Decontamination Trailer Specifications

General Overview:

The interior of the trailer consist of two (2) areas, the rear decontamination area provisioned for two lanes that can separate gender for ambulatory and non-ambulatory patients. Each lane separated with curtains into four sections. The Undress Area, Wash Bay Area, Rinse bay Area and the changing room. The decontamination area can be opened wide enough for the personnel in level “A” suits. The full width capability provides greater room for decontamination support personnel.

The second area will be the utility room that will include the power distribution panels for for AC and Dc electricity, Apropane boiler for hot water generation, hot water tank for temporary heated water storage, A generator, and a decontamination user interface panel.

Stabizer Jacks:

It has four (4) crank down stabilizer jacks, each provided with 7,000 lbs. capacity located near trailer corners and level identifiers included located at each bottom corner of trailer, near stabilizer jacks.

Lightings:

All lightings will be LED, These includes (brakes, turn, parking, clearance, marker) Main Body Dimensions:

The overall length of the trailer is 24’, with the interior box length of 20’, and the overall height is 11’7”, the interior box height is 7’6” and the overall width is 8’6”. The gross trailer weight rating is 14,000 lbs. And the trailer weights enables a 1- ton vehicle to tow this trailer.

Doors:

Left Side:

One (1) Exit Fold Down ramp with railing curtain door and One (1) Utility Room Door Right Side:

One (1) Front Exit Fold Down Ramp with railing curtain Door and One (1) Door for Propane tanks One (1) Rear Entrance fold down Ramp provided with railing curtain and hand rail on each side

Exterior Features:

A fresh water inlet, a brass fitting with reducing valve shall be mounted through the front wall of the utility room, it has a female adaptor a 1 ½” NST coupling shall be placed on the exterior of the trailer for potable water fill/input.

Exterior Lightings:

Six (6) surface mounted halogen exterior perimeter lights mounted outside trailer, two (2) on the curbside and streetside, one (1) on the rear and on the front.

A weather resistant windsock with a ¾”O.D pipe non-corrosive bracket/fastener assembly mounted exterior in front of trailer.

The trailer shall have mud flaps installed and a full width aluminum liners to limit road splash and an outside fenderrete made of stainless steel provided as trim. Six (6) 35W weatherproof flood lights installed under chassis of the trailer to illuminate the ground around the perimeter of the trailer and the curbside entry steps.

Wash / Rinse Area Waste water management:

A water diverting pans installed and engineered to capture waste water from each wash / Rinse area to the available disposal bladders. The pans have two (2) inches drain. And a drain located under rear of the trailer with shut off valve provided water hose.

Floor Grate:

A chemical resistant in nature will be fit in each drain pan and will not slow or prevent the flow of water to the drain.

Decontamination Area Plumbing:

Exterior plumbing lines, valves, shower heads provided, ¾” pex pipe shall be used for decontamination plumbing to each of the interior shower heads, One (1) mixer valve to mix hot/cold water, Four (4) standard hose fittings for hand wand attachments and Four (4) hand wands, Two (2) sets in the Wash Bay, One (1) set above the curbside lane and above the streetside lane, Two sets in the Rinse Bay and One (1) above streetside lane. Four side spray rinse nozzles with 2.5 gpm located Two (2) in the Wash Bay – One (1) above the curbside lane, and One (1) above streetside lane, and Two (2) in the Rinse Bay – One above curbside lane and One above streetside lane. A ball valve control one (1) wall spray nozzle and one shower nozzle, The four shall be used to individually control the handwands

Wash Bay One will include:

· Two (2) flow through brushes for performing gross decon, with a 6’ stainless steel metal flex hose with stainless steel Quick disconnect (QD) fittings are included for this area.

· Two (2) handheld shower wand for rinsing, with 6’ stainless steel metal flex hoses with stainless steel QD’s are also included.

· QD fitting to be interchangeable with QD fittings on the exterior QD outlets.

· Ball valves are included to isolate control of the water in the gross decon areas and the shower areas., ( 1- fresh water and 1- solution )

· Privacy curtain inside entrance door.

· A 2” epoxy coated dam will separate the gray water into two (2) respective decon areas.

· The area ahead of the dirty area is the decon solution application area.

· It shall consist of a vertical manifold that has three (3) shower nozzles @ 1 GPM each.

· One (1) shower head nozzle @ 1 GPM in the center of the ceiling spraying straight down.

· Privacy curtain and a stainless steel trough drain.

· A 2” epoxy coated dam will separate the gray water into two (2) respective decon areas.

· The area ahead of the decon solution application area is the rinse area.

· It shall consist of a vertical manifold that has 3 shower nozzles @ 1 GPM each.

· Will have 1 shower head nozzle @ 1 GPM in center of ceiling spraying straight down.

