This is a Statement of Work (SOW) for the National Nuclear Security Administration (NNSA), Office of Secure Transportation (OST), for the acquisition and conversion of a used Boeing 737-800 aircraft into a Combi configuration.

The contractor must acquire a single Boeing 737-800 Series aircraft manufactured no earlier than 2007 with no more than 20,000 total cycles, then convert it to a passenger/cargo Combi configuration capable of carrying five pallet positions and 90 passengers. The aircraft must meet specific requirements including CFM International engines, standard IFR avionics with U13.0 software, Rockwell Collins avionics, and installation of supplemental type certificates (STCs) for floor modifications, cargo door, cargo loading system (supporting both commercial and 463L pallets), combi interior, and aft airstairs with half galley. Additional installations include Aircraft HUD 4000 Model or equivalent, 5G-tolerant Low Range Radio Altimeters, forward airstairs, and paint matching OST/AOD's fleet. The aircraft must have a current FAA Certificate of Airworthiness and comply with all applicable airworthiness directives and service bulletins. The contractor is responsible for all three phases: Phase I pre-purchase inspection of records and physical aircraft condition anywhere in the world; Phase II post-purchase conversion and modifications with general maintenance and transition to the Government's Maintenance Inspection Program; and Phase III final inspection including an airworthiness demonstration flight and government acceptance. The contractor must possess a 14 CFR Part 145 Repair Station certification and ensure all work complies with FAA regulations. Delivery is required no later than 12 months after contract award. The contractor shall conduct bi-weekly status review meetings and quarterly program management reviews at its facility, participate in a post-award kickoff meeting in Albuquerque, New Mexico, and provide comprehensive deliverables including aircraft flight manuals, STC supplements, software licenses, and complete aircraft records.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL NUCLEAR SECURITY ADMINISTRATION

OFFICE OF SECURE TRANSPORTATION

OST ACQUISITION OF BOEING 737 – 800

WITH COMBI CONFIGURATION

STATEMENT OF WORK

July 14, 2026

P a g e 2 | 18

OST/AOD BOEING STATEMENT OF WORK 737-800 COMBI

I. INTRODUCTION

The National Nuclear Security Administration (NNSA) is a separately organized agency within the Department of Energy (DOE) and NNSA is responsible for enhancing national security through the military application of nuclear energy. The Office of Secure Transportation (OST), within the NNSA, is responsible for the safe and secure transport of nuclear weapons and special nuclear materials (SNM). The OST’s primary airlift missions include: (1) providing 24/7 alert aircraft for Emergency Response missions; (2) providing safe and secure transportation of Department of Energy personnel and SNM cargo (3) transporting Federal Personnel in response to emergency and/or national incidents when directed; and (4) transporting Federal Personnel and their equipment to conduct various training exercises throughout the continental United States.

To fulfill its airlift missions, the OST’s Aviation Operations Division (AOD) owns and operates transport aircraft which comprise of Boeing 737-400 “Combi” aircraft, and 737-700 FlexCombi (FC) aircraft. The Boeing 737-400 Combi aircraft were acquired in 2011 as a result of a detailed business case study conducted by Conklin & DeDecker in 2008.1 The 737-700 FC aircraft was acquired in 2021 to augment the existing fleet as recommended in the Conklin &DeDecker case study. The purchase of the 737-800 Combi will replace one of the aging 737- 400 Combi aircraft.

II. BACKGROUND

This Statement or Work (SOW) is to procure a used Boeing 737-800 Series which will be converted to a Combi configuration to allow OST to carry out its national security mission. NNSA issued a previously posted RFI (2020) specified that NNSA was seeking brokerage support services in terms of searching, assessing, and recommending between the top three to five used Boeing 737-800 Series aircraft based on the general condition of the aircraft, maintenance projections, records, and compliance with FAA requirements.

The Boeing 737- 800 Series aircraft shall be operated under the requirements of 41 C.F.R. Part 102-33 Public Operations in the National Airspace and an occasional flight under OST/AOD’s 14 C.F.R. Part 125 Letter of Deviation Authority issued by the Federal Aviation Administration’s (FAA) Part 125 Certificate Holding District Office (CHDO), SO61, for OST’s current fleet of 737-400, and 737-700 aircraft.2 The Boeing 737-800 Series aircraft shall be flown by OST/AOD Federal Pilots with the maintenance of the aircraft performed by an aircraft maintenance support service contractor under 14 C.F.R. Parts 43, 91, 145, and AOD’s Policy & Procedures Manual (PPM) and Maintenance Inspection Program (MIP) which will be amended to include the new aircraft.

