Application Instructions

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control Number: [insert number] Expiration Date: [insert date]

Paperwork Reduction Act Statement. We are collecting this information in accordance with The Fish and Wildlife Act, 16 U.S.C. §§742a-742j, not including §742 d-1; National Wildlife Refuge System Administration Act, 16 U.S.C. §§668dd-ee; Endangered Species Act, 16 U.S.C. §1531 et seq.; Fish and Wildlife Conservation Act,16 U.S.C. §2901 et seq.; Fish and Wildlife Coordination Act, 16 U.S.C. §§661-666; and Migratory Bird Treaty Act, 16 U.S.C. §703 et seq.. Your response is required to obtain or retain a benefit. We will use the information you provide to to conduct a competitive review and select projects for funding. We may not conduct or sponsor and you are not required to respond to a collection of information unless it displays a currently valid OMB control number. We estimate that it will take applicants under this program about two to complete an application. We estimate it will take recipients under this program about two to complete required reporting and two for required recordkeeping. All burden estimates include the time to review instructions, search existing data resources, gather data needed and complete and review the submission. You may send comments on the burden estimate or any other aspect of this information collection to the Information Collection Clearance Officer, U.S. Fish and Wildlife Service, MS BPHC, 5275 Leesburg Pike, Falls Church, VA 22041-3803.

U.S. Fish and Wildlife Service Midwest Region Science Applications Great Lakes Barrier Assessment

Adaptive Science Catalog of Federal Domestic Assistance (CFDA) Number: 15.670

Notice of Funding Opportunity

I. Description of Funding Opportunity The U.S. Fish and Wildlife Service (Service), Midwest Region, is soliciting proposals to conduct field assessments of aquatic barriers and fish passability in tributaries in Lake Huron, Erie, and Ontario watersheds. Data collected on dams will be incorporated into an already developed barrier database and will enable improved estimates of aquatic barrier removal costs, cumulative passability within watersheds, and infrastructure maintenance challenges. Understanding these challenges helps efforts to modernizes infrastructure (DOI priority 8), and restores trust among the various partners and landowners affected by dams in need of repair or removal (DOI priority 3).

By fall 2018, dam assessments will be complete for the entire Lake Michigan and Superior watersheds. The desire is to have a comprehensive assessment and common dam data for the entire Great Lakes basin. As such, any proposal must compliment and collect data comparable to the prior assessments and be incorporated into the existing barrier database. The University of Wisconsin – Madison developed a field barrier assessment protocol with the USFWS, the GLFC, and others. This included data collection on infrastructure condition, height and width, and fish passage technologies along with barrier pictures and recording GPS coordinates. The grantee is expected to use this, or a similar protocol (i.e., minimum data collection must match the fields on the existing protocol), for assessments to ensure compatible data is collected.

Contributing to the existing database creates a conservation stewardship legacy (DOI priority 1) by informing restoration of connectivity in the Great Lakes aquatic systems. The data is a tool that can support Endangered Species Act implementation (USFWS priority 2 and 3) by allowing prioritization of restoration expenditures with potential for accelerating recovery of aquatic species, such as threatened and endangered mussels. Restoring waterway connectivity across Great Lakes tributaries also improves public access to hunting, fishing and outdoor recreation (USFWS priority 5).

Grant applications need to address the following objectives:

1. Produce a field inventory of dams with a format compatible with the field barrier assessment protocol referenced above. Inventories should attempt to visit all dams currently identified on the FishWerks decision tool by watershed. Applicants can propose inventory of dams associated with tributaries of Lake Huron, Erie, and/or Ontario striving to complete one entire lake watershed before moving to the next.

2. Manage and develop database of potential Great Lakes tributary aquatic barriers in the Great Lake watersheds (Huron, Erie, and/or Ontario).

3. Share information and data throughout (bi-annually) and after project work. Provide all collected data to USFWS and the University of Wisconsin-Madison to be incorporated into existing database. Summarize, present, and publishing findings in media useful to aquatic habitat connectivity decision makers.

Background Since 2011, researchers at the University of Wisconsin-Madison and their collaborators have identified barriers to aquatic habitat connectivity in Great Lakes tributaries and assessed optimal barrier removal approaches for restoration. An initial barrier identification based on remotely sensed spatial data offered the most complete database of fish passage barriers available for the Great Lakes (Januchowski-Hartley et al. 2013). This data has been shared widely and serves as the basis for development of restoration optimization models and the online decisions support tool Fishwerks (greatlakesconnectivity.org).

