This project description outlines work for the rehabilitation of the Summit Rest Area and Snow Park parking area in Government Camp, Oregon. The work includes milling and paving approximately 0.1 miles of roadway, as well as striping, signage, and other surface treatments. Specific work items include removing curb and asphalt, installing 1500 tons of asphalt concrete, milling over 7700 square yards of asphalt, crack sealing and filling, geotextiles, asphalt patching, new curb, landscaping, permanent traffic markings, and temporary traffic control measures. The estimated price range for the project is $500,000 to $1,000,000 with a tentative completion date of Summer 2024. The related pre-solicitation opportunity is listed under solicitation number 69056723B000017 from the Federal Highway Administration within the Department of Transportation.

View the file

Other files

File Type Posted
ora-dot26-4 Pre-Ad Plans.pdf PDF
OR FLAP DOT 26(4)_Prelim Letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FLAP DOT 26(4), Summit Highway Safety Rest Stop and Snow Park

Government Camp, Clackamas County, Oregon

The work consists of milling, paving, striping for the rehabilitation of the Summit

Rest Area and Snow Park parking area surface in Government Camp, OR.

Project length: .10 miles

Tentative Fixed Completion Date: Summer 2024

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between $500,000 and $1,000,000

Location: 0.1 Miles E of Government Camp, OR

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O n e S ch ed u le

S ch

N am e

A

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control (erosion control devices)

LPSM

DIVISION 200 – Earthwork

203 Removal of Curb 84 LNFT

203 Removal of Asphalt 140 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete 1500 TON

413 Asphalt Pavement Milling 7736 SQYD

414 Asphalt Pavement Crack Sealing & Filling 800 LNFT

415 Paving Geotextiles 7736 SQYD

418 Asphalt Concrete Pavement Patching 155 SQYD

DIVISION 600 – Incidental Construction

609 Curb, Concrete 126 LNFT

O n e S ch ed u le

S ch

N am e

A

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

624 Topsoil (landscaping & related items) 140 SQYD

625 Turf Establishment (indicate seeding or mulching separately) 140 SQYD

633 Permanent Traffic Control (signs) 27 SQFT

634 Permanent Pavement Markings, Solid 7253 LNFT

634 Permanent Pavement Markings, Arrow 5 EACH

634 Permanent Pavement Markings, Accessibility Symbol

5 EACH

635 Temporary Traffic Control LPSM