III. SCOPE

The intent of this contract is for the acquisition of a Boeing 737- 800 Series aircraft that will be converted into a Combi aircraft. The activities required to procure the aircraft are categorized into three (3) distinct phases:

Phase I – Pre-Purchase Activities that involve a physical inspection of the records, avionics, and a physical inspection of the aircraft and Acquisition of Boeing 737- 800 aircraft;3

Phase II – Post-Purchase activities that involve:

a) Converting the Boeing 737-800 into passenger/freight Combi in accordance with the

1 At the time, Conklin & DeDecker’s business case study recommended that OST procure up to three aircraft. However, subject to the availability of funds, OST only received Congressional appropriations for two large transport aircraft.

2 OST/AOD will seek approval from CHDO to add the Boeing 737-800 aircraft to its existing Part 125 LODA.

3 See Appendix A of this SOW for a complete listing of the Phase I activities.

P a g e 3 | 18

Supplemental Type Certificates (STCs) to include modifications of the floor, installation of a cargo door, and installation of the cargo loading system.

b) Installing the aft (rear) airstairs in accordance with a STC for the aft airstairs;

c) Providing the general maintenance and oversight of any modifications including any routine/non-routine maintenance of the Boeing 737-800 aircraft utilizing the Contractor’s Part 145 Maintenance, Repair; and

d) Transitioning the maintenance and oversight program to the Government’s Maintenance Inspection Program (MIP);4 and

Phase III – A Post-Purchase Final Inspection involving an Airworthiness Demonstration Flight and Final Government Acceptance of the Boeing 737-800 Combi, and receipt of any deliverables such as aircraft software and licenses.5

The pre-purchase inspections shall be required on aircraft anywhere in the world. The Contractor shall work with OST/AOD representatives who should be on site during the inspections. The Contractor shall show and explain all major issues identified during the inspection to ensure that OST/AOD has a full and firm understanding of the issues and the seriousness of those issues.

Once acquired, the Contractor shall convert the Boeing 737-800 aircraft into a Combi configuration which allows for a five (5) pallet position main-deck freight configuration, and a 90-seat passenger configuration in accordance with the following Supplemental Type Certificates (STCs):

Modification of Floor (need KF Combi US STC #) Installation of Cargo Door (need KF Combi US STC #) ST4544AT Installation of Cargo Loading System (CLS shall be capable of commercial and 463L pallet system) Installation of Combi Interior (need KF Combi US STC #)

In addition, the Contractor is responsible for installing the aft (rear) airstairs in accordance with the following

STC:

ST01143LA Installation of Aft (Rear) Airstairs, with half galley in the G4B position.

The Contractor shall also install the Aircraft HUD 4000 Model/HUD Control Panel (if not already installed on the Boeing 737-800) or equivalent and be responsible for ensuring that the Boeing 737-800 Combi has a decorative paint scheme that matches OST/AOD’s current fleet aircraft, or matches the paint scheme provided by OST/AOD.

The Contractor shall also comply with the Table 1 Requirements below regarding the C-Check and D-Check.

Specifically, the Contractor shall ensure that all Table 1 SOW Requirements with regard to the C-Check and D-Check are met prior to the Government’s Final Acceptance. Therefore, if the date of the last C-Check is more than 365 days from the date (TBD) of the Government’s Final Acceptance, the Contractor should include the cost of the C-Check. Similarly, if the date of the last D-Check is more than 1,460 days (4 years) from the date of (TBD) of the Government’s Final Acceptance, the Contractor shall include the cost of the D-Check.

Other Modifications/Installations

Subject to the availability of funds and the Government’s schedule, if directed by the Government, the

4 See Appendix B of this SOW for a complete listing of the Phase II activities.

5 See Appendix C of this SOW for a complete listing of the Phase III activities.

P a g e 4 | 18

Contractor shall do the following:

Install the forward airstairs by utilizing existing Boeing Service Bulletin or existing STC and installing the forward airstairs; and

Installing 5G tolerant Low Range Radio Altimeters (LRRA) by utilizing existing Boeing Service Bulletin or existing STC.

The Contractor shall deliver the Boeing 737-800 Combi to OST/AOD and all STCs for final inspection and acceptance as detailed in Section 4.9 of this SOW. Upon acceptance, OST/AOD shall be responsible for the airworthiness and shall operate the aircraft in accordance with 41 C.F.R. Part 102-33 Public Operations and 14 C.F.R. Part 125 Letter of Deviation Authority.

