or-ef-umpqu615-2022-2-1_prelim_plan.pdf
PDF 19 MB Posted
- Solicitation number
- 69056724B000023
About this file
This document is a Preliminary Plan for the OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022 federal contract opportunity. The project consists of repair of aggregate roadway, ditch regrading, mechanically stabilized earth wall, and slope stabilization, located 18 miles east of Glide, Oregon and 16.6 miles east of Azalea, Oregon. The work is approximately 0.19 miles in length with a tentative completion date of Winter 2025. This is a small business set-aside Sealed Bid, Firm-Fixed-Price contract opportunity with an estimated price range between $700,000 and $2,000,000. The solicitation is anticipated to be issued in Winter 2024/2025 by the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_OR ERFO FS UMPQU 615-2022-2(1).pdf | ||
| Prelim Letter_OR ERFO FS UMPQU 615-2022-2(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGER
C. WARREN
N O
T
FO
R
CO
N
STRU
CTI
O
N
P A
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K
E R I V
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
20 20
395197
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
OREGON KEY MAP
Grants Pass
MEDFORD
FOREST
D E P
A
RTMENTOFAGRICULT
U
RE
SERVICE
SITE 4710
SITE 4711
SITE 3220
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PLANS PREPARED BY
PRELI
M
IN
ARY
U.S. FOREST SERVICE
U. S. DEPARTMENT OF AGRICULTURE
UMPQUA ERFO REPAIRS 2022
TYPE OF CONSTRUCTION:
stabilization mechanically stabilized earth walls, and slope
Repair of aggregate roadway, ditch regrading, DESIGN DESIGNATION:
e (max)
V
ADT (2042)
ADT (2022)
match existing
15 MPH
<400
<400
SPECIFICATION:
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
LENGTH 0.19 MILES
PLANS FOR PROPOSED PROJECT
LOCATIONS
PROJECT
OR ERFO FS UMPQU 615-2022-2(1)
DOUGLAS COUNTY, OREGON
UMPQUA NATIONAL FOREST
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, DATE
T 32 S
T 31 S
T 30 S
T 29 S
T 28 S
T 27 S
T 26 S
T 25 S
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
E
R
E
R
E
R
E R
E
R
E
R
.5
E
T 25.5S S
T 33 S
See A.3 for Vicinity Maps
5 0 5 10 15
Scale in miles
N.F.
F.-W.
F.
N.
D.
W. N. F.
GLIDE
SUTHERLIN
ROSEBURG
WINSTON
MYRTLE CREEK
See A.4 for Material Source
:1
A
M
J u n e
T it le
S h e e t c p w w o r k w f l\ d
\o r e f u m p q u p ln g e n
.d g n
PROJECT
NUMBER
SHEET
A.1OR ERFO FS UMPQU 615-2022-2(1)
FOREST
NATIONAL
UMPQUA
PARK
NATIONAL
CRATER LAKE
FOREST
NATIONAL
RIVER
ROGUE
PRELIM
INARY - N
OT FO
R CONSTRUCTION
PRELIM
INARY - N
05 5 2010 15
Scale in miles
N
N
SITE 4710-2.7
SITE 3220-1.42
SITE 4711-1.7
SITE 3220-1.42
SITE 4711-1.7
SITE 4710-2.7
North
Umpqua
Rive r
Thunder
C re e k
F a lls
C re e k
C r e e k
W r ig h t
C re e k b e r r y
C re e k
B o u s g
R a s p
Jo h n
C r e e k
C reek
C ougar
C re e k
B u rn t
C re e k
Fa irv ie w
N F-
N.F.