A reanalysis of Great Lakes barriers was spurred by the development of an improved hydrography dataset by the Great Lakes Aquatic Habitat Framework team based at the University of Michigan. The revised database includes the latest dam data from the Ontario Ministry of Natural Resources and integrates low-order direct tributaries that were excluded previously. This revised barrier inventory reduced the number of road crossings and dams believed to merit consideration for enhancing connectivity by approximately 60%. The large decrease in the number of focal barriers reflects the elimination of many dams and road crossings that fall on very small tributary channels. The revised inventory instead directs attention toward potential barriers that drain an area >1 km2—representing stream channels large enough to support perennial flow and be potentially usable by Great Lakes migrants.

The current barrier database is limited in regards to dam attributes and condition data. This complicates their use for optimization modeling and decision support. We seek proposals to visit dam locations and collect physical dam attributes and condition in the Lake Huron, Erie and/or Ontario basins (both the U.S. and Canada).

Dam attributes and condition Aging infrastructure is an enormous problem facing our nation. Most dams in North America were constructed before 1960 and many are now entering the late stages of their expected lifespan. As continued aging increases both the routine maintenance burden and risk of catastrophic failure for a large numbers of dams increases. As such, it is essential to maintain up-to-date information on their condition. This need is even more pressing when considering projections of large storms likely occurring more frequently in the future, creating further stress on dams and other water-related infrastructure. However, only a small percentage of dams across the Great Lakes basin have been assessed for condition and no comprehensive database containing this information exists.

From an ecological connectivity standpoint, dams are a common focal point for restoration because they are usually impassable to most or all migratory fishes. Along with confirming their exact location and current infrastructure condition, there are two attributes of dams that are central to strategic restoration assessment: dam dimensions and fish passability. Initial dam removal cost estimates are typically based on dam height. Of 3,952 dams in the revised barrier inventory, height information is not available for 1,051 structures, primarily in Canada. Field assessments will allow measurement of dam height, as well as width and confirmation of the previously collected height data.

Additionally, current optimization models treat all dams as completely impassible to migratory fishes because systematic data on which locations have fish passage technology or are passable during certain periods of the year is lacking. The USFWS first barrier inventory for sea lamprey control suggests that there are passage technologies implemented on a small minority of US dams. To our knowledge, there is no equivalent assessment in Canada. A field visit to each dam will allow this essential attribute to be added to the database. Surveying fishery professionals offers an alternative means of obtaining such information but it can be very challenging to gather comprehensive and comparable data from a large number of local experts.

Expected outcomes

Information on dam attributes and condition will serve multiple purposes, including substantial improvements in the existing optimization models and the associated decision support tool (e.g., Fishwerks). The dam condition data will make it possible to explore scenarios of merging infrastructure maintenance with restoration to maximize return on investment for both interests. Additionally, fisheries managers have recognized the need for consistent dam inventories as one baseline necessary when developing regional priorities and strategies. Ultimately, the outcome would be more fully functioning aquatic ecosystems with more complete assemblages of native species, more potential for recovery of listed species, prevention of need for listing some species and more sport fish.

Lastly, continuing to improve FishWerks and providing data on dam attributes strengthens partnerships with States (DOI priority 7). Particularly, with dam safety and fish and wildlife programs in the states of Michigan, Ohio, Pennsylvania and New York.

II. Award Information This work is expected to be completed in phases by lake basins. Total available funding for fiscal year 2018 is $150,000.

This will be a grant agreement with a maximum period of performance of two years. Funds will be awarded in FY 2018, but project periods of performance should not anticipate beginning earlier than October 1, 2018.

III. Basic Eligibility Requirements Eligible Applicants:

Federal, State and local government agencies; Federally recognized Indian Tribal governments; private nonprofit institutions/organizations; and public nonprofit institutions/organizations.

Applicants must ensure that activities occurring outside the United States are coordinated as necessary with appropriate U.S. and foreign government authorities and that any necessary licenses, permits, or approvals are obtained prior to undertaking proposed activities. The Service does not assume responsibility for recipient compliance with the laws and regulations of the country in which the work is to be conducted.

Federal law mandates that all entities applying for Federal financial assistance must have a valid Dun & Bradstreet Data Universal Number System (DUNS) number and have a current registration in the System for Award Management (SAM). See Title 2 of the Code of Federal Regulations (CFR), Part 25 for more information. Exemptions: The SAM registration requirement does not apply to individuals submitting an application on their own behalf and not on behalf of a company or other for-profit entity, state, local or Tribal government, academia or other type of organization.

A. DUNS Registration Request a DUNS number at http://fedgov.dnb.com/webform. For technical difficulties, contact Dun & Bradstreet by email at: govt@dnb.com, or by calling the Government Customer Resource Center at voice phone: 866-705-5711 or TTY line: 877-807-1679 (hearing impaired customers only). Once assigned a DUNS number, entities are responsible for maintaining up-to-date information with Dun & Bradstreet.

B. Entity Registration in SAM Register in SAM at www.sam.gov. Once registered in SAM, entities must renew and revalidate their SAM registration at least every 12 months from the date previously registered. Entities are strongly urged to revalidate their registration as often as needed to ensure that their information is up to date and in synch with changes that may have been made to DUNS and IRS information. Foreign entities who wish to be paid directly to a United States bank account must enter and maintain valid and current banking information in SAM.

Note: The official U.S. government website address for SAM is www.sam.gov. There is NO COST to register in or access SAM.gov. There are third-party vendors who charge a fee in exchange for registering entities in SAM; please be aware that you can register to do business with the U.S. government FOR FREE directly in SAM at www.sam.gov.

C. Excluded Entities Applicant entities or their key project personnel identified in the SAM.gov Exclusions database as ineligible, prohibited/restricted or excluded from receiving Federal contracts, certain subcontracts, and certain Federal assistance and benefits will not be considered for Federal funding, as applicable to the funding being requested under this Federal program. The Service conducts a review of the SAM.gov Exclusions database for all applicant entities and their key project personnel prior to award.

D. Cost Sharing or Matching:

Cost sharing is not required for this program.

IV. Application Requirements To be considered for funding under this funding opportunity, an application must contain:

A. A completed, signed, and dated Standard Form (SF) 424, Application for Federal Assistance (http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1). Do not include other Federal sources of funding, requested or approved, in the total entered in the “Federal” funding box on the Application for Federal Assistance form. Enter only the amount being requested under this program in the “Federal” funding box. Include any other Federal sources of funding in the total funding entered in the “Other” box.

B.Project Summary
Briefly summarize the project, in one page or less. Include the title of the project, geographic location, and a brief overview of the need for the project. Goal(s), objectives, specific project activities, anticipated outputs and outcomes can also be included in this section.

C. Project Narrative

1. Statement of Need: Describe why this project is necessary (significance/value) and include supporting information. Summarize previous or on-going efforts (of you/your organization, and other organizations or individuals) that are relevant to the proposed work. Explain the successes or failures of past efforts and how your proposed project builds on them. If you have received funding previously (from the Service or any other entity) for this specific project work or site, provide a summary of the funding, associated activities and products/outcomes.

2. Project Goals and Objectives: State the long-term, overarching goal(s) of the program/project. State the objectives of the project. Objectives are the specific outcomes to be accomplished in order to reach the stated goal(s). The project objectives must be specific, measurable, and realistic (attainable within the project’s proposed project period).

3. Project Activities, Methods and Timetable: List the proposed project activities and describe how they relate to the stated objectives. Activities are the specific actions to be undertaken to fulfill the project objectives and reach the project goal(s). The proposed project activities narrative must be detailed enough for reviewers to make a clear connection between the activities and the proposed project costs. For projects being conducted within the United States, the narrative must provide enough detail so that reviewers are able to determine project compliance with the National Environmental Policy Act, Section 7 of the Endangered Species Act, and Section 106 of the National Historic Preservation Act. For projects being conducted on the high seas, the narrative should provide enough detail so that reviewers are able to determine project compliance with Section 7 of Endangered Species Act. Provide a detailed description of the method(s) to be used to carry out each activity. Provide a timetable indicating roughly when activities or project milestones are to be accomplished. Include any resulting tables, spreadsheets or flow charts within the body of the project narrative (do not include as separate attachments). The timetable should not propose specific dates but instead group activities by month for each month over the entire proposed project period.

4. Stakeholder Coordination/Involvement: As applicable, describe how you/your organization has coordinated with and involved other relevant organizations or individuals in planning the project, and detail if/how they will be involved in conducting project activities, disseminating project results and/or incorporating your results/products into their activities.

5. Project Monitoring and Evaluation: Detail the monitoring and evaluation plan for the project. Building on the stated project objectives, which must be specific and measurable, identify what you will measure (i.e., quantitative/quantifiable indicators) and how you will measure (e.g., methods, sample size, survey tools). Reference the stated project timetable (i.e., process indicators) and budget information (i.e., input indicators). Identify the products/services to be delivered and how/to whom they will be delivered (i.e., output indicators). Detail the expected direct effect(s) of the project on beneficiaries (i.e., outcome indicators). Include any available questionnaires, surveys, curricula, exams/tests or other assessment tools to be used for project evaluation. Describe the resources and organizational structure available for gathering, analyzing and reporting monitoring and evaluation data. If applicable, describe how project participants and beneficiaries will participate in monitoring and evaluation activities. Describe how findings will be fed back into decision making and project activities throughout the project period.

6. Description of Entities Undertaking the Project: Provide a brief description of the applicant organization and all participating entities and/or individuals. Identify which of the proposed activities each agency, organization, group, or individual is responsible for conducting or managing. Provide complete contact information for the individual within the organization that will oversee/manage the project activities on a day-to-day basis. If eligibility for funding is based in whole or in part on the qualifications of key personnel, provide for each key person a brief (1-2 pages) but descriptive overview of their education, experience and other skills that make them qualified to carry out the proposed project. To prevent unnecessary transmission of Personally Identifiable Information, do not include Social Security numbers, the names of family members, or any other personal or sensitive information including marital status, religion or physical characteristics on the description of key personnel qualifications.

7. Sustainability: As applicable, describe which project activities will continue beyond the proposed project period, who will continue the work or act on the results achieved, and how and at what level you expect these future activities will be funded.

8. Literature Cited

D. Budget Form Complete the Budget Information for Non-Construction Programs (SF 424A) or Budget Information for Construction Programs (SF 424C) form. Use the SF 424A if your project does not include construction and the SF 424C if the project includes construction or land acquisition. The budget forms are available on the Internet at http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1. When developing your budget, keep in mind that financial assistance awards and subawards are subject to the Federal cost principles in Title 2 of the Code of Federal Regulations Part 200, as applicable to the recipient organization type. Links to the full text of the Federal cost principles are available on the Internet at http://www.ecfr.gov/.

Note on Multiple Federal Funding Sources: If the project budget includes multiple Federal funding sources, you must show the funds being requested from this Federal program on the budget form separately from any other requested/secured Federal sources of funding. Enter the funds being requested from this Federal program in the first row of the Budget Summary section of the form, and then enter funding related to other Federal programs in the subsequent row(s). Be sure to enter each Federal program’s CFDA number in the corresponding fields on the form. The CFDA number for this Federal program appears on the first page of this funding opportunity.

E. Budget Justification In a separate narrative titled “Budget Justification”, explain and justify all requested budget items/costs. Detail how the SF 424 Budget Object Class Category totals were determined and demonstrate a clear connection between costs and the proposed project activities. For personnel salary costs, include the base-line salary figures and the estimates of time (as percentages) to be directly charged to the project. Describe any item that under the applicable Federal cost principles requires the Service’s approval and estimate its cost.

If Federally-funded equipment will be used for the project, provide a list of that equipment, including the Federal funding source.

Required Indirect Cost Statement: Recipients that do not have an approved indirect cost rate cannot charge indirect costs to their Federal award. All applicants except individuals applying for funds separate from a business or non-profit organization he/she may operate must include in the budget justification narrative one of the following statements and attach to their application any required documentation identified in the applicable statement:

“We are:

1. A U.S. state or local government entity receiving more than $35 million in direct Federal funding each year with an indirect cost rate of [insert rate]. We submit our indirect cost rate proposals to our cognizant agency. A copy of our most recently approved rate agreement/certification is attached.

2. A U.S. state or local government entity receiving less than $35 million in direct Federal funding with an indirect cost rate of [insert rate]. We are required to prepare and retain for audit an indirect cost rate proposal and related documentation to support those costs.

3. A [insert your organization type; U.S. states and local governments, please use one of the statements above or below] that has previously negotiated or currently has an approved indirect cost rate with our cognizant agency. Our indirect cost rate is [insert rate]. [Insert either: “A copy of our most recently approved but expired rate agreement is attached. In the event an award is made, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award is made.” or “A copy of our current, approved rate agreement(s) is attached.”]

4. A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency. Our indirect cost rate is [insert rate]. In the event an award is made, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award is made.

5. A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency and has an indirect cost rate that is lower than 10%. Our indirect cost rate is [insert rate; must be lower than 10%]. However, in the event an award is made, we will not be able to meet the requirement to submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after award. We request as a condition of award to charge a flat indirect cost rate of [insert rate; must be lower than 10%] of [insert a clear description of the direct cost base against which your rate is charged (e.g., salaries; salaries and fringe benefits; or modified total direct costs). However, please note that your organization cannot charge indirect costs in excess of the indirect costs that would be recovered if applied against modified total direct costs as defined in 2 CFR 220.68]. We understand that we must notify the Service in writing immediately if we establish an approved rate with our cognizant agency at any point during the award period.

6. A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency and has an indirect cost rate that is 10% or higher. Our indirect cost rate is [insert your organization’s indirect rate; must be 10% or higher]. However, in the event an award is made, we will not be able to meet the requirement to submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after award. We request as a condition of award to charge a flat de minimis indirect cost rate of 10% of modified total direct costs as defined in 2 CFR 200.68. We understand that we must notify the Service in writing immediately if we do establish an approved rate with our cognizant agency at any point during the award period. We understand that additional Federal funds may not be available to support an unexpected increase in indirect costs during the project period and such changes are subject to review, negotiation, and prior approval by the Service.

7. A [insert your organization type] that is submitting this proposal for consideration under the [insert either “Cooperative Fish and Wildlife Research Unit Program” or “Cooperative Ecosystem Studies Unit Network”], which has a Department of the Interior-approved indirect cost rate cap of [insert program rate]. If we have an approved indirect cost rate with our cognizant agency, we understand that we must apply this reduced rate against the same direct cost base as identified in our approved indirect cost rate agreement. If we do not have an approved indirect cost rate with our cognizant agency, we understand that the basis for direct costs will be the modified total direct cost base defined in 2 CFR 200.68 “Modified Total Direct Cost (MTDC)”. We understand that we must request prior approval from the Service to use the MTDC base instead of the base identified in our approved indirect cost rate agreement, and that Service approval of such a request will be based on: 1) a determination that our approved base is only a subset of the MTDC (such as salaries and wages); and 2) that use of the MTDC base will still result in a reduction of the total indirect costs to be charged to the award. In accordance with 2 CFR 200.405, we understand that indirect costs not recovered due to a voluntary reduction to our federally negotiated rate are not allowable for recovery via any other means.

8. A [insert your organization type] that will charge all costs directly.

All applicants are hereby notified of the following:

· Recipients without an approved indirect cost rate are prohibited from charging indirect costs to a Federal award. Accepting a flat de minimis rate as a condition of award is an approved rate.

· Failure to establish an approved rate during the award period renders all costs otherwise allocable as indirect costs unallowable under the award.

· Recipients may not charge to their Service award any indirect costs calculated against the portion of total direct project costs paid by any other Federal funding source or non-Federal partner.

· Recipients must have prior written approval from the Service to transfer unallowable indirect costs to amounts budgeted for direct costs or to satisfy cost-sharing or matching requirements under the award.

· Recipients are prohibited from shifting unallowable indirect costs to another Federal award unless specifically authorized to do so by legislation.

Applicants who are individuals applying for funds separate from a business or non-profit organization he/she may operate are not eligible to charge indirect costs to their award. If you are an individual applying for funding, do not include any indirect costs in your proposed budget.

For more information on indirect cost rates, see the Service’s Indirect Costs and Negotiated Indirect Cost Rate Agreements guidance document on the Internet at https://www.fws.gov/grants/atc.html.

Negotiating an Indirect Cost Rate with the Department of the Interior: Entities that do not have a NICRA must first have an open, active Federal award before they can submit an indirect cost rate proposal to their cognizant agency. The Federal awarding agency that provides the largest amount of direct funding to your organization is your cognizant agency, unless otherwise assigned by the White House Office of Management and Budget (OMB). If the Department of the Interior is your cognizant agency, your indirect cost rate will be negotiated by the Interior Business Center (IBC). For more information, contact the IBC at:

Indirect Cost Services Acquisition Services Directorate, Interior Business Center U.S. Department of the Interior 650 Capitol Mall, Suite 7-400 Sacramento, CA 95814 Phone: 916-930-3803 Email: Through https://www.doi.gov/ibc/contactus/ibcfeedback web form Internet address: https://www.doi.gov/ibc/services/finance/indirect-cost-services

F. Single Audit Reporting Statements: As required in Title 2 of the Code of Federal Regulations Part 200, Subpart F, all U.S. states, local governments, federally-recognized Indian tribal governments, and non-profit organizations expending $750,000 USD or more in Federal award funds in a fiscal year must submit a Single Audit report for that year through the Federal Audit Clearinghouse’s Internet Data Entry System. All U.S. state, local government, federally-recognized Indian tribal government and non-profit applicants must provide a statement regarding if your organization was/was not required to submit a Single Audit report for the organization’s most recently closed fiscal year and, if so, state if that report is available on the Federal Audit Clearinghouse Single Audit Database website (https://harvester.census.gov/facweb/) and provide the EIN under which that report was submitted. Include these statements at the end of the Project Narrative in a section titled “Single Audit Reporting Statements”.

G. Assurances: Include the appropriate signed and dated Assurances form available at http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1. Use the Assurances for Construction Programs (SF 424D) for construction and land acquisition projects. Use the Assurances for Non-Construction Programs (SF 424B) for all other projects. The form includes a statement that some of the assurances may not be applicable to your organization and/or your project or program. Signing this form does not make you or your organization subject to laws that are otherwise not applicable to you or your organization. Changing, crossing out, or making notations on the form before signing has no impact on the applicability of law.