IV. GENERAL REQUIREMENTS

The Contractor shall provide all personnel, facilities, and equipment to acquire, convert, modify, alter, and deliver one (1) Boeing 737-800 Combi that meet NNSA/OST’s requirements as outlined in this SOW. The Boeing 737-800 Combi shall be delivered no later than 12 months after contract award. The Boeing 737-800 aircraft shall meet the following general requirements for airframe and engine cycle limits at the time of the Government’s Final Inspection and Airworthiness Demonstration Flight shown in Table 1 below:

Table 1 – OST/AOD Boeing 737-800 Combi Aircraft Requirements Commensurate with the Government’s Final Acceptance under Phase III

Requirement Description Manufacturer The Boeing Company

Model Boeing 737-800

Condition Used

Year/Total Number of Cycles (Takeoffs/Landings)

No older than 2007 and not more than 20,000 Cycles

Engine 1 Make/Model CFM International Engine 1 Cycles (Engine Start, Takeoff, Landing, Engine Shutdown)

Not greater than 20,000-22,000 cycles since new and compliance with all applicable Service Bulletins

Engine 2 Make/Model CFM International Engine 2 Cycles (Engine Start, Takeoff, Landing, Engine Shutdown)

Not greater than 15,000 cycles since new and compliance with all applicable Service Bulletins

Auxiliary Power Unit and Number of Hours Not greater than 7,000 hours since new Avionics/Radios Standard Boeing 737-800 Avionics/Radios with

U13.0 Software installed in the dual FMSs with preference for menu option to access ACMs

Provide copies and transfer licenses of all currently installed software on the aircraft at delivery

FMC Nav Database loader (if installed) shall be replaced by adapter capable of loading by ARINC 615 PDL or PMAT Loader

Nose Landing Gear and Main Landing Gear No greater than 12,000 cycles since new and not less than 6 years remaining to the next overhaul (overhaul required every 9-10 years)

Main Landing Gear shall have or be equipped

P a g e 5 | 18 with shimmy dampeners per FAA AD MLG shall have carbon brakes, with no less than 50% wear remaining, and wheel assemblies suitable for carbon brake installation

Aft Pickle-fork fitting Aircraft aft pickle-fork fitting shall comply with FAA’s Airworthiness Directive (AD) for pickle-fork inspection and Boeing Service Bulletins (SBs)

Exterior Paint to match OST/AOD Fleet or paint scheme provided by OST/AOD

Interior Passenger seats shall not be more than 5 years old or shall be supported for a minimum of 10 years post modification

Passenger seats shall have power ports Inspection Status No more than 365 days (1 year) since last C-Check

No more than 1460 days (4 years) since last D check Other Requirements Accommodate OST/AOD flight crew consisting of 2 pilots with USB C ports in cockpit;

Cockpit seating for 2 pilots and 1 jump seat;

All seats and overhead comparts shall become

Government property upon purchase of the aircraft;6

Maximum age (manufactured in 2006 or later);

Certification for Day, Night, Known Icing, Instrument Flight Rules (IFR), Reduced Vertical Separation Minimum (RVSM);

Cockpit avionics Standard IFR Avionics, Terrain Avoidance and Warning System (TAWS), Enhanced Ground Proximity Warning System (EGPWS), Traffic Alert and Collision Avoidance System (TCAS) II, Automatic Dependent Surveillance-Broadcast (ADS-B) out, and

ACARS;

Cockpit displays Electronic Flight Instrumentation System (EFIS)

Communications Hi-speed internet access in cabin; STARLINK ATACS desired.

FAA Certificate of airworthiness;

Meet FAA mandated noise and environment standards;

Airline style overhead bins and PSUs;

1 Lavatory forward, 2 lavatories aft.

Forward airstairs (desired)7

Approved smoke barriers/fire suppression for main deck cargo area;

Aft stairs, with half galley;

6 Note that any excess seats shall be used by the Government as spares for the Combi Configuration as described above.

7 The Boeing 737-800 aircraft shall have the forward airstairs installed by Boeing at the time of manufacture. However, if the aircraft did not include the forward airstairs, the Contractor may be required to install the forward air stairs.

P a g e 6 | 18

Cargo door capable of accommodating 88”x125” or 88”x108” pallets;

Auxiliary Power Unit;

FAA approved cargo loading system (must accept commercial and 463L pallets 88”x108” and 88”x125”);

Cargo Fire Suppression in the forward and aft lower cargo bays;

HUD 4000 model or equivalent system/HUD Control Panel (HCP) (if not already installed);

Satellite Communication (SATCOM) phone in cockpit MCDU accessible;

Paint to match current fleet of OST/AOD Boeing Combi Aircraft (White/Gray/Gold/Blue), or as directed;

Two flight attendant FA seats in passenger compartment, 2 FA seats in forward compartment.

Blended Winglets or Split Scimitar Winglets

(SSW)

Performance Requirements Avionics: Rockwell Collins avionics Engine: 2x CFM56- 7B26/27 Turbofan (27k desired) Power: 26,100/27,300 pound-force Max Cruise Speed: 460 knots/ 529 mph Approach Speed (Vref): 137 knots/157.7 mph Travel range: 3,850 Nautical Miles/3,348 miles Fuel Economy: 14.6 pounds/nautical mile or 12.7 pounds/mile Service Ceiling: 41,000 feet Rate of Climb: 3000 feet / minute Take-Off Distance: 6,561.60 feet Landing Distance: 4,593.12 feet

Weights

Max Take-Off Weight: 174,200 lbs.