NORTH
U M
P Q
U A
HI
GHWAY
UPPER
C O
W
CREEK
R D
Creek
C r e e k
M a p le
C re e k
Fr en ch
C re e k
G ra n it e
C re e k
D e v il
C r e e k
C o p p e r
N .F
FOREST
NATIONAL
UMPQUA
FOREST
NATIONAL
UMPQUA
LOCATION MAP
(Lat. 43.311071°, Long. -122.808591°)
FSR 4711-1.7
(Lat. 43.318368°, Long. -122.840157°)
FSR 4710-2.7
(Lat. 42.837512°, Long. -123.046665°)
FSR 3220-1.42
Co w
2000 FT
2000 FT
24 miles
Grants Pass, OR
To
57 miles
Eugene, OR
To
24 miles
Clearwater, OR
To
15 miles
Glide, OR
To
14 miles
Azalea, OR
To
25 miles
Trail, OR
To
ROSEBURG
GLIDE
SUTHERLIN
AZALEA
MYRTLE CREEK FOREST
NATIONAL
UMPQUA
Tr ail
Wright
Cree k
:4
J u ly
S it e V ic in it y M a p s p w w o r k w f l\ d
\o r e f u m p q u p ln g e n
.d g n
SITE VICINITY MAPS
PROJECT
NUMBER
SHEET
A.3OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
C & D Quarry (Potential Quarry Site)
Site 3220-1.42
Hatchet Quarry (Staging Only)
Timber Bench Quarry
Site 4711-1.7
Site 4710-2.7
Gobblers Knob Quarry
Wright Creek Quarry
N.F. 022
N
1 0 1 2 3
Scale in miles
4000 0 4000 8000 12000
Scale in feet
Longitude: -122.970473°
Latitude: 42.887199 °
Longitude: -122.993332°
Latitude: 42.834932°
N.
F.
N.F.
UPPER
COW
RD
CREEK
Cow
Creek
HWY.
TILLER
T R
A
IL
N .F
Longitude: -122.790522°
Latitude: 43.300072°
Long.: -122.783308°
Latitude: 43.270150°
Longitude: -122.819845°
Latitude: 43.273454°
NORTH
U M
PQ
U A
HWY
N.F
N .F
N.F. 015N .F. 30
N.F . 33
N.F. 440
N.F. 550
N .F . 7
N.F. 875
N.
F.
N.
F.
N.
F.
N.F . 6
N .F
:3
J u n e
M a te r ia l S o u r e p w w o r k w f l\ d
\o r e f u m p q u p ln g e n
.d g n
MATERIAL SOURCE
PROJECT
NUMBER
SHEET
A.4OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K
E R I V
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
20 20
395197
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
Grants Pass
MEDFORD
N
PLANS PREPARED BY
PREPARED FOR:
DATE:
NARRATIVE DESCRIPTIONS
Developed Conditions:
Existing Site Conditions:
Total Disturbed Area = X.XX Acres
Soil description:
RECEIVING WATER BODIES:
SURVEYING FIRM
PLANNING / ENGINEERING /
SITE SOIL CLASSIFICATION:
Phone: 503- 229-5279
Portland, OR 97232
700 NE Multnomah St. Stuite 600
Oregon Dept. of Environmental Quality
HAZARDOUS MATERIALS:
SHEET NO. DESCRIPTION
DEQ - ESCP Cover SheetDEQ01
DEQ - 1200CA Permit RequirementsDEQ02
EROSION AND SEDIMENT CONTROL SHEET INDEX
include that phase.
If VERTICAL CONSTRUCTION or LAND DEVELOPMENT is planned, matrix will
1200-CA permit supercedes requirements of this plan.
ESCP and general conditions have been developed to facilitate compliance with the
The permittee is required to meet all the conditions of the 1200-CA permit. This
BMP MATRIX FOR CONSTRUCTION PHASES
Phase 1 ESCP SheetsFB01-FB03
Phase 2 ESCP SheetsFB04-FB06
Phase 3 ESCP SheetsFB07-FB09
DEQ03 DEQ - Contractor's Notes
Drawings Standard Drawings
FA01- FA05 Final Stabilization
Phase/BMP
INSPECTION FREQUENCY:
runoff is occurring.
At least once every 14 days, regardless of whether stormwater melt, that results in discharge from the site.
Within 24 hours of any storm event, including runoff from snow
On initial data that land disturbance activities commence.1. Active period conditions.
suspended and runoff is unlikely due to frozen
4. Periods during which construction activities are consecutive calendar days
2. Inactive periods greater than fourteen (14) inclement weather
3. Periods during which the site is inaccessible due to conditions.
conducted and runoff is unlikely during frozen
5. Periods during which construction activities are than 14 calendar days apart, then once per month.
been completed to twice per month for the first month, no less have Section 2.2.20of the site where the stabilization steps in
The inspector may reduce the frequency of inspections in any area
SITE CONDITION MINIMUM FREQUENCY
waterbody.
relevant discharge point or downstream location of the receiving
If safe, accessible and practical, inspections must occur daily at a conditions make discharges likely.
Immediately resume monitoring upon thawing, or when weather
Visual monitoring inspections may be temporarily suspended.
conditions make discharges likely.