· Privacy curtain and a stainless steel trough drain.

· A 2” epoxy coated dam will separate the gray water into two (2) respective decon areas.

The fourth area which is in front of the rinse area is the clean area, for drying off and dressing into clean clothing before leaving the site.

· A 24” long fold down aluminum bench will be provided in each clean area.

· This exit vestibule and is used to evaluate personnel making sure that they were fully decontaminated.

· Two (2) storage areas, approximately 42” W and 72” High x 12” D with four (4) adjustable shelves, are installed, One (1) in each clean room.

· Shelves are used for storage of of towels and suits.

· Cargo nets cover fronts of storage area to retain stored items in place.

· A 2” epoxy coated dam will separate the two (2) compartments.

The trailer should have (1) Tow connect Integrated System (TCISS) integrated including the following:

· One (1) 21 inches color LCD screen that provides wireless connectivity to the reverse camera mounted on the rear of the trailer.

· Monitor generator status, trailer door status and awning status.

· At generator failure, there should be an available plug that can be connected if the trailer is near building in order to power the trailer.

Plumbing for Exterior Booms:

· An exterior decon station will be installed on the curbside of the trailer.

· Each decon station will consist of two (2) stailess steel shower booms that swing out from the trailer to distribute decon solution and rinse water.

· Each boom is equipped with three (3) nozzles attached with QD fittings for easy interchageability with other decon accessories.

· The rear booms will be plumbed to distribute decon solution.

· The front booms will be plumbed to distribute rinse water.

· An adjustable metering system for concentrated decon solution with desired percentage of dilutionsupplying the interior decon stations will also meter solution into the solution booms.

· Cotrol valves will be mounted on each side of the trailer to operate each boom. Valves will be located near each boom.

Awnings:

· One (1) 8’ x 20’ awning will be installed on the curb side of the trailer.

· One (1) 8’ x 20’ awning will be installed on the street side of the trailer.

· Awnings will be white in color.

· Two (2)Awning brackets and Awning pullers located in the utility room.

· Privacy curtains will be installed on 3 sides of the awning.

· Curtain assembly to be constructed in 3 pieces ( 1 pc full length side curtain, 1 pc full width each end curtain.

· Each piece of curtain independently secured to pole frame so that end curtains can be removed while side curtain remains erected.

· Velcro flaps on end curtains will cover onto side curtain to maximize privacy. Velcro straps to retain flaps in open position. Curtains are to constructed of 20 lb. vinyl material.

Miscellaneous:

· Labelling: All control switches, faucets, valves, function indicators, etc. to be labeled with engraved vinyl self-adhesive signaged. All load center breaker functions to be labeled for easy identification.

· An operations manual will be included.

· Conspicuity tape around the lower portion of the trailer & tongue.

Back up Water Tank:

A Three (3) 1000 liters total system capacity back up water tanks fitted to the trailer frame to supply system ahead of tanker or mains water supply. One (1) electric compressor for winterization provided in the utility room to quickly blow out the entire water system on the trailer. Water supply for all the nozzles provided with sufficient pressure from 20-60 psi. ( water pump back up ).

Gray Water Tank :

Located under the trailer, 250 gallon polyethelene tank with a 1 ½ “ discharge ball valve includes a cam fitting.

· Water is to be discharge through a supplied 1 ½” hose with cam fittings.

· There will be a discharge pump to enhance the flow of water into the holding tank or Bladder tank.

· A manual drain shall be installed with a cap.

System shall be provided for concentrated decon solutions with desired percentage of dilution to be metered into shower system.

· Concentrate is pumped out of 5 gallon buckets, an adjustable metering distribution system to inject into the solution distribution heads.

· Decon solution metering valve is located in the utility room on the curb side of the trailer

· System should driven by water volume not water pressure.

· Two (2) 5 gallon decon solution located in the utility room

Decontamination Bay Separation:

A sliding center curtain secured the floor and ceiling to create gender separated lanes for Ambulatory and Non – Ambulatory patients and can be pulled to the front wall to create one (1) wider Non-Ambulatory lane and curtain securable to to keep it in an open/closed position. Sliding privacy curtains secured to the floor and ceiling and be used to separate Undress, Wash, Rinse and changing Areas.

LED lights:

Inside the trailer there will be Eight (8) water tight (8) inch flight fixtures installed, Six (6) in the Decontamination Area mounted evenly between walls, Three (3) per lane, and two (2) in the utility room. Four (4) 20A duplex outlets will be installed in the Utility Room of the trailer, Four GFCI duplex outlets with weatherproof covers installed on the exterior of the trailer – Two (2) on the curbside and Two (2) on the streetside. It has a 12V DC system, a One 12V distribution panel installed in the trailer and all has a circuit breakers that is resettable and sized for the power requirements of each circuit. It has a AC to DC converters integrated to provide sufficient power to all trailer based 12V DC systems. The converter directly connected to the system to provide both the primary source of 12V DC power for the trailer system as well as providing a charge to the battery bank. Also include reverse polarity protection, power failure protection and a cooling pan controlled by converter/chargers internal ambient temperature.