/79,015 kg Max Landing Weight: 146,300 lbs.

/66,360 kg Max Payload: 51,100 lbs.

/23,178 kg Max Fuel Load: 6,875 gallons / 26,025 litres

Dimensions

P a g e 7 | 18

Cabin Height: 7.22 feet Cabin Width: 11.58 feet Cabin Length: 79.17 feet Exterior Length: 110.33 feet Tail height: 41.24 feet Fuselage Diameter: 12.34 feet Wing Span/Rotor Diameter: 117.42 feet Wing Tips: Blended Tips or Split Scimitar Winglet

4.1 PERFORMANCE LOCATION

Unless otherwise noted or directed by OST/AOD, all aircraft inspections, modifications, maintenance, flight acceptance, and final delivery to the Government shall be conducted at the Contractor and/or Subcontractor’s site or facility.

4.2 APPLICABLE REGULATIONS/DOCUMENTS

The Contractor shall comply with the following documents in Table 2 to the extent set forth in this SOW. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW takes precedence. Nothing in this SOW supersedes applicable laws and regulations unless a specific exemption has been obtained.

Table 2 – FAA Documentation and References

Document Number Title FAA TCDS A16WE Rev 64 or later FAA approved revision

Type Certification Data Sheet Model 737-800 (CFM56-7B26/27 engines) (27K desired)

14 CFR Part 21 Certification procedures for products and parts

14 CFR Part 39 Airworthiness Directives

FAA Form 8130-9 FAA Statement of Conformity

Federal Aviation Administration (FAA) 8100-2

FAA Standard Airworthiness Certificate

Federal Aviation Administration (FAA) Order 8110.4C

FAA Type Certification

Federal Aviation Administration (FAA) Order 8900.1

Flight Standards Information Management System

14 CFR Part 43 Maintenance, Preventative Maintenance, Rebuilding and Alteration

14 CFR Part 91 General Operating and Flight Rules

14 CFR Part 21.137 Quality System

14 CFR Part 25 Airworthiness Standards (To the Certification Basis as defined in FAA Type Certificate data sheet A16WE for the 737-800 aircraft)

P a g e 8 | 18

14 CFR Part 34 Fuel Venting and Exhaust Emission Requirements for Turbine Engine Powered Airplanes (To the Certification Basis as defined in FAA Type Certificate data sheet A16WE for the 737-800 aircraft)

14 CFR Part 36 Noise Standards: Aircraft Type and Airworthiness Certification (To the Certification Basis as defined in FAA Type Certificate data sheet A16WE for the 737-800 aircraft)

14 CFR Part 39 Airworthiness Directives

14 CFR Part 145 14 CFR Part 145.211

Repair Station Quality Control System

Supplemental Type Certificate (STC) # for 737-800 Combi

Note: This is to be determined

ADS-B Out DO-260B compliant with 14 CFR 91.225 and 91.227

RVSM FAA Type Certificate data sheet A16WE for the 737-800 aircraft

SFAR 88 FAA Type Certificate data sheet A16WE for the 737-800 aircraft

4.3 COMPLIANCE WITH FAA REQUIREMENTS

The Contractor shall perform all work to meet the applicable requirements of the airworthiness standards of 14 CFR Part 25, and as defined by the 737-800 Certification Basis in Type Certificate Data Sheet (TCDS) A16WE, 14 CFR Part 91 Operating Regulations, and SOW Appendix A. The aircraft shall be certified in accordance with 14 CFR Part 25 (airworthiness standards) for all Combi configurations. The FAA regulations will take precedence over any possible conflicting requirements contained in the SOW with the exception of the combined passenger-cargo design and/or if the SOW is more restrictive. The Contractor shall notify the Contracting Officer (CO) and Contracting Officer’s Representative (COR) in the event of a conflict.

4.4 CONTRACTOR 14 CFR 145 REPAIR STATION

The Contractor shall possess a 14 CFR Part 145 Repair Station to ensure that the acquired Boeing 737-800 aircraft is maintained in accordance with the requirements under 14 CFR Part 25 and with the Original Equipment Manufacturer (OEM) approved maintenance program during the Combi conversion process. Specifically, the Contractor shall maintain the Boeing 737-800 aircraft in accordance with OST/AOD’s FAA approved aircraft Maintenance Inspection Program (MIP). In addition, the Contractor shall ensure all entities performing maintenance and alterations comply with pertinent 14 CFR FAA regulations and maintain a 14 CFR Part 145 authorized repair station Air Agency Certificate (FAA form 8000-4), or Transport Canada Approved Maintenance Organization (AMO) certified under CAR 573, and the supporting documentation showing the repair stations’ capabilities for maintenance, preventive maintenance inspections, and alteration for a 737-800 series aircraft. The Contractor shall also provide and use a commercial quality system required to comply with all work performed under a 14 CFR 145 FAA Repair Station. The Government may perform any necessary inspections, verifications, and assessment of the Contractor's facilities to ascertain the adequacy of the quality system. In the event the Government finds the quality system noncompliant to the accepted system, the Contractor will be required to take corrective action. The Contractor shall plan for the Government to be on-site at the Contractor facilities.