Immediately resume monitoring upon thawing, or when weather
Visual monitoring inspections may be reduced to once a month.
consecutive calendar days, retain the ESCP at the construction site or at another location.
DEQ, agent, or the local municipality. During inactive periods of greater than seven (7)
Retain a copy of the ESCP and all revisions on site and make it available on request to
Inspection logs must be kept in accordance with DEQ's 1200-CA permit requirements.
All inspections must be made in accordance with DEQ 1200-CA permit requirements.
inspector to discuss erosion and sediment control measures and construction limits.
Hold a pre-construction meeting of project construction personnel that includes the
* ATTENTION EXCAVATORS
these rules by calling 503-232-1987.
commencing an excavation. Call 503-246-6699. You may obtain copies of two business days before you to notify the utility notification center at least
Oregon law, OAR 952-001-0010 through OAR 952-001-0090, requires
For Information Only
NOT TO SCALE
VICINITY MAP
STANDARD DRAWINGS
W629-02
W629-01
W157-21
W157-20
W157-19
W157-18
W157-17
W157-16
W157-15
W157-02
W157-01
157-07
157-06
157-05
157-04
157-02
Rolled Erosion Control Product in Channels
Rolled Erosion Control Product on Slopes
Fiber Roll
Sediment Wattle
Stabilized Construction Exit
Water Filtration Bag
Temporary Diversion Berm Methods
Check Dam with Rolled Erosion Control Product
Check Dam, Moderate Grades
Temporary Inlet Protection
Silt Fence and Lined Waterways
Temporary Erosion Control Berms, Slope Drains, Check Dam
Temporary Diversion Channels
Sediment Trap
Temporary Inlet Protection
Year 2024
CLEARING
Ground Cover
GRADING
MASS
Plastic Sheeting
Dust Control
Mulch/Hydroseed)
Stabilization (Straw
Temporary
CONST.
UTILITY
Stabilization
Permanent
EROSION PREVENTION
SEDIMENT CONTROL
Straw Wattles
Inlet Protection
Dewatering
RUNOFF CONTROL
Ravine)
Buffer Zone (from
(Perimeter)
Sediment Fence
(Interior)
Sediment Fence
Entrance
Construction
Protection
Existing Outlet
Protection
New Outlet
Check Dams
Existing Curb Inlet
POLLUTION PREVENTION
Management
Hazard Waste
Spill Kit Onsite
Area
Concrete Washout
CONST.
VERTICAL
STABILIZATION
FINAL
PARK
NATIONAL
LAKE
CRATER
NF
F-W
F.
N.
D.W. N. F.
GLIDE
SUTHERLIN
ROSEBURG
WINSTON
MYRTLE CREEK
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
Site still recovering from recent wildfire.
varying shoulder along the fill slopes appear to be original cut and sidecast fill alignments.
Three storm induced failures of USFS forest roads with unpaved 12 ft typ wide roads with to recover lost road prism. Varying width of fill slopes and cut slopes.
Unpaved roads with varying width. Proposed MSE walls & Rock Embankment
DOGAMI and ODOT.
material type in the area, with localized competent basalt and gabbro rocks documented by
Decomposed andesite and other weathered volcanic rocks appear to be the predominant
French Creek serves as a tributary to Cow Creek
Wright Creek serves as a tributary to North Umpqua River
Falls Creek serves as a tributary to North Umpqua River
Basalt and gabbro are known sources of Naturally occuring asbestos (NOA)
:1
A p r il
C
O V
E R
S H
E E
T p w w o r k w f l\ d
\E S
C
D E
Q
C o v e r S h ts
.d g n
DEQ - ESCP COVER SHEET
PROJECT
NUMBER
SHEET
OR ERFO FS UMPQU 615-2022-2(1) A.5
For Information Only
NOT TO SCALE
SITE MAP
NATIONAL
UMPQUA
NATIONAL
RIVER
ROGUE
PRELIM
INARY - N
project completion. (1200-CA Permit Section 13.2.21) moved and disposed of properly, unless needed for long term use following complete and the site is stabilized, all temporary erosion controls and retained vegetation or other cover of exposed areas is established. Once construction is
Do not remove temporary sediment control practices until permanent 42.
resumes on that portion of the site. (1200-CA Permit Section 13.2.20) tackifier, loose straw, or an adequate covering of compost mulch until work activities cease for 14 days or more with a covering of blown straw and a
Provide temporary stabilization for that portion of the site where construction 41.
days. (1200-CA Permit Section 17.5.f.)
permanently ceased or will be temporarily inactive for 14 or more calendar
Document any portion(s) of the site where land disturbing activities have 40.
cleanup released sediments. (1200-CA Permit Section 13.2.19) not occur. Vacuuming or dry sweeping and material pickup must be used to
The intentional washing of sediment into storm sewers or drainage ways must 39.
13.2.19.a)
Department of State Lands required timeframe. (1200-CA Permit Section in-stream clean-up of sediment shall be performed according to the Oregon steps to prevent a recurrence of the discharge within the same 24 hours. Any be remediated. Investigate the cause of the sediment release and implement
Within 24 hours, significant sediment that has left the construction site, must 38.
project. (1200-CA Permit Section 13.1.5.d) before design capacity has been reduced by fifty percent and at completion of percent. Sediment basins and sediment traps: remove trapped sediments
Catch basins: clean before retention capacity has been reduced by fifty 37.
Permit Section 13.1.5.c) two inches depth above ground height and before BMP removal. (1200-CA
Other sediment barriers (such as biobags): remove sediment before it reaches 36.
13.1.5.b) above ground fence height and before fence removal. (1200-CA Permit Section
Sediment fence: remove trapped sediment before it reaches one third of the 35.
surface waters. (1200-CA Permit Section 13.2.8) to prevent discharges to surface waters or conveyance systems leading to stockpiles must be stabilized or covered, or other BMPs must be implemented
As needed based on weather conditions, at the end of each workday soil 34.
13.2) stable during rain events at all times of the year. (1200-CA Permit Section weekends, if needed. The registrant is responsible for ensuring that soils are
Temporarily stabilize soils at the end of the shift before holidays and 33.
according to manufacturer’s specifications. (1200-CA Permit Section 6) operating the treatment system. Operate and maintain the treatment system system. Obtain Environmental Management Plan approval from DEQ before design, and a sampling plan and frequency) before operating the treatment system, location of inlet, location of discharge, discharge dispersion device operation and maintenance plan (including system schematic, location of filtration, etc.) for sediment or other pollutant removal is employed, submit an If an active treatment system (for example, electro-coagulation, flocculation, 32.
waterway riparian zone. (1200-CA Permit Section 13.3.5) waters. Exercise caution when using time-release fertilizers within any manufacturer’s recommendations to minimize nutrient release to surface The application rate of fertilizers used to reestablish vegetation must follow 31.
avoid wind-blown soil. (1200-CA Permit Section 13.2.9) Use water, soil-binding agent or other dust control technique as needed to 30.
Section 13.3) signage, and covered storage areas for waste and supplies. (1200-CA Permit vehicles and machinery, material delivery and storage controls, training and disposal procedures, spill kits in all vehicles, regular maintenance schedule for response procedures, employee training on spill prevention and proper Implement the following BMPs when applicable: written spill prevention and 29.
(See 1200-CA Permit Section 13.4) uncontaminated groundwater seepage due to shallow excavation activities.
Provide a dewatering plan for accumulated water from precipitation and 28.
be installed. (See 1200-CA Permit Sections 13.2.17 and 13.2.18) If engineered soils are used on site, a sedimentation basin/impoundment must 27.
1200-CA Permit Section 13.2.17.a) Permit Section 13.2.17 and stamped by an Oregon Professional Engineer. (See Provide plans for sedimentation basins that have been designed per 1200-CA 26.
(1200-CA Permit Sections 13.2.15 and 13.3) solvents, curing compounds and adhesives from construction operations.
machinery, as well as debris, fertilizer, pesticides and herbicides, paints, pollutants include fuel, hydraulic fluid, and other oils from vehicles and cleaning and maintenance activities; and waste handling activities. These spills; vehicle and equipment fueling, maintenance, and storage; other Use BMPs to prevent or minimize stormwater exposure to pollutants from 25.
are to be installed. (1200-CA Permit Section 13.2.12) Prevent soil compaction in areas where post-construction infiltration facilities 24.
are not disturbed. (1200-CA Permit Section 13.2.10) Ensure that steep slope areas where construction activities are not occurring 23.
(1200-CA Permit Sections 12 and 13.3.9) wash-out, wastewater from cleanout of stucco, paint and curing compounds.
