OPPA Bid RFP.docx
DOCX document 73 KB Posted
- Attached to
- OPPA Interior Gym Bleacher Replacement
- Solicitation number
- RFP-OPSD-250000001890-1
- Issued by
- Berrien County, Michigan
About this file
This is a Request for Proposal (RFP) issued by the Oak Park School District in Oak Park, Michigan, soliciting bids for the replacement of interior gym bleachers at OPPA (Oak Park Public Academy). The district is seeking sealed bids to be submitted by 1:00 p.m. on Tuesday, April 8, 2025, with an intent to award the contract on April 24, 2025, during a regular Board of Education meeting. The project requires complete installation of new bleachers, with a mandatory completion date of August 8, 2025. Bidders must submit an original proposal and two copies, along with an electronic copy, and are required to include a certified check or bid bond for 5% of the total bid amount.
The RFP includes specific requirements such as providing a notarized Familial Disclosure Statement and an Iran Economic Sanctions form, with no state or local sales taxes applicable to the project. The contract will be awarded via purchase orders, and the successful vendor must provide a warranty guaranteeing materials and equipment to be free from defects for at least one year. Bidders can access detailed scope documents through a provided Ghafari FTP link with a specific password, valid until April 20, 2025. The district reserves the right to accept or reject any proposals and will make awards in a manner deemed in the best interest of the owner. Payments will be processed within 30 days after delivery and approval by the Board of Education.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OAK PARK SCHOOL DISTRICT
INVITATION TO BID
REPLACEMENT OF INTERIOR GYM BLEACHERS AT OPPA
The Oak Park School District will receive firm, sealed bids for the removal and replacement of the interior gym bleachers at OPPA.
Your proposal, and two copies marked “Replacement of Gym Bleachers” must be delivered no later than 1:00p.m, Tuesday, April 8, 2025, to Tiffany Cavill, Oak Park School District, 13900 Granzon, Oak Park, Michigan 48237, Included in the packet must be an electronic copy as well. It is the sole responsibility of the proposer to ensure their proposal is delivered on or before the closing date and hour as indicated. Late or electronic submissions will NOT be accepted.
Any clarification questions about this RFP shall be submitted in writing through email to tiffany.cavill@opsk12.org by the date provided within RFP. Questions will be answered and posted as an addendum on Sigma. The Contractor is responsible for checking for any changes, posted questions and answers, and/or addenda to this solicitation before submitting their proposal. The District will not be bound by oral responses to inquiries or written responses other than written addenda. Contractors are required to acknowledge all addenda in their Proposal. Failure to acknowledge receipt of any addenda may result in rejection of the proposal as being non-responsive.
The Oak Park School District Board of Education reserves the right to accept or reject any or all bids, either in whole or in part; to award the contract to other than the low bidder; to waive any irregularities and/or informalities; and in general to make awards in any manner deemed to be in the best interest of the owner.
Tiffany Cavill Director of Operations Oak Park School District 13900 Granzon St.
Oak Park, MI 48237
INSTRUCTIONS TO BIDDERS
PROPOSALS
1. The Oak Park School District will receive firm, sealed bids for the Replacement of Gym Bleachers in accordance with the attached specifications.
2. Your proposal, and two copies marked “Replacement of Gym Bleachers” must be delivered no later than 1:00p.m, Tuesday, April 8, 2025, to Tiffany Cavill, Oak Park School District, 13900 Granzon, Oak Park, Michigan 48237, Included in the packet must be an electronic copy as well. It is the sole responsibility of the proposer to ensure their proposal is delivered on or before the closing date and hour as indicated. Late or electronic submissions will NOT be accepted.
3. Proposals will be made in conformity with all the conditions outlined in the specifications. All items of furniture and equipment must conform to the specifications.
4. Any clarification questions about this RFP shall be submitted in writing through email to tiffany.cavill@opsk12.org no later than Monday, March 31, 2025. Questions will be answered and posted as an addendum on Sigma. It is the Contractor’s responsibility to check for any changes, posted questions and answers, and/or addenda to this solicitation before submitting their proposal. The District will not be bound by oral responses to inquiries or written responses other than written addenda. Contractors are required to acknowledge all addenda in their Proposal. Failure to acknowledge receipt of any addenda may result in rejection of the proposal as being non-responsive. Responses to questions will be posted by: Wednesday, April 2, 2025
5. References in the specifications to any article, product, material, fixture, form or type of construction, etc., by proprietary name, manufacturer, make or catalog number will be interpreted as establishing a standard quality of design and will not be construed as limiting proposals.
6. The Oak Park School District Board of Education reserves the right to accept or reject any or all proposals either in whole or in part; to waive any irregularities and/or informalities; and in general to make awards or cancel this proposal, if deemed to be in the best interests of the owner.
7. A completed Familial Disclosure and an Iran Economic Sanctions form must be included with each proposal submitted or the proposal will not be accepted. Please note these forms must be notarized.
8. Submit with each bid, a certified check or acceptable bid bond payable to the Oak Park School District, in an amount equal to five percent (5%) of the total bid. For bids in excel of $50,000, a Labor and Materials Payment Bond and a Performance Bond is required.
9. Prevailing Wage Requirement: This project is not subject to the Michigan Prevailing Wages on State Projects Act pursuant to MCL 408.1109(2)
SCOPE
This specification includes the replacement and installation of interior gym bleachers at OPPA. Please use the Ghafari link below for scope details.
The DR 01 – Issue For Bid package has been uploaded to the FTP site and can be accessed via the link and password provided below. It will remain active for 30 days, expiring on 04/20/25.
LINK: https://project.ghafari.com/Handlers/AnonymousDownload.ashx?folder=46bb02d5 PASSWORD: Ghafari
TAXES
State and local sales and use taxes are not applicable and will not be included in the proposal.
CONTRACT AWARD
The contract will be awarded in the form of PURCHASE ORDERS mailed to the Vendor(s) selected. It is the intent to award the bid on April 24, 2025 at the regular meeting of the Board of Education.
WITHDRAWAL OF BIDS
Any bidder may withdraw their bid at any time prior to the scheduled time for receipt of bids. No proposal may be withdrawn until after 45 days after the bid opening.
DELIVERY
All shipping costs should be included in the sealed bid. The awarded company may not invoice the school district for shipping costs if it is not included in the sealed bid. Job must be completed by August 8, 2025.
FIRM PRICING
Unit pricing will prevail when computing the total quantity on bids. No price allowance or extra consideration on behalf of the bidder will subsequently be allowed by reason of error or oversight on the part of the bidder
WARRANTY
All materials and equipment will be guaranteed to be free from defects in both workmanship and materials for no less than one year from the date of receipt/installation. If the manufacturer warranty exceeds this minimum requirement, the manufacturer warranty will prevail. Any item(s) found to be defective will be replaced or repaired within seven working days at Vendor(s) expense.
PERMITS
All necessary permits, tests, inspections, and approvals will be procured by the contractor(s) and will be included in the proposal.
PAYMENTS
Payment in full will be due and payable within thirty days after delivery, providing all goods are approved and accepted by the Board of Education and the contract having been fully performed.
DUE: 1:00 p.m., Tuesday, April 8, 2025 PROPOSAL: Replacement of Interior Gym Bleachers at OPPA
We propose to furnish and deliver the replacement of interior door locks in accordance with the specifications
SWORN AND NOTARIZED FAMILIAL DISCLOSURE STATEMENT
All Vendor/Contractor(s) submitting proposals must provide familial disclosure and attach this information to the proposal. The proposal will be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or key employee of the vendor submitting a proposal and any member of the Oak Park School District Board of Education or the Oak Park School District Superintendent. The District will not accept a proposal that does not include this sworn and notarized disclosure statement.
□ The following are the familial relationship(s):
Owner/Employee Name Related To Relationship
1.
2.
3.
Attach additional pages if necessary to disclose familial relationships.
□ There is no familial relationship that exists between the owner or key employee of the Vendor/Contractor(s) submitting a proposal and any member of the Oak Park School District Board of Education, or the Oak Park School District Superintendent.
INDIVIDUAL/FIRM NAME
BY (SIGNATURE)
PRINTED NAME AND TITLE
Subscribed and sworn before me, this
Seal:
day of , 20 , a Notary Public in and for County, (Signature) NOTARY PUBLIC
My Commission expires
CERTIFICATION OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner, or authorized officer of the below-named Company, pursuant to the compliance certification requirement provided in Oak Park School District’s Request For Proposal, the “RFP”, hereby certifies, represents, and warrants that the Company and its officers, directors and employees, is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event the Company is awarded a contract by Oak Park School District as a result of the aforementioned RFP, the Company is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the contract.
The Company further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of Oak Park School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date the it is determined that the person has submitted the false certification.
NAME OF COMPANY
NAME AND TITLE OF AUTHORIZED REPRESENTIVE
SIGNATURE
DATE
Acceptance of Proposal
The undersigned agrees to execute a Contract for work covered by this Proposal provided that he is notified of its acceptance within thirty days after the opening of the Proposal.
It is agreed that this bid will not be withdrawn until after forty-five (45) days after receipt of bids.
The undersigned affirms that the bid was developed without any collusion, undertaking, or agreement, either directly or indirectly, with any other bidder(s) to maintain the prices of the indicated work or prevent any other bidder(s) from bidding the work.
BIDDER’S FIRM NAME
BUSINESS ADDRESS
TELEPHONE NUMBER
FAX NUMBER
BY (SIGNATURE)
PRINTED NAME
TITLE
DATE
E-MAIL ADDRESS
| Fee Proposal |
| Cost |
Labor:
Materials:
Other:
Grand Total: