Attachment_1,_PWS.pdf
PDF 47 KB Posted
- Solicitation number
- OPIC-18-Q-0006
- Issued by
-
Overseas Private Investment Corporation
About this file
Attachment 1, Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3,_Pricing.xls | XLS spreadsheet | |
| RFQ_OPIC-18-Q-0006.pdf | ||
| Attachment_2,_OPIC_Terms_and_Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Chile Solar Study
1.0 Introduction
The Overseas Private Investment Corporation (OPIC) exposure at risk in Chile currently involves five solar PV power plants: San Andrés, Amanecer, Luz del Norte, Salvador and Crucero. The current outstanding balance of OPIC’s loans to these projects is over $500 million and several of these loans are in default.
In this context, OPIC requires updated market studies that forecast energy spot prices at the connection nodes of these power plants. This market study will be based on key drivers like demand, fuel prices and development costs of renewable and conventional technologies; however, it is possible that variations on these bases may also be considered as sensitivity studies to be performed in a second stage.
2.0 Objectives
Obtain updated market studies for OPIC’s five Chilean solar projects for the purposes of updating the financial model. The objective is to update each project’s financial model in order to determine the Net Present Value of each plant. This information will inform OPIC’s strategy to maximize recovery of each loan and underpin calculations for OPIC’s reserves based on the expected Loss Given Default.
3.0 Scope
a. The contractor will update the description of the main characteristics of the SEN, with special emphasis on the supply-demand situation of the former SING and SIC areas, which were interconnected in November 2017. The contractor will provide historical data in term of the evolution of demand, fuel sources, energy matrix, spot and contract prices, reserve margin, installed capacity, market shares of main players and main generation and transmission projects underway, among others. The contractor will include a brief assessment of the present and short term supply-demand situation in the SEN.
b. The contractor will make projections of the SEN expansion, spot prices at the connection nodes and expected dispatch and revenues for each one of the 5 Power Plants under analysis.
- The contractor will determine the SEN expansion for a given set a assumptions regarding key drivers like GDP growth and demand projection, evolution of fuel prices, short term system expansion and development costs of technologies like wind and solar. Alternative scenarios may be studied.
- The contractor will calculate spot prices, dispatch of the Power Plants and revenues when selling the energy produced to the spot market for 20 blocks of hours in each month of the study horizon. These blocks represent the daily load curve in working and non-working days as well as the hours where solar PV and wind injections occur along the day. These blocks can be allocated to 8,760 hours of each year. Thirty-one (31) historical hydro-conditions occurred from 1984 until 2014, and will be simulated for each year, combined with 3 wind conditions (high, medium and low).
- The final report will include annual average spot prices (considering all these conditions) together with the hourly profile for working and non-working days. The report will also include average spot prices for dry (average of 10% driest hydro-conditions) and wet (average of 10% wettest hydro-conditions) representative hydro-conditions. Monthly values will be provided in Excel files
- The final report will include energy revenues of each Power Plant as annual value and revenues for dry and wet hydro-conditions. Monthly values will be provided in Excel files.
- Capacity revenues of each Power Plant will be determined on the basis of their adequacy capacity, which will be calculated in accordance with the existing regulations. Ancillary services and transmission charges will also be evaluated.
c. If requested by OPIC, the annual margin (in relation to the spot revenues) of the PPA´s of some of the Power Plants will be calculated. Monthly values will be provided in Excel files.
4.0 Tasks
a. Preliminary Report – base case report will be prepared within one month
b. Alternate Scenario Reports – per request deliverable within 1.5 weeks
c. Final report delivered 1 week after receiving comments on Preliminary Report
d. Annual Updates upon OPIC request.
5.0 Acceptance Criteria
OPIC will authorize payment as follows:
Description Payment Acceptance of reports Upon approval of the invoice for service. Terms as specified in the contract.
6.0 Travel
Travel is not required. OPIC personnel may meet with contractor in Santiago, Chile as part of project site visit.
7.0 Place of Performance
Work will occur in Santiago, Chile.
8.0 Period of Performance
Contract is for one (1) year with three (3) option years. It is anticipated that it will take six weeks for the initial study with updates every 6 months to once a year as needed.
9.0 Contractor Furnished Material
None required.
10.0 Government Furnished Property
None required.
11.0 Performance Requirements Summary
Performance Objective
Standard Performance threshold
Method of surveillance
Responsible for surveillance
Preliminary Report
Timely and error-free.
100% complete at submission of proposal
Routine surveillance and review by Government staff.
COR and contractor PM
Alternate Scenario Reports
Timely and error-free.
100% complete at submission of proposal
Routine surveillance and review by Government staff.
COR and contractor PM
Final Report Timely and error-free.
100% complete at submission of proposal
Routine surveillance and review by Government staff.
COR and contractor PM
Annual updates Timely, error-free, and organized updates.
100% complete at submission of proposal
Routine surveillance and review by Government staff.
COR and contractor PM
12.0 Deliverables
Deliverable Frequency Medium Number of Copies
Recipient
Preliminary Report
Within one month of contract award
Electronic, MS Word or PDF
1 COR
Alternate Scenario Reports
Per request deliverable within 1.5 weeks
Electronic, MS Word or PDF
1 COR
Final Report Once Electronic, MS Word or PDF
1 COR
Annual updates Three additional reports if needed and requested by
OPIC
Electronic, MS Word or PDF
1 COR
| Performance Work Statement |
| 1.0 Introduction |
| 2.0 Objectives |
| 3.0 Scope |
| 4.0 Tasks |
| 5.0 Acceptance Criteria |
| 6.0 Travel |
| 7.0 Place of Performance |
| 8.0 Period of Performance |
| 9.0 Contractor Furnished Material |
| 10.0 Government Furnished Property |
File details come from the government source that posted it.