Control prohibited discharges from leaving the construction site, i.e., concrete 22.
drain loads on site. (1200-CA Permit Section 13.2.7.f) When trucking saturated soils from the site, either use water-tight trucks or 21.
place prior to land- disturbing activities. (1200-CA Permit Section 13.2.7) unpaved roads located onsite, or use an exit tire wash. These BMPs must be in construction entrance, graveled (or paved) exits and parking areas, gravel all Prevent tracking of sediment onto public or private roads using BMPs such as: 20.
Section 13.3.7) discharge of pollutants (e.g., secondary containment). (1200-CA Permit precipitation, or (2) a similarly effective means designed to prevent the a tarp, plastic sheeting, temporary roof) to prevent exposure of wastes to day. For waste containers that do not have lids, provide either (1) cover (e.g., the business day for those containers that are actively used throughout the Keep waste container lids closed when not in use and close lids at the end of 19.
controls. (1200-CA Permit Section 13.3.7) Establish material and waste storage areas, and other non-stormwater 18.
Sections 13.2.20 and 13.2.21) unvegetated, such as dirt access roads or utility pole pads.(1200-CA Permit stabilizations measures are not required for areas that are intended to be left all disturbed areas as grading progresses. Temporary or permanent Apply temporary and/or permanent soil stabilization measures immediately on 17.
beginning concrete work. (1200-CA Permit Section 13.2.14)
16. Establish concrete truck and other concrete equipment washout areas before the site boundary. (1200-CA Permit Sections 13.2.6 and 13.2.13) internal storm drain inlets at all times during construction, both internally and at
15. Control sediment as needed along the site perimeter and at all operational
Sections 13.1.1. and 13.2.16) at outlets and downstream channels and stream banks. (1200-CA Permit
14. Control both peak flow rates and total stormwater volume, to minimize erosion
CA Permit Sections 13.1.3) well as all sediment basins, traps, and barriers prior to land disturbance. (1200-
13. Install perimeter sediment control, including storm drain inlet protection as of the state. (1200-CA Permit Section 13.2.4)
12. Maintain and delineate any existing natural buffer within the 50-feet of waters
Identify the type of vegetative seed mix used. (1200-CA Permit Section 13.2.5) vegetate open areas when practicable before and after grading or construction.
11. Preserve existing vegetation when practical and re-vegetate open areas. Re-preserved, especially in perimeter areas. (1200-CA Permit Section 13.2.1) between the site and sensitive areas (e.g., wetlands), and other areas to be zones, and vegetation areas to be preserved. Identify vegetative buffer zones riparian areas and vegetation including important trees and associated rooting
10. Identify, mark, and protect (by construction fencing or other means) critical
Section 13.2.3) to prevent stormwater from bypassing controls and ponding. (1200-CA Permit
9. Create smooth surfaces between soil surface and erosion and sediment controls
Section 13.2.2) exposed inactive areas from becoming a source of erosion. (1200-CA Permit
8. Sequence clearing and grading to the maximum extent practical to prevent within 10 days. (1200-CA Permit Section 15.9) is only under specific conditions. Submit all necessary revision to DEQ or Agent
7. Submission of all ESCP revisions is not required. Submittal of the ESCP revisions
15.8)
6. The ESCP must be accurate and reflect site conditions. (1200-CA Permit Section
(1200-CA Permit Sections 15 and 15.11) control measures or practices described in the ESCP is a violation of the permit.