H. Certification and Disclosure of Lobbying Activities: Under Title 31 of the United States Code, Section 1352, an applicant or recipient must not use any federally appropriated funds (both annually appropriated and continuing appropriations) or matching funds under a grant or cooperative agreement award to pay any person for lobbying in connection with the award. Lobbying is defined as influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress connection with the award. Submission of an application also represents the applicant’s certification of the statements in 43 CFR Part 18, Appendix A-Certification Regarding Lobbying. If you/your organization have/has made or agrees to make any payment using non-appropriated funds for lobbying in connection with this proposal AND the Federal share exceeds $100,000, complete and submit the SF LLL, Disclosure of Lobbying Activities form available at http://www.grants.gov/web/grants/forms/post-award-reporting-forms.html#sortby=1. See 43 CFR, Subpart 18.100 for more information on when additional submission of this form is required.

I. Conflict of Interest Disclosures: Applicants must notify the Service in writing of any actual or potential conflicts of interest that are known at the time of application or that may arise during the life of this award, in the event an award is made. Conflicts of interest include any relationship or matter which might place the recipient, the recipient’s employees, or the recipient’s subrecipients in a position of conflict, real or apparent, between their responsibilities under the award and any other outside interests. Conflicts of interest may also include, but are not limited to, direct or indirect financial interests, close personal relationships, positions of trust in outside organizations, consideration of future employment arrangements with a different organization, or decision-making affecting the award that would cause a reasonable person with knowledge of the relevant facts to question the impartiality of the applicant, the applicant’s employees, or the applicant’s future subrecipients in the matter. Applicants must notify the Service in writing in their application if any key project personnel, including subrecipient and contractor personnel, are known to be related to, married to, or have a close personal relationship with any Federal employee in or associated with the program to which you are applying for funding or who otherwise may be involved in the review and selection of the application. Upon receipt of such a notice, the Service program, in consultation with their Ethics Counselor, will determine if a conflict of interest exists and, if so, if there are any possible actions to be taken by the applicant to reduce or resolve the conflict. Failure to disclose and resolve conflicts of interest in a manner that satisfies the Service may result in the project not being select for funding.

J. Required Overlap/Duplication Statement: Applicants must provide a statement that addresses if there is any overlap between the proposed project and any other active or anticipated projects in terms of activities, costs, or time commitment of key personnel. If any overlap exists, applicants must provide a description of the overlap in their application. Applicants must also state if the proposal submitted for consideration under this program is/is not in any way duplicative of any proposal that was/will be submitted for funding consideration to any other potential funding source (Federal or non-Federal). If such a circumstance exists, applicants must detail when the other duplicative proposal(s) were submitted, to whom (entity name and program), and when funding decisions are expected to be announced. If at any time a proposal is awarded funds that would be duplicative of the funding requested from the Service, applicants must notify the Service point of contact for this funding opportunity immediately.

Application Checklist

· Evidence of non-profit status: If a non-profit organization, a copy of their Section 501(c)(3) or (4) status determination letter received from the Internal Revenue Service.

· SF 424, Application for Federal Assistance: A complete, signed and dated SF 424, SF 424-Mandatory, or SF 424-Individual form.

· Project summary

· Project narrative

· Timetable

· Description of key personnel qualifications

· Single Audit Reporting statement: If a U.S. state, local government, federally-recognized Indian tribal government, or non-profit organization, statements regarding applicability of and compliance with Single Audit reporting requirements.

· SF 424 budget form: A complete SF 424A or SF 424C Budget Information form.

· Budget justification

· Federally-funded equipment list: If Federally-funded equipment will be used for the project, a list of that equipment.

· Indirect cost statement

· NICRA: When applicable, a copy of the organization’s current Negotiated Indirect Cost Rate Agreement.

· SF 424 Assurances form: Signed and dated SF 424B or SF 424D Assurances form.

· SF LLL form: If applicable, completed SF-LLL Disclosure of Lobbying Activities form.

· Conflict of Interest disclosure, when applicable.

· Overlap/Duplication statement

Failure to provide complete information may cause delays, postponement, or rejection of the application.

V. Submission Instructions SUBMISSION DEADLINE: Friday, August 3, 2018, 5:00 pm central time

Intergovernmental Review: Before submitting an application, U.S. state and local government applicants should visit the following website (https://obamawhitehouse.archives.gov/omb/grants_spoc) to determine whether their application is subject to the state intergovernmental review process under Executive Order (E.O.) 12372 “Intergovernmental review of Federal Programs.” E.O. 12372 was issued to foster the intergovernmental partnership and strengthen federalism by relying on state and local processes for the coordination and review of proposed Federal financial assistance and direct Federal development. The E.O. allows each state to designate an entity to perform this function. The official list of designated entities is posted on the website. Contact your state’s designated entity for more information on the process the state requires to be followed when applying for assistance. States that do not have a designated entity listed on the website have chosen not to participate in the review process.

