Open-End Design Agreement.doc
DOC document 39 KB Posted
- Attached to
- Open-End Design Services
- Solicitation number
- 90-202324-04
- Issued by
- Onslow County, North Carolina
About this file
This document is an Open-End Design Agreement from the Coastal Carolina Community College in North Carolina, seeking Letters of Interest for design services. The college is requesting 3 copies of the current SF 254 form along with a letter of interest and information package not exceeding 10 pages. The selection criteria include factors such as specialized expertise, past performance, staffing, workload, design approach, cost and schedule management, construction administration, and familiarity with the project location. Submittals must be received by the stated publish date of April 9, 2024.
The open-end design agreement will cover an unspecified budget and source of funds, with an approved OC-25 number referenced. No other pricing or funding details are provided. This opportunity is open to all qualified firms, with no mention of incumbent contractors or set-asides.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department/Agency Coastal Carolina Community College
| Project Name |
| Open-End Design Agreement |
| Design Services |
| Architectural |
| Scope |
| Open-End Designer |
| Contact |
| Carol Lurz |
| Telephone |
| 910-938-6343 |
| Fax |
| 910-455-1176 |
| Lurzc@coastalcarolina.edu |
Budget Estimate
Source of Funds
Approved OC-25 #(s)
| Publish Date |
| April 9, 2024 |
Submit 3 Copies of Letter of Interest and SF-254
Carol Lurz Coastal Carolina Community College
444 Western Blvd.
Jacksonville, NC 28546
SELECTING CRITERIA
In selecting the three firms to be presented, the pre-selection committee should take into consideration qualification information including such factors as:
1. Specialized or appropriate expertise in the type of project.
2. Past performance on similar projects.
3. Adequate staff and proposed design or consultant team for the project.
4. Current workload and State projects awarded.
5. Proposed design approach for the project including design team and consultants.
6. Recent experience with project costs and schedules.
7. Construction administration capabilities.
8. Proximity to and familiarity with the area where the project is located.
9. Record of successfully completed projects without major legal or technical problems.
10. Other factors that may be appropriate for the project.
SUBMITTAL CRITERIA
Please submit three (3) copies of current SF 254 form with the required letter of interest and the information package. In the interest of costs-savings to the designers, consistency of the submittals and more efficient use of time by the pre-selection committee, the submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The package length should not exceed ten (10) pages plus the SF 254 form.
File details come from the government source that posted it. Updated .