5. The permit registrant must implement the ESCP. Failure to implement any of the request to DEQ, Agent, or the local municipality. (1200-CA Permit Section 15.7)
4. Retain a copy of the ESCP and all revisions on site and make it available on requirements. (1200-CA Permit Section 17.5.q)
3. Inspection logs must be kept in accordance with DEQ’s 1200-C permit
1200-C permit requirements. (1200-CA Permit Section 17.5)
2. Visual monitoring inspection reports must be made in accordance with DEQ responsibilities. (1200-CA Permit Section 15.4.c.ii) installer (see 1200-CA Permit Section 15.10), as well as their individual maintenance of stormwater control measures (e.g. ESCP developer, BMP name and position) that are responsible for the design, installation and (1200-CA Permit Section 15.4.c.i). In addition, include a list of all personnel (by construction activities. Revise the list as appropriate until project cpompletion activities on site, and the areas of the site where the contractor(s) will engage in
1. Once known, include a list of all contractors that will engage in construction
1200CA PERMIT REQUIREMENTS
REQUIREMENTS
DEQ - 1200CA PERMIT 2
:0
J u n e
D
E Q
C
A P e rm it R e q u ir e m e n ts p w
-w o rk
\d \E
S C
D
E Q
C o v e rS h ts
.d g n
PROJECT
NUMBER
SHEET
A.6OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
TABLE:
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATED TIME PRIME CONTRACTOR/DEVELOPER:
Description of experience:
Certification #
E-mail:
Fax:
Phone:
Company/Agency:
Permittee's Site Inspector
INSPECTOR INFORMATION:
Phase to be used:
Material name:
SITE:
POLLUTANT GENERATING MATERIALS ON
Fax:
Phone:
Address 2
Address 1
Contact:
Company:
Final Stabilization (Dates, From - To)
Street Construction (Dates, From - To)
Utility Installation (Dates, From - To)
Mass Grading (Dates, From - To)
Clearing (Dates, From - To)
IN-SITU RAIN GAUGE:
Or NO YES
Provide URL for Nearest Rain Gauge
ENGINEERED SOILS:
NO Used on site - YES
If yes, provided retention plan and pH monitoring schedule
EXPECTED:
LIST ALL AUTHORIZED NON-STORMWATER DISCHARGES
Construction To Contain Runoff From The Work Site.
List Any Stormwater Facilities That Will Be Used During
N/A
LOCATION OF OFF-SITE STAGING AREA
LOCATION OF CONCRETE TRUCK WASHOUT
County
, Oregon
Construction
ESCP Revisions During DATENo. BY
, Oregon County
, R. S. , T. located in the Sec.
Tax Map#
Tax Lots
PROPERTY DESCRIPTION:
https://streamstats.usgs.gov/ss/?gage=14316700&tab=info https://streamstats.usgs.gov/ss/?gage=14308990&tab=info
N/A
DEQ - CONTRACTOR'S NOTES
:0
J u n e
D
E Q
C o n tr a c to r 's
N o te s p w w o r k
\d
\E S
C
D E
Q
C o v e r S h ts
.d g n
PROJECT
A.7OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER
NORTH EAST
ORTHOMETRIC
ELEVATION
LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION NOTE:
Green Butte 1.
23101 436990.814 4238338.578 2392.139 42°50'14.048514"N 123°02'48.000960"W 2315.2196 0.999800592 5/8" IR W/ FHWA ALUM CAP
23102 437228.307 4238450.302 2400.574 42°50'16.427015"N 123°02'46.598930"W 2323.6545 0.999800122 5/8" IR W/ FHWA ALUM CAP
Fairview
23111 610411.456 4298637.117 1429.007 43°19'03.748214"N 122°50'23.983583"W 1352.5448 0.999833347 5/8" IR W/ FHWA ALUM CAP
23112 610573.694 4298613.852 1422.343 43°19'05.343692"N 122°50'24.359515"W 1345.8821 0.999833685 5/8" IR W/ FHWA ALUM CAP
23113 610796.161 4298623.052 1414.193 43°19'07.542815"N 122°50'24.319190"W 1337.7358 0.999834102 5/8" IR W/ FHWA ALUM CAP
23114 610945.476 4298587.718 1409.413 43°19'09.007362"N 122°50'24.853450"W 1332.958 0.999834349 5/8" IR W/ FHWA ALUM CAP
Wight Creek
23121 607361.755 4307131.640 1557.752 43°18'35.963992"N 122°48'27.975918"W 1481.4446 0.999826846 5/8" IR W/ FHWA ALUM CAP
23122 607056.717 4307192.778 1592.366 43°18'32.968723"N 122°48'27.035593"W 1516.0641 0.999825156 5/8" IR W/ FHWA ALUM CAP
COORDINATE SYSTEM : Oregon South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : OR83/2011-SIF NSRS11(NAD83/2011) Oregon, Southern Zone, Intn'l Foot
PROJECT : Umpqua ERFO repairs 2022 DATE OF FIELD WORK :September, 2023 DATE OF FINAL ADJUSTMENT : November, 2023
PROJECT UNITS : International Foot
-M a r-
:0 A
M
C
M yF ile s\
T h a tc h er
S m it h \S u rv ey \P ro je ct s\
O R \U m p q u a \2
O R E
R
FO
F S U
M P Q
U -2
-2
(1 co n tr o ls h ee t.