4.5 SERVICE ACTIONS AND AIRWORTHINESS DIRECTIVE COMPLIANCE

The Contractor shall ensure compliance with all FAA Airworthiness Directives (AD) and FAA Aircraft Service Bulletins (SBs) applicable to the specific aircraft airframe, engines, and appliances. The Contractor shall ensure all ADs and SBs applicable to the aircraft with due dates prior and due within 6 months of aircraft delivery to

P a g e 9 | 18

NNSA/OST/AOD are incorporated.

4.6 SYSTEMS SAFETY

The Contractor shall follow all FAA safety procedures for continued System Safety support of the Type Certificate and Supplemental Type Certificate. The Contractor shall provide the Government with access to all documentation that was utilized to show compliance with 14 CFR Part 25.1309.

4.7 RETURN TO SERVICE DOCUMENTATION

The Contractor’s maintenance record and entries shall reflect all work performed in conformance with 14 CFR Part 43, including a return to service statement in accordance with 14 CFR Part 43.5. The Contractor shall document that all major conversions, alterations, modifications, and/or repairs. The Contractor shall deliver the Boeing 737-800 Combi to OST/AOD at the completion of all design, integration, fabrication, installation, and aircraft tests that meet all FAA airworthiness requirements per Table 3 below:

Table 3 – FAA Airworthiness Certification Documentation

Final Airworthiness Certification Documentation

a. Aircraft Logbook demonstrating up to date compliance with the progressive inspection program, including 14 CFR 43.5 return to service for the entire aircraft including airframe, engines and appliances

b. Aircraft Equipment List for the aircraft in its delivered configuration

c. Weight and Balance in accordance with best commercial practices

d. Signed Type Inspection Authorization for modified aircraft (if required)

e. Minimum Equipment list in accordance with 14 CFR 91.213

f. Service Bulletin compliance list with date of compliance

g. AD Compliance list(s) for airframe, engines, and appliances with date and method of compliance, whether recurring, and if recurring the next due date

h. List of all STCs incorporated in Aircraft

i. All required flight manuals, flight manual supplements, Pilots guides and third-party manuals and sources of subscriptions

j. List of all Instructions for continued airworthiness for the delivered aircraft

k. File of all FAA Form 337s and 8110-3’s

l. List of all life limited components by P/N and S/N, installation date, hours, cycles, and current life status

m. Signed Repair Station Safe for Flight release form

n. Repair station work order showing aircraft work completion and approved by QA.

o. ELT inspection in accordance with FAR 91.207

p. Pitot / Static and Altimeter inspections in accordance with 14 CFR Part 43 Appendix E

q. Transponder inspection(s) in accordance with 14 CFR Part 43 Appendix F for all installed transponders

r. Very High Frequency Omni-Directional Range (VOR) check in accordance with 14 CFR 91.171 VOR check in accordance with 14 CFR 91.171

P a g e 10 | 18

Final Airworthiness Certification Documentation

s. A copy of and licenses for all downloadable software for systems installed on the aircraft at time of delivery to

OST/AOD

4.8 SUPPLEMENTAL TYPE CERTIFICATE (STC) HOLDER

The Contractor shall manage the Boeing 737-800 Combi conversion process and ensure that the modified aircraft systems and equipment comply with all applicable FAA requirements for design, operations, and sustainment. The Contractor shall manage the conversion process such that OST/AOD gains all necessary permissions required from the STC holder to operate and maintain the aircraft. Accordingly, the Contractor shall be responsible for all required FAA ground and flight-testing activities under this SOW leading to FAA STC certification for the Boeing 737-800 Combi. All testing activities shall be conducted by the Contractor at the Contractor’s site prior to acceptance of the aircraft by the Government. The Contractor’s procedures shall include ground and flight tasks to verify compliance with this SOW and shall demonstrate that the aircraft meets all requirements. A separate Government inspection and verification shall take place at the Contractor facility prior to acceptance of the aircraft by the Government.

