete, with replacement parts no longer supported, necessitating this single-source procurement to ensure compatibility with the installed distilling plants.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 Ver 2.0 (01 July 2018)

2. X EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

The current Mcnab salinity panel is old, obsolete, and replacement parts are no longer supported. Aqua-chem is to provide a supportable model that is compatible with the installed distilling plants. Aqua-Chem does not have distributors and manufactures the conversion kit to be installed. Aqua- Chem also requires Aqua-Chem technicians to install and service their parts on the salinity systems..

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. X OTHER REASON:

a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: ___________________________

b. _____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): ___________________

ii. Identify other vessels with this Make / Model:

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. _____ OTHER:

3 Ver 2.0 (01 July 2018)

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: ______________________________

b. Required delivery date / Period of Performance:

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time: _____________________________

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number: _________________________________________

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: $16,700

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Contracting Officer / Date

File details come from the government source that posted it. Updated .