Trailer Wiring:

All electrical circuits and appliances will be UL listed, the trailer will be wired for 120/240V AC and 12V DC.

Generator:

A 16 KW (20 KV) at 60 Hz Onan Commercial Quiet generator with decibel rating of 68 db at 10 feet. Protected with overload set field, loss of AC sense protection,mechanical protection, detects starter faults, reverse connections and high battery voltage protection, automatic resseting of DC circuit overcurrent protection for set wiring and remote start wiring,fuel filter, automatic choke, Electricfuel shut off solenoid (LPG), A remote start panel with hour meter and multifunction digital monitor to read AC/DC Amp. Load.

Propane Tanks:

Two (2) 100 lb. propane tanks installed on the front of the chassis to provide an on board fuel supply for the generator and water heater. Propane tanks supply the water heaters.

HVAC:

Two (2) powered roof vents shall be included, One (1) each per lane. The trailer will be cooled with One (1) 110 AC, 60 HZ, single phase roof mounted high efficiency AC unit with a cooling capacity output of 13,500 BTU per unit, a heat strip will be added, and each unit is equipped with 1/3 HP fan motor that delivers cool air at 320 CFM.

Smoke/Carbon Monoxide Detectors:

Two (2) 9-volt combination smoke and carbon monoxide detectors will be installed. One (1) in the utility room and One (1) in the changing room.

Fire Extinguisher: One (1) ten pound fire extinguisher class ABC installed in the utility room.

Optional Equipment: One (1) push button electric tongue jack can be included raise or lower the trailer into position when connecting or disconnecting the trailer.

Manually Controlled Awning:

One (1) dometic deployable awning can be provided and installed on the curbside of the trailer body, length running entire body and allowing for emergency warning light clearance. It can be extended and retracted by a single operator, Two no flap-claps will be provided, an aluminum cover will be provided to protect from weathering.

Trailer Color:

The color of the trailer will be Red with the organizational Name and Logo.

Roof Access Ladder:

One heavy aluminum roof access ladder will be installed on the rear of the trailer.

Portable Conveyor System:

Two (2) highly portable, 12 foot, collapsible, aluminum conveyor system and supporting conveyor board can be provided and stored in the utility room when not in use and it weigh no more than 57 lbs. and shall have a stored footprint of no more than 8” X 41” X 31”.

· Four (4) hand lantern, streamlight fire Vulcan (LED) hand lights, orange color,Model # 44451.

· Ten (10) Decon brushes, automotive approved scrub brush 7” inch head with wood handle can be provided.

Exterior Waste Water Storage:

Self rising water bladders can be provided for off-board containment of run-off water and stored in the Utility Room when not in use. Bladders are available in a variety of capacities and include both inlet and outlet-each with a shut off valve- along with a relief valve.

Shore Power Inlet:

One (1) kussmaul Battery Charger Inlet, one Kussmaul Auto Eject 20,20 amp 120V shore power inlet will be installed, one (1) 25’ amp 120V shore power cord will be installed.

First Aid Kit.

First Aid Kit cabinet will be installed in the trailer, will feature a red first aid logo on the door, equipped with different first aid supplies.

Tow Connect Integrated Safety System:

One (1) Tow Connect Integrated System (TCISS) integrated in the trailer and includes, One (1) Wireless 7”Color LCD Touch Screen,and the TCISS LCD can be set up in 15 seconds and the TCISS LCD screen will provide wireless connectivity to the reverse camera mounted on the rear of the trailer, and can monitor- Generator status, Trailer Door Status and Awning Status. And the trailer equipped with a Backing Safety System.

· Failure of the generator, there should be an available plug that can be connect if the trailer is near the building to power the trailer?

Equipments :

Tyvek Suits with hood in different sizes :

· 20 XL

· 20 L

· 20 M

Filterized mask ( Full Face Mask) in different sizes:

· 10 L

· 10 M

· 10 S

Spare Filters – 50 pcs

Nitrile Hazmat chemical Rubber gloves in sizes:

· L – 5 Carton

· M – 5 Carton

· S – 5 Carton

Hazmat Boots in sizes:

· 5 XL

· 5 L

· 5M

· 5 S

· 10 - Spill Kit That can be used on different chemical spills.

References:

· Emergency Response Guide Books and CD’s ( Latest Edition )

Training:

· One (1) Week on site training on operation of the vehicle shall be provided .