4.9 FINAL OST/AOD INSPECTION/ACCEPTANCE

The Contractor shall perform a Government Airworthiness Demonstration Flight after the Government inspects all aircraft historical documents, maintenance records and flight logs. The Contractor shall have its own pilot(s) fly the aircraft as part of the Final Inspection and Airworthiness Demonstration Flight (ADF). OST/AOD may have one or two of its Federal pilots and a Cabin Safety Specialist on board the aircraft during the ADF. The Government reserves the right to observe the acceptance flight from the co-pilot station in the aircraft. For the ADF, the aircraft will be configured in the Combi configuration as discussed in Section 3 of this SOW. If discrepancies are discovered, the Contractor is responsible for immediate resolution and if necessary, any required additional flights to verify discrepancies have been resolved.

4.10 PUBLICATIONS

The Contractor shall provide the most current commercial technical support publications, in English, for the aircraft. Publications shall include, but not limited to Airplane Flight Manual, Aircraft Maintenance Manual, Structural Repair Manual Wiring Diagram Manual, Fault Isolation Manual, the Illustrated Tool and Equipment List, and all supplement manuals associated with the STC’s installed during the modification of the aircraft.

V. PROJECT MANAGEMENT

The Contractor shall perform administrative, technical, and financial management functions during the course of this effort and shall maintain a status of their effort towards achieving the task objectives, including all technical activities and efforts, problems/deficiencies, impacts, and recommended solutions. This effort will encompass all nonrecurring tasks necessary for delivery of the Boeing 737-800 Combi aircraft to OST/AOD. The Contractor shall keep the Government informed of any problems or delays as they develop and shall provide mitigation solutions to minimize negative impacts.

5.1 Project Manager

The Contractor shall have a Project Manager (PM) who serves as the single point of contact (POC) responsible for the overall management and performance of this effort and eventual contract award. The PM shall be

P a g e 11 | 18 responsible for all contractual and operational requirements of the contract. The PM shall be responsible for and have authority over control and coordination of all work performed under this contract.

5.2 Project Status/Communications

The Contractor shall conduct Status Review Meetings (SRMs) with OST/AOD using either ZOOM, WEBEX, or MICROSOFT TEAMS on a bi-weekly basis until the completion of the Boeing 737-800 Combi conversion.

The purpose of the SRMs are to ensure that the Contractor cover project management operations, task performance and plans, risks and mitigations, schedule, and product and data delivery requirements of the contract. The Contractor shall identify any potential performance or schedule problem areas, management and technical issues, planning, staffing, and requests for OST/AOD assistance. The Contractor shall ensure that all applicable subcontractors and technical subject matter experts (SMEs) are available to participate in the meeting and address specific concerns when appropriate. The OST/AOD reserves the right to attend the meetings face-to-face at the Contractor’s facility.

The bi-weekly SRMs shall address, but are not limited to, the following:

Project progression to include all development, subcontract awards (if applicable), technical, logistical

(tooling, purchasing, completion of hardware) integration status, project schedules, and contractual and financial issues and updated statuses;

Project risks/mitigation strategies;

Logistics status, open issues, concerns;

Long lead items/issues;

STC challenges/issues;

Solutions and mitigation steps to STC challenges in order to minimize schedule impacts;

Contract issues and/or concerns;

5.3 PROJECT AND RISK MANAGEMENT

The Contractor shall plan and conduct Quarterly Program Management Reviews (QPMRs) until the Boeing 737- 800 Combi project is completed. The QPMRs shall be conducted at the Contractor's facility. The QPMRs shall cover project status to allow the Government to review the progress of the Contractor’s efforts. The duration of the QPMR shall be no more than two days. The Contractor shall develop Briefing Materials for the QPMRs based on the following areas:

5.3.1 Technical issues that include requirements, preliminary design, test and certification

5.3.2 Task Completion

5.3.3 Contractual issues

5.3.4 Program Master Schedule status

5.3.5 Engineering status

5.3.6 Certification status

5.3.7 Fabrication status

5.3.8 Aircraft modification status

5.3.9 Test status

5.3.10 Critical and long lead item review

P a g e 12 | 18

5.3.11 Program performance review

5.3.12 Issues and concerns

5.3.13 Action item review

5.3.14 Quality Assurance activities, outputs, tasks, and status

5.4 POST AWARD/KICKOFF MEETING

The Contractor shall participate in a Government hosted post award meeting between Contractor and Government contracting and management personnel, no later than 30 days after contract award at the OST/AOD Hangar Facility located in Albuquerque, New Mexico. The Contractor shall introduce key members of its IPT and present its management procedures, provide progress assessments, review technical and other specialty area status, and establish schedule dates for near term critical meetings and actions.

5.5 DOCUMENT MARKINGS AND LEDGERS

The Contractor shall mark and protect related internal production schedules, deliverables, inventories, shortages, and identified vulnerabilities related to production of government material as Controlled Unclassified Information

(CUI).

