Other Than Full and Open Memo_Redacted.pdf

PDF 302 KB Posted

Attached to
USS EMORY S. LAND (AS 39) Main Reduction Gear Repair Parts
Solicitation number
N3220525Q2133
Issued by

About this file

This document is an Other Than Full and Open Memo related to a federal contract opportunity for the USS EMORY S. LAND (AS 39) Main Reduction Gear Repair Parts. The memo indicates this is an urgent and compelling procurement, with a need for the required supplies or services to avoid a work stoppage or mission-critical impact. The anticipated dollar value of the procurement is not provided. The related federal contract opportunity is a solicitation for the USS EMORY S. LAND (AS 39) Main Reduction Gear Repair Parts, issued by the Department of the Navy Military Sealift Command. The solicitation provides a Combined Synopsis/Solicitation and the redacted Other Than Full and Open Memo. No additional details about the required products or services, response dates, award dates, pricing terms, set asides, incumbents, or other salient information are included in the provided documents.

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation_REV 1.docx DOCX document
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Ver 2.0 (01 July 2018)

ii. Describe how the equipment must be compatible with the existing configuration.

d. _____ OTHER:

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: ______________________________

b. Required delivery date / Period of Performance: _____________________________

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time: ______________________________

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number:

IV. ANTICIPATED DOLLAR VALUE OF PROCUREMENT: