This is a Justification and Approval (J&A) document for a non-competitive federal contract award.
The Department of the Navy, Military Sealift Command (MSC) Norfolk is awarding a firm-fixed price contract on a brand name, limited source basis to procure Original Equipment Manufacturer (OEM) spare materials for BERGEN Engine AS systems supporting the USNS OSCAR V. PETERSON (T-AO 206). The required supplies are Ship Service Diesel Generator (SSDG) components: 40 main bearing shells, 24 camshafts, 1 crankshaft, 1 expansion joint, 1 turbo, 1 generator, and 2 thrust rings. The estimated contract value is $1.3 million, funded by US Navy O&M,N FY26 funds, with a required delivery date of September 30, 2026. The contracting officer determined the anticipated cost to be fair and reasonable.
The justification for non-competitive procurement is based on 10 U.S.C. 3204(a)(1), citing that only one responsible source exists and no other supplies or services will satisfy agency requirements. The BERGEN generator systems installed on the vessel must be maintained for national defense mission performance. MSC posted a sources sought notice on the SAM website on November 3, 2025, which generated interest from two other potential offerors. However, MSC has no current plans to compete future contracts for these supplies due to the single-source requirement, though will reassess if another potential source emerges. Similar SSDG overhaul material requirements have been previously procured by MSC through purchase orders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N3220526Q70090002 SF 30.pdf | ||
| Solicitation - N3220526Q7009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navy Marine Corps Acquisition Regulation Supplement MARCH 2026 (Change 26-03)
ANNEX 1 JUSTIFICATION AND APPROVAL
J&A No. N10426Q7009
JUSTIFICATION AND APPROVAL
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity. Department of the Navy, Military Sealift Command (MSC) Norfolk
2. Description of the Action Being Approved. Award a firm-fixed price contract on a Brand Name, limited source basis to procure Original Equipment Manufacturer (OEM) material for BERGEN Engine AS in support of the USNS OSCAR V. PETERSON (T-AO 206) to provide a Ship Service Diesel Generator (SSDG) spare materials.
3. Description of Supplies/Services. The supplies MSC are procuring are main bear shells, camshafts, crankshaft, expansion joint, turbo, generator and thrust rings. The quantities for each are 40 main bear shells, 24 camshafts, 1 expansion joint, 1 crankshaft, 1 turbo, 1 generator and 2 thrust rings. The estimated value is $1.3M being funded by US Navy O&MN FY26 Funds. The required delivery date for this is expected to be September 30, 2026. The Production and Delivery Lead times for these purifiers require that they be purchased during FY26 with FY26 O&M,N funds in order that they be produced and delivered on time.
4. Statutory Authority Permitting Other Than Full and Open Competition. 10 U.S.C. 3204(a)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.
5. Rationale Justifying Use of Cited Statutory Authority. The BERGEN generator systems installed on board the USNS OSCAR V. PETERSON TAO 206 is applicable to T-AO 205 - T- AO and must be maintained for the vessel to perform their required national defense mission.
6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable. A sources sought was posted on the SAM website on November 03, 2025 and two other potential offerors showed an interest in this requirement. Similar requirements for end item use for SSDG overhaul material was procured by the Military Sealift Command on previous POs.
7. Determination of Fair and Reasonable Cost. The Contracting Officer has determined the anticipated cost to the Government of the supplies/services covered by this J&A will be fair and reasonable.
8. Actions to Remove Barriers to Future Competition. For the reasons set forth in Paragraph 5, MSC has no plans at this time to compete future contracts for the types of supplies/services covered by this document. If another potential source emerges, MSC will assess whether competition for future requirements is feasible.
Navy Marine Corps Acquisition Regulation Supplement MARCH 2026 (Change 26-03)
File details come from the government source that posted it. Updated .