5.6 GOVERNMENT FURNISHED PROPERTY

None.

5.7 SITE SECURITY PLAN

None required. All work, inspections, and acceptance shall be performed at the Contractor site.

5.8 Contractor Travel

5.8.1 The Contractor shall adhere to the GSA Federal Travel Regulations on all travel.

5.9 APPLICABLE DOCUMENTS AND COMPUTER PROGRAMS

5.9.1 GSA Federal Travel Regulations (www.gsa.gov)

5.9.2 OST Travel Manual M 1.26A, and subsequent revisions

5.9.3 DOE Order 440.2C, Attachment 1; Contractor Requirements Document

5.9.4 10 CFR 851 Worker Safety & Health Program

5.9.5 DOE Order 206.1 Privacy Program

5.9.6 DOE O 471.1B, Identification and Protection of Unclassified Controlled Nuclear Information Manual

5.9.7 Use of DOE-Owned or Personal Property, Equipment and Resources Site Security Plan

5.9.8 AOD FAA approved Policy and Procedure Manual (PPM)

P a g e 13 | 18

5.9.9 AOD FAA approved Maintenance Inspection Program (MIP).

5.9.10 Boeing 737, FAA approved Maintenance Planning Document (MPD) D626A001, and Maintenance

Review Board Report (MRBR) D626001-MRBR

5.9.11 Boeing 737 aircraft technical publications and revisions to include all STC supplements

5.9.12 DOE Order 414.1D, Attachment 1, Contractor Requirements Document

5.9.13 OST Manual 1.27, Quality Assurance Program, Section 4.0, Quality Assurance Criteria – Contractor

5.9.14 DOE O 471.7 CUI

P a g e 14 | 18

APPENDIX A

PHASE I – PRE-PURCHASE INSPECTION OF AIRCRAFT RECORDS, AVIONICS, AND PHYSICAL

INSPECTION AND ACQUISITION OF BOEING 737-800

Aircraft Records

Physical inspection for general condition

CM/OC serviceable tags Engine(s) description, times, and cycles; LLP status with evidence back to new; shop visit summary to include overhaul Aux Power unit. LLP status with evidence back to new; Shop visit summary to include overhaul

Landing gears. LLP status with evidence back to new; Shop visit summary to include overhaul

Inspections and additional work

Aircraft modifications and STCs

Aircraft operations manuals Airworthiness Directive Status

SB/EO Status

Aircraft damage history and assessment (mapping)

Documents list (all documents that go with the aircraft)

List of requirements to obtain US Registry if registered outside US Weight and Balance Report

Current Aircraft/Engine and APU hours, cycles, maintenance status, and serial number and data plate verification

Primary overhaul agencies

Maintenance program

Copy of current A/C Equipment List annotating the serialized components.

Hard time (TBO) component list Maintenance schedules and status

Current Engine trend data

Certified operating weights

Fuel tanks and capacity

Equipment and furnishings Burn Cert data for aircraft interior

Loose equipment inventory

Aircraft paint records

Avionics Status

Cockpit avionics Standard IFR Avionics;

Terrain Avoidance and Warning System (TAWS);

Enhanced Ground Proximity Warning System (EGPWS);

Traffic Alert and Collision Avoidance System (TCAS) II;

Automatic Dependent Surveillance-Broadcast (ADS-B) out;

Cockpit displays Electronic Flight Instrumentation System (EFIS)

P a g e 15 | 18

Physical Inspection Report

Aircraft manufacturers data plate and owner’s data plate

Fuselage Empennage

Passenger compartment (seats, panels, carpet, emergency equipment, and general condition)

Galleys and lavatories

Equipment compartment

Wings, flaps and control surfaces Horizontal Stabilizer Harmonic Vibration

Aft pressure bulkhead oil-canning

Aft pressure bulkhead cracks

Fuselage crown skin chem-mill cracks

Fan Blade Dove Tail Inspection Fwd and Aft Cargo Smoke Detectors and Fire Extinguishers

Main Landing Gear forward trunnion bearing fitting

Fuel tank inert gas system

Landing gear

Aileron Bus Cable Tension Engines

Aux power unit

Flight deck Cargo compartment

Conclusions

P a g e 16 | 18

APPENDIX B

Phase II – Post-purchase Activities

Converting the Boeing 737-800 to a Combi, installing the aft (rear) airstairs, providing the general maintenance and oversight of all modifications including any routine/non-routine maintenance, and transitioning to the Government’s Maintenance Inspection Program

The Contractor shall convert the Boeing 737-800 aircraft into a Combi configuration which allows for three main-deck freight and passenger configurations in accordance with the following Supplemental Type Certificates (STCs):

Modification of Floor (need KF Combi US STC #) Installation of Cargo Door (need KF Combi US STC #) ST4544AT Installation of Cargo Loading System (Capable of both commercial and 463L Pallets) Installation of Combi Interior (need KF Combi US STC #)

The Contractor shall install the aft (rear) airstairs in accordance with the following STC:

ST01143LA Installation of Aft (Rear) Airstairs

The Contractor shall provide all general maintenance and oversight of all modifications including any routine/non-routine maintenance while the Boeing 737-800 is being converted as follows:

a) The Contractor shall remedy, fix, replace, and/or repair any issues identified during the Phase I inspection which were reported to OST, as well as any aircraft discrepancies identified during its custody of the aircraft;

b) The Contractor shall provide a written report of contract compliance and a written report of all maintenance performed on the aircraft during this Phase II;

c) The Contractor will be responsible for the flying the aircraft from its place of purchase to maintenance repair organizations (MRO) and any other location that it deems necessary to complete routine/non-routine and aircraft modifications;

d) The Contractor shall have a documented Tool Control program that all maintenance personnel will adhere to while working on prospective aircraft;

(e) The Contractor shall ensure that all maintenance activities shall be accomplished by a licensed aircraft mechanic or repairman under the Contractor’s Part 145 MRO Certificate and that all maintenance activities shall be documented in accordance with Federal Aviation Regulation 43 on a logbook insert and provided to OST/AOD for entry into the aircraft logbooks;

(f) The Contractor shall bridge and transition the existing maintenance program and oversight to the Government’s Maintenance Inspection Program; and

(g) The Government reserves the right to observe the aircraft and associated documentation during any maintenance or modification actions.

P a g e 17 | 18

APPENDIX C

Phase III – Post-purchase Activities

Airworthiness Demonstration Flight and Government Acceptance

The Contractor shall be responsible for ensuring and preparing the Boeing 737-800 aircraft for the Airworthiness Demonstration Flight (ADF) by addressing any serviceability, maintenance, or systems issue(s) identified under Phase I and Phase II as discussed in Appendix A and B of this SOW.

The Contractor shall have qualified/certified pilots to operate and fly the aircraft during the ADF. The flight will be conducted under the appropriate regulations depending on the country the flight is conducted. The Contractor is required and responsible for obtaining all required permits to accomplish the flight check. The evaluation shall consist of a flight evaluation and written report. Government acceptance will be a three-part process and will take place in a CONUS or Canada location as follows:

1. The Government shall conduct an evaluation of the aircraft maintenance using the NNSA Boeing 737NG

Acceptance Task Card (see Attachment 2). The Contractor shall make available the aircraft for three (3) days after all modifications and maintenance actions are accomplished. During this period the Government will also do an extensive review of aircraft records.

2. The Contractor is required and responsible for obtaining all required/necessary permits to conduct the ADF.

The evaluation shall consist of an ADF evaluation and written report that includes a minimum of the following items:

Built In Test Equipment (BITE) Tests done from cockpit FMC CDUs (OST/AOD to provide additional information on the types of BITE Tests)

Engine Start After Start Steering and brake checks Thrust reversers Take off Engine slam Acceleration Performance climbs Engine shut down assist and engine relight Engine temperatures (EGT, ITT, oil, fuel, etc.) during start, take off, climb, cruise, and descent Depressurization check (May not be required) Handling and climb Spoiler float Functioning at FL350 o Safety Valve Operation o Leak Check o Yaw Dampener o Manual Reversion

APU relight High Mach number handling Engine shutdown & windmill relight High indicated airspeed handling Low speed handling o PTU Check o Flap load relief

P a g e 18 | 18 o Alternate flap extension o Landing gear manual extension o Approach o Touch and go o Landing o Rejected take off

Taxi shutdown o Fuel Suction Feed o Generator Disconnect o Engine Fire Warning Switch Shutdown o Emergency Exit Lighting

Post flight

3. The Government shall have observers (pilots and aircraft maintainers) who shall be allowed to document aircraft discrepancies in aircraft logbooks or a suitable alternate during all ground and flight tests. The Contractor is responsible for correcting all known and identified discrepancies/issues and ensure air worthiness prior to Government acceptance. If a ground test cannot demonstrate the resolution of an aircraft discrepancy the Contractor will fly an additional ADF to demonstrate that any identified discrepancies/issues associated with the aircraft have been corrected.

4. Following the acceptance flight and the Government’s acceptance of the aircraft, the contractor shall also provide the following deliverable items as mentioned in the SOW:

a. Aircraft flight manuals

b. STC Supplement manuals

c. Copies of software currently installed on the aircraft at time of acceptance

d. Items removed from the aircraft that were identified to be kept as Government property

e. All aircraft records including life limited part 8130’s, logbooks for engines and APU, and landing gear

f. Emergency equipment, current, with applicable tags and inspection cards.