Other than Full and Open Memo Redacted.pdf
PDF 102 KB Posted
- Solicitation number
- N3220524Q0200
About this file
This document is a memorandum explaining the use of other than full and open competition for a simplified acquisition for replacement of CRANE ChemPharma & Energy seawater suction and discharge crane valves for the USNS MEDGAR EVERS (T-AKE 13) vessel. The memorandum describes the required equipment, the basis for the sole source justification, including proprietary rights, standardization, and the Government's inability to determine equivalency to the OEM parts. It indicates the simplified acquisition threshold will not be exceeded. The related federal contract opportunity is a solicitation for the valve replacement, with a performance period through September 30, 2024. The solicitation references this memorandum explaining the sole-source award to CRANE ChemPharma & Energy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Solicitation 24Q0200.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: 03/06/2024
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): _REQ#N2900240664005 ERP
PR#1301146750_____________________________________________
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include CSW SUCTION & DISCHARGE
CRANE VALVES
a) the name of the required source or brand name
CRANE ChemPharma & Energy
b) the required delivery date/period of performance and
09/30/2024
c) its intended use.
Required to replace existing Central Sea Water Suction & Discharge Valves
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
Valve Automation and Controls, Cage: 0YRW0
CRANE ChemPharma & Energy
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. __X___ Only one responsible source (select all that apply):
1. __X___ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
2 Ver 2.0 (01 June 2018)
CRANE ChemPharma & Energy owns the proprietary rights to the drawings of the valves.
b. If drawings are included, who is identified as “owning” the drawings.
CRANE ChemPharma & Energy
2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. ___X__ OTHER REASON:
a. ___X__ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: 10.6-002-ALL; Salt water supply header cannot be isolated to complete maintenance on the salt water system. Current configuration does not allow the operator to change SW inlet valve to the LTFW coolers without securing the entire salt water system and operating the emergency diesel engine.
b. __X___ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): CRANE ChemPharma & Energy/20JG57731
ii. Identify other vessels with this Make / Model:
USNS, LEWIS AND CLARK, USNS SACAGAWEA, USNS ALAN
SHEPARD, USNS RICHARD BYRD, USNS ROBERT PEARY, USNS
AMELIA EARHART, USNS CARL BRASHEAR, USNS WALLY
SCHIRRA, USNS MATTHEW PERRY,USNS CHARLES DREW,
3 Ver 2.0 (01 June 2018)
USNS WASHINGTON CHAMBERS, USNS WILLIAM MCLEAN,
USNS MEDGAR EVERS, USNS CESAR CHAVEZ
c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. ___X__ OTHER:
MSC does not have manufacturing and technical information required to evaluate and determine whether non-OEM service and replacement parts offered are equivalent to the OEM components and replacement parts.
4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ______________________________
b. Required delivery date / Period of Performance: _____________________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time: ______________________________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _________________________________________
File details come from the government source that posted it. Updated .