Download the Application Package linked to this Funding Opportunity on Grants.gov to begin the application process. Downloading and saving the Application Package to your computer makes the required government-wide standard forms fillable and printable. Completed applications may be submitted by mail, by email, electronically through Grants.gov, or as otherwise described in the Grants.gov funding opportunity. Please select ONE of the submission options:

To submit an application through Grants.gov:

Go to the Grants.gov Apply for Grants page (http://www.grants.gov/web/grants/applicants/apply-for-grants.html) for an overview of the process to apply through Grants.gov. You/your organization must complete the Grants.gov registration process before submitting an application through Grants.gov. Registration can take between three to five business days, or as long as two weeks if all steps are not completed in a timely manner.

Important note on Grants.gov application attachment file names: Please do not assign application attachments file names longer than 20 characters, including spaces. Assigning file names longer than 20 characters will create issues in the automatic interface between Grants.gov and the Service’s financial assistance management system.

VI. Application Review Information Criteria: To be considered for funding, applications must meet the following criteria which will be used to review and rank the final list of proposals. Reviewers will recuse themselves from scoring any proposal in which there is a conflict of interest.

1. Technical merit – proposal methods demonstrate understanding of the statement of need and describes robust and efficient methodology to complete the work. (25 points)

2. Stakeholder engagement capacity – demonstrates history of sharing information and data throughout and after project work; and presented and published findings in media useful to aquatic habitat connectivity decision makers. (25 points)

3. Program and data management expertise – demonstrates ability to manage and develop database of potential Great Lakes tributary aquatic barriers. (25 points)

4. Cost per dams inventoried – proposal demonstrates efficient use of funds and provides low cost per number of dams attempted to be inventoried. (25 points)

Total possible points equals 100.

Review and Selection Process:

1. Application acceptance ‐ The Regional WSFR Offices determine agency eligibility and whether applications are complete, substantial, and contain only activities that are eligible. Applications that are ineligible are returned to the grantee. Revision and resubmission of returned applications is allowable up until the identified deadline for application submittals.

2. Application ranking – Science Applications staff will form a review team of at least 3 individuals and use the criteria listed above for their review and ranking.

3. Application selection – The selected project will receive final approval by the Assistant Regional Director for Science Applications. The award will be announced in July or August 2018. The successful applicant will receive a letter informing them that their application was awarded funding and the amount of the award.

Prior to participating in any review or evaluation process, all staff and peer reviewers, evaluators, panel members, and advisors must sign and return to the program office point of contact the “Department of the Interior Conflict of Interest Certification” form. For a copy of this form, contact the Service point of contact identified in the Agency Contacts section below.

Prior to award, the Service reviews the selected applicant’s statement regarding potential overlap or duplication in terms of activities, funding, or time commitment of key personnel and makes a determination regarding Service funding. Depending on the circumstances, modification of the application, other pending applications, or an active award may be necessary, or the Service might choose to not fund the proposed project.

Each fiscal year, for every entity receiving one or more awards in that fiscal year, the Service conducts a risk assessment based on eight risk categories. The result of this risk assessment is used to establish a monitoring plan for all awards to the entity in that fiscal year. For a copy of the Service’s risk assessment form, go to https://www.fws.gov/grants/atc.html.

Prior to approving an award with a Federal funding amount that exceeds or is expected to exceed the simplified acquisition threshold, as adjusted (see 2 CFR 200.88), the Service must review and consider any information about the applicant that is in the designated integrity and performance system accessible through SAM (currently FAPIIS; https://www.fapiis.gov/fapiis/index.action) to determine if, at a minimum, the information found in the system for the applicant demonstrates a satisfactory record of Federal award performance and integrity and business ethics (see 2 CFR 200.205(a)(2)). The Service must also report to FAPIIS if an applicant subject to this review is found not qualified for a particular award due to its prior record of integrity or performance under Federal awards (see 2 CFR 200.212).

VII. Award Administration Award Notices: Following review, applicants may be requested to revise the project scope and/or budget before an award is made. Successful applicants will receive written notice in the form of a notice of award document. Notices of award are typically sent to recipients by e-mail. If e-mail notification is unsuccessful, the documents will be sent by courier mail (e.g., FedEx, DHL or UPS). Award recipients are not required to sign/return the Notice of Award document. Acceptance of an award is defined as starting work, drawing down funds, or accepting the award via electronic means. Awards are based on the application submitted to, and as approved by, the Service. The notice of award document will include instructions specific to each recipient on how to request payment. If applicable, the instructions will detail any additional information/forms required and where to submit payment requests. Applicants whose projects are not selected for funding will receive written notice, most often by e-mail, within 30 days of the final review decision.

Domestic Recipient Payments: Prior to award, the Service program office will contact you/your organization to either enroll in the U.S. Treasury’s Automated Standard Application for Payments (ASAP) system or, if eligible, obtain approval from the Department of the Interior to be waived from using ASAP.

Domestic applicants subject to the SAM registration requirement (see Section III B.) who receive a waiver from receiving funds through ASAP must maintain current banking information in SAM. Domestic applicants exempt from the SAM registration requirement who receive a waiver from receiving funds through ASAP will be required to submit their banking information directly to the Service program. However, do NOT submit any banking information to the Service until it is requested from you by the Service program!

Foreign Recipient Payments: Foreign recipients receiving funds to a bank outside of the United States will be paid electronically through U.S. Treasury’s International Treasury Services (ITS) system.

Foreign recipients receiving funds electronically to a bank in the United States will be paid by Electronic Funds Transfer (EFT) through the Automated Clearing House network. Foreign recipients who wish to be paid to a bank account in the United States must enter and maintain current banking information in SAM (see Section III).

The Notice of Award document from the Service will include instructions specific to each recipient on how to request payment. If applicable, the instructions will detail any additional information/forms required and where to submit payment requests.

Transmittal of Sensitive Data: Recipients are responsible for ensuring any sensitive data being sent to the Service is protected during its transmission/delivery. The Service strongly recommends that recipients use the most secure transmission/delivery method available. The Service recommends the following digital transmission methods: secure digital faxing; encrypted emails; emailing a password protected zipped/compressed file attachment in one email followed by the password in a second email; or emailing a zipped/compressed file attachment. The Service strongly encourages recipients sending sensitive data in paper copy to use a courier mail service. Recipients may also contact their Service Project Officer and provide any sensitive data over the telephone.

Award Terms and Conditions: Acceptance of a financial assistance award (i.e., grant or cooperative agreement) from the Service carries with it the responsibility to be aware of and comply with the terms and conditions applicable to the award. Acceptance is defined as the start of work, drawing down funds, or accepting the award via electronic means. Awards are based on the application submitted to and approved by the Service and are subject to the terms and conditions incorporated into the notice of award either by direct citation or by reference to the following: Federal regulations; program legislation or regulation; and special award terms and conditions. The Service’s Standard Award Terms and Conditions are available on the Internet at https://www.fws.gov/grants/atc.html. If you do not have access to the Internet and require a full text copy of the award terms and conditions, contact the Service point of contact identified in the Agency Contacts section below.

Recipient Reporting Requirements:

Financial and Performance Reports:

Final Reports: Recipients are required to submit final financial and performance reports no later than 90 calendar days after the award period of performance end date or termination date, whichever comes first. For awards lasting 12 months or less, the final reports will be the only financial and performance reports required, except in unusual circumstances or if waived.

Interim Reports: For awards that last longer than 12 months, recipients are required to submit interim financial and performance reports no less frequently than annually and no more frequently than quarterly, except in unusual circumstances or if waived. Requiring a higher frequency of reporting than annual reporting will be based on the Service’s assessment of higher or other unusual circumstance. Quarterly and semiannual interim reports are due within 30 calendar days of the reporting period end date. Annual interim reports are due within 90 calendar days of the reporting period end date.

Recipients must use the Standard Form 425, Federal Financial Report for financial reporting, available on the Internet at http://www.grants.gov/web/grants/forms/post-award-reporting-forms.html#sortby=1.

Performance reports must contain: 1) a comparison of actual accomplishments with the goals and objectives of the award as detailed in the approved scope of work; 2) a description of reasons why established goals were not met, if appropriate; and 3) any other pertinent information relevant to the project results.

Significant Developments Reports: Events may occur between the scheduled performance reporting dates that have significant impact upon the supported activity. In such cases, recipients are required to notify the Service in writing as soon as the following types of conditions become known:

· Problems, delays, or adverse conditions that will materially impair the ability to meet the objective of the Federal award. This disclosure must include a statement of any corrective action(s) taken or contemplated, and any assistance needed to resolve the situation.

· Favorable developments that enable meeting time schedules and objectives sooner or at less cost than anticipated or producing more or different beneficial results than originally planned.

The Service will specify in the notice of award document the reporting and reporting frequency applicable to the award.

Conflict of Interest Disclosures: Recipients are responsible for notifying the Service Project Officer in writing of any actual or potential conflicts of interest that may arise during the life of this award.