xl sx ]S h ee t
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
A.8OR ERFO FS UMPQU 615-2022-2(1)
SHEET
NUMBER
SURVEY CONTROLPRELIM
INARY - N
BARRICADE, TYPE 3
BARRICADE, TYPE 3
200 4000100200
Scale in feet
ROAD
CLOSED
ROAD
CLOSED
R11-2
NF-4710to N UMPQUA HWY
(Lat. 43.318368°, Long. -122.840157°)
SITE 4710-2.7
F a lls
C re e k
N F -4
R11-2 to N
F-
NF-
:2
J u ly
T
E M
P O
R A
R Y
T R
A F
F
IC
C O
N T
R O
L S
IG
N
IN
G
F S
R
M
P
.7 p w w o r k w f l\ d \o r e f u m p q u .7 p ln tt c .d g n
SITE 4700-2.7
TEMPORARY TRAFFIC CONTROL
PROJECT
NUMBER
C.14
OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
G
S
N
BEGIN CONSTRUCTION
END CONSTRUCTION
Turf establishment (Special seed mix)
Turf establishment (Special seed mix)
Limits of landscaping bench
100+00.00
"ALI_MAIN_4710"
102+82.69
"ALI_MAIN_4710"
LEGEND:
Mitigation, landscaping log
Pseudotsuga menziesii, Douglas Fir, 48-inch to 60-inch height, balled and burlapped
Boulder Pile
:5 u ly
L
A N
D S
C A
P
IN
G P
L A
N S
IT
E
-2 p w w o r k w f l\ d
\o r e f u m p q u
.7 p ln la n d s c a p in g
.d g n
SITE 4710-2.7
LANDSCAPING PLAN
PROJECT
C.15OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
1000 200005001000
Scale in feet
BARRICADE, TYPE 3
BARRICADE, TYPE 3
N
ROAD
CLOSED
ROAD
CLOSED
SITE 4711-1.7
(Lat. 43.311071, Long. -122.808591)
SITE 4711 MP 1.7
NORTH
UMPQUA
HIGHWAY
W r ig h t
C r e e k
NF 471
N F-015
N F
W
RI
GHT
CREEK
TRAI
LHEAD
R11-2
R11-2
:1
J u ly
T E
M P
O R
A R
Y T
R A
F F
IC
C
O N
T R
O L
S
IG
N
IN
G S
IT
E
-1 p w w o r k w f l\ d \o r e f u m p q u .7 p ln tt c .d g n
SIGNING SITE 4711-1.7
TEMPORARY TRAFFIC CONTROL
PROJECT
NUMBER
D.15
INARY - N
BARRICADE, TYPE 3
BARRICADE, TYPE 3
500 10000250500
Scale in feet
ROAD
CLOSED
ROAD
CLOSED
SITE 3220-1.42
(Lat. 42.837512, Long. -123.046665)
SITE 3220 MP 1.42
C R E E K
C O
W
UPPER
R D
Cre ek
C o w
N .F
F re n c h
C re e k
R11-2
R11-2
N .F
:5 u ly
T
E M
P O
R A
R Y
T R
A F
F
IC
C O
N T
R O
L S
IG
N
IN
G
S
IT
E
M
P
.4 p w w o r k w f l\ d \o r e f u m p q u .4 p ln tt c .d g n
SIGNING SITE 3220 MP 1.42
TEMPORARY TRAFFIC CONTROL
PROJECT
NUMBER
SHEET
E.5OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
NO SCALE
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITHOUT DITCH
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITH DITCH
Variable slopeVariable slope
D
/2
/2
4D m in
H m in
H
/2
/2
H ditch slope
Match existing ditch slope
Match existing
D or Span
Dia.
or Span
Dia.
or Span
Dia.
or Span
Dia.
L
LENGTH
APRON
H
DEPTH
APRON
L
LENGTH
APRON
H
DEPTH
APRON
(INCHES) (FEET) (CUYD) (SQYD)
(INCHES) (FEET) (CUYD) (SQYD)
2' (min.)
2' (min.)
(INCHES)
(INCHES)
14.5
12.5
49.8
38.7
18.5
13.2
5.2
3.2
1.7
44.4
34.0
15.6
10.8
3.9
2.2
1.0
14.5
12.5
38.5
29.8
15.1
10.7
4.4
2.7
1.3
35.6
27.2
13.3
9.3
3.6
2.0
0.9
3.
2.
1.
SECTION A-A SECTION B-B
SECTION C-C SECTION D-D SECTION E-E
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
NOTE:
A
1 1
A B B
C C DD
E
E
E
E b o tt o m w id th b o tt o m w id th for payment.
Do not measure riprap placement excavation
Furnish separation and stabilization geotextile.
less than 10%.
Use for aprons serving culverts with slopes or flatter
Sloped 1V:2H
Original ground
Geotextile m in
H
L
D it c h
D ground
Original
Geotextile Flowline m in
D /2
Geotextile m in
D /2 m in
D /2 ground
Original
Geotextile
D it c h
D
L ground
Original
Geotextile m in
H Original ground
L L
DETAIL APPROVED FOR USE 8/2016
REVISED:
251-1W
WFLHD DETAIL
CULVERT OUTLETS
PLACED RIPRAP AT
:5 u ly
D e t
W p w
-w o rk \d
\W
-1
R
IP
R A
P O
U T
L E
T .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.2OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
NO SCALE
1.
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
NOTE:
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-1
:5 u ly
S td p w w o r k
\d
\M e ta l P ip e C u lv e r t.
d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.3OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
602-2
:4 u n e
S td p w w o r k \d
\M e ta l P ip e C u lv e r t
C o u p li n g B a n d .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.4
INARY - N
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
STANDARD APPROVED FOR USE 12/1993
10/2017 DRAFT:
6/2005 4/1994 REVISED:
602-3
:4 u n e
S td p w w o r k
\d
\C u lv e r t
B e d d in g .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
F.5OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
PIPE SIZE (D) WIDENING
DITCH WIDENING
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
1'
1'
NOTE:
B e rm
D
B e rm
D
(min.)
4' d ip a t c e n te r
(Min.)
4'
602-6
:4 u n e
S td p w w o r k \d
\C u lv e r t
I n le t T r e a tm e n t in C u t
S lo p e s .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
F.6OR ERFO FS UMPQU 615-2022-2(1)
PRELIM
INARY - N
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil f o r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
DETAIL APPROVED FOR USE 10/2016
157-1W
WFLHD DETAIL
SILT FENCE
:0 u ly
D e t
W p w w o r k
\d
\W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.1OR ERFO FS UMPQU 615-2022-2(1)
INARY - N
Se e N ote
6%
5%
4%
3%
2%
NO SCALE
6%
5%
4%
3%
2%
5%
4%
3%
2%
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.
gravel bags as approved by the CO, to meet the
Construct check dams from fiber rolls, filter rock, or
MODERATE GRADES
CHECK DAM
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
Gravel bag the ends. See Note 6 to prevent flow around
Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
SPACING (max.)
CHECK DAM
See Note 5
NOTE:
GRADE
DITCH
SPACING (max.)
CHECK DAM
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on
Place excavated
Flow
F lo w on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on on ditch grades steeper than 6%.
* Do not use gravel bag check dams
(FT)
(FT)
(FT)
Trench 2" (min.)
m in
Fiber roll 9" Ø (min.)
Trench 2" (min.)
-inch wood 8 1-inch x 18
1Stake fiber rolls in place with 1
Expose stakes 2-inches (min.) above top of fiber roll.
2-foot (max.) spacing.
m in
"6 m in m in .6
9" Ø minimum fiber roll.
DETAIL APPROVED FOR USE 7/2016
157-15W
WFLHD DETAIL
:0 u ly
D e t
W p w w o r k
\d
\W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.2
INARY - N
| or-ef-umpqu615-2022-2-1_pln_gen-Title Sheet.pdf |
| or-ef-umpqu615-2022-2-1_pln_gen-Site Vicinity Maps.pdf |
| or-ef-umpqu615-2022-2-1_pln_gen-Material Source.pdf |
| A5 to A7.pdf |
| ESC_DEQ_CoverShts-DEQ - ESCP Cover Sheet.pdf |
| ESC_DEQ_CoverShts-DEQ - 1200CA Permit Requirements.pdf |
| ESC_DEQ_CoverShts-DEQ - Contractor's Notes.pdf |
| F2-3.pdf |
| W251-1 RIPRAP OUTLET-Det W251-1.pdf |
| Metal Pipe Culvert-Std 602-1.pdf |
| G1-2.pdf |
| W157-1-Det W157-1.pdf |
| W157-15-Det W157-15.pdf |
File details come from the government source that posted it. Updated .