OTHER THAN FULL AND OPEN_Redacted.pdf

PDF 377 KB Posted

Attached to
USNS COMFORT (T-AH 20) Boiler Safety Valves
Solicitation number
N3220523Q2128
Issued by

View the file

Other files

File Type Posted
CSS 23Q2128.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 Ver 2.0 (01 June 2018)

II. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. ☐ Only one responsible source (select all that apply):

1. ☐ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

b. If drawings are included, who is identified as “owning” the drawings.

2. ☐ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. ☒ OTHER REASON:

a. ☒ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: 10.6-002-ALL IDENTIFICATION OF CRITICAL

EQUIPMENT

ii. Regulatory Requirements: These safety valves and safety relief valves are required per 46 CFR 52.01-120 to operate in a specific sequence, have specific capacity and specific nominal size.

3 Ver 2.0 (01 June 2018)

b. ☒ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): Baker Hughes-Consolidated

Model 1726E-2-S-X1-I9-F1-RL

ii. Identify other vessels with this Make / Model:

Theses safety and relief valves will be installed on both USNS COMFORT and

USNS MERCY.

c. ☒ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

Crosby SK-2427-V Style HNB (Boiler Superheater Safety Valve)

ii. Describe how the equipment must be compatible with the existing configuration.

These safety valves and safety relief valves are required per 46 CFR 52.01-120 to operate in a specific sequence, have specific capacity and specific nominal size.

- Sequence – The setting of the Super Heater Safety Valve shall not exceed the design pressure of the super heater outlet flange or the main steam piping beyond the super heater. To prevent damage to the super heater, the drum safety valve shall be set at a pressure not less than that of the super heater safety valve setting plus 5 pounds minimum plus approximately the normal load pressure drop through the super heater and associated piping, including the controlled de-super heater if fitted.

- Capacity - The total rated relieving capacity of drum and Super Heater as certified by the valve manufacturer shall not be less than the maximum generating capacity of the boiler which shall be determined and certified by the boiler manufacturer. (See attachment Boiler Super Heater Safety Cut Sheets)

- Size - On new installations the safety valve nominal size for propulsion boilers and super heaters must not be less than 38mm (1 1/2 in.) nor more than 102mm (4 in.). Safety valves 38mm (1 1/2 in.) to 114mm (4 1/2 in.) may be used for replacements on existing boilers.). (See attachment Boiler Super Heater Safety Cut Sheets)

The selected valves from Baker Hughes Consolidated Safety have had design calculations completed to provide the correct sequence and capacity to support 46 CFR 52.01-120. In addition, to having the correct capacity and sequence the modification to boiler steam exhaust piping and hand easing gear have been based on these specific valves. (See attachment Drawing 221-8614619)

The purchase of the Baker Hughes Consolidated Safety Valves has been determined to meet the requires of CFR 46 to provide for the safe and reliable operation of the propulsion boilers on the USNS COMFORT.

d. ☐ OTHER:

4 Ver 2.0 (01 June 2018)

4. ☒ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: 15 February 2023

b. Required delivery date / Period of Performance: 30 June 2024

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

This is the second attempt to acquire the super heater safety valves. The first attempted ended with a no bid. It is estimated the total time between solicitation posting and delivery will be 13-months.

d. Estimated production lead time: Estimated lead time for delivery is 10-1/2 months after order is placed.

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

Valves are required for installation in USNS COMFORT’s 2024 ROH occurring May-

September 2024.

f. CASREP Number:

IV. ANTICIPATED DOLLAR VALUE OF PROCUREMENT:

File details come from the government source that